HomeMy WebLinkAbout706 DailiesReport No.1 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 2, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer 1 Remove Fence 40' Labor Labor Labor Equip Equip Labor Central Coast Fence PM Operator Labor Sergio Urive M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max79_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management Name Insp Signature Printed Name Title Labor Labor Notes: Removed vegetation in the work area and potholed existing conduits at the conduit marker to verify location and depth. Completed layout of the Power Block foundation and commenced excavation operations. Performed layout for sawcutting in preparation for upcoming concrete removal. Material: Foreman Checked Name Name Name Brett Sinkovich Name Name Report No.2 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 3, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer 6.5 Sawcut concrete Coastal Demo PM Operator Labor Dal Caudill Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max79_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 6.5 6.5 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes: Completed excavation of power block slab. Subgrade was compacted. Concrete areas for conduit and pull boxes were cut by Coastal Demo. Electricraft began layout and conduit placement. Two ten yard roll off of soil was hauled off. Foreman Checked Truck Trailer Brett Sinkovich Labor Labor Report No.3 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 4, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Compaction Testing Earth Systems PM Operator Labor Sydney Limberg Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max79_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes: Began demolition of concrete for utility trenches. Electricraft continued conduit layout. One ten yard roll off was hauled out. 30 yds total. Foreman Checked Trailer Brett Sinkovich Labor Labor Report No.4 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 5, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer 8 Labor Labor Labor Equip Equip Labor Costal Demo PM Operator Labor Jacob Mosley M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max69_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Continue demolition of concrete for utility trenches. Coastal Demo came back to saw more relief cuts to minimize spalling. Electricraft continued conduit layout. Compaction test on native sub grade passed. Foreman Checked Truck Trailer Brett Sinkovich App Elect Report No.5 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 5, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Labor Labor Labor Equip Equip Labor PM Operator Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max69_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Continue demolition of concrete for utility trenches and began trenching. Electricraft continued placing conduit in Power Block foundation. Foreman Checked Truck Brett Sinkovich App Elect Report No.6 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 9, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer PM Operator Labor Labor Labor Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max69_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes: Continue trenching for electrical conduits in charging area. Electricraft continued placing conduit in Power Block foundation. Foreman Checked Brett Sinkovich Labor Labor Report No.7 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 10, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Labor Labor Labor Equip Equip Labor PM Operator Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 49 Max69_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Completed trenching for electrical conduits in charging area. Electricraft placed two new 3/4" conduits to each charging station. Newton began backfilling trenches. Foreman Checked Brett Sinkovich App Elect Report No.8 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 11, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Labor Labor Labor Equip Equip Labor PM Operator Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 57 Max79_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Completed backfilling conduits in charging area and began placing pull boxes. Electricraft placed two new 3/4" conduits to each charging station and continued power block conduit and template construction. Foreman Checked Brett Sinkovich App Elect Report No.9 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop March 12, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Labor Labor Labor Equip Equip Labor Earth Systems PM Operator Insp Sydney Limberg M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 58 Max80_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Placed pull boxes. Earth Systems performed compaction testing in parking lot trenches. Compaction tests failed to meet the 95% minimun density. Electricraft continued power block conduit and template construction. Foreman Checked Brett Sinkovich App Elect Report No.10 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop March 13, 2026 8 Grant Wicks 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Earth Systems Operator Labor Insp Eileen Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 54 Max80_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 10 9 Crew Truck Insp Signature Printed Name Title App Elect Notes: Placed pull boxes. Earth Systems performed compaction testing in parking lot trenches. Compaction tests passed. Electricraft continued power block conduit and template construction. Electricraft stayed late to complete power block conduit and template installation. Foreman Checked Brett Sinkovich Labor Labor Report No.11 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop March 16, 2026 Sam Gonzales III 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Truck Mason Labor Labor Equip Equip Labor PM Operator Labor Mason Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 61 Max 82_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes:Placed and compacted sand backfill in power block area. Dowels were drilled and placed along with rebar in charging area trenches. Electricraft began dowelling for chargers. Foreman Checked Brett Sinkovich App Elect Report No.12 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 17, 2026 Sam Gonzales III 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Truck PM Mason Mason Labor Mason Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 61 Max 82_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes:Constructed formwork for power block pad. Poured concrete in charging/parking area Electricraft completed drilling and placing bolts for chargers. Foreman Checked Brett Sinkovich Labor Labor Report No.13 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 18, 2026 Sam Gonzales III 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Truck PM Labor Mason Labor Mason Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 65 Max 87_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes:Coontinued to construct formwork for power block pad. Patched concrete spalls in charging/parking area Electricraft began assembling and placing chargers. Foreman Checked Brett Sinkovich Labor Labor Report No.14 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 19, 2026 Sam Gonzales III 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Truck 3 Earth Systeems Insp Chase Hundermak Mason Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 63 Max 91_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title App Elect NotesPower block pad was poured. Earth Systems took concrete cylinder samples. Electricraft continued assembling and placing chargers. Foreman Checked Brett Sinkovich Labor Labor Report No.15 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 20, 2026 Sam Gonzales III 8 Labor Labor Equip Cat 305 J2003 Equip Truck Equip Utility Trailer Truck Mason Labor Labor Equip Equip Labor PM Labor Mason Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 56 Max 83_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Power block pad concrete forms were stripped. Adjecent areas were graded and final grubbing performed. Final pull box was installed. Parking/charging area was pressure washed. Electricraft began pulling and installing data cables. Foreman Checked Brett Sinkovich App Elect Report No.16 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 23, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip Labor Labor Labor Equip Equip Labor PM Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 56 Max 83_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Notes: Electricraft began assembling the power blocks. Foreman Checked Brett Sinkovich App Elect Report No.17 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 24, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip 4.5 Central Coast Fence PM Labor Joshua Long Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 555 Max 84_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 4.5 4.5 8 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes: Electricraft continued assembling the power blocks. Central Cost Fence installed fence poles for new fencing around power blocks. Foreman Checked Brett Sinkovich Labor Labor Truck _ Report No.18 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 25, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip 8 Central Coast Fence PM Labor Joshua Long Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 555 Max 84_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 8 8 8 Crew Truck Insp Signature Printed Name Title App Elect Notes: Electricraft continued assembling the power blocks.Electricraft performed a power shut down and connected new primary wire. Central Cost Fence installed the new fence panels around power blocks. Foreman Checked Brett Sinkovich Labor Labor Truck _ Report No.19 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 26, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip PM Labor Labor Labor Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 54 Max 79_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title App Elct Notes: Electricraft continued assembling the power blocks. Cable to be upsized per RFI 005 Foreman Checked Brett Sinkovich Labor Labor Truck Report No.20 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 27, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip 2 Labor Labor Labor Equip Equip Labor Golden State Striping PM Labor Nate Hernandez M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 54 Max 79_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 2 8 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Truck Notes: Electricraft continued assembling the power blocks. Cable to be upsized per RFI 005. NCM began demobilisation. Golden state placed 630' of reflective striping. Striping paint with glass beads were used in lieu of thermo to match the existing striping. Foreman Checked Brett Sinkovich App Elect Report No.21 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 30, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip Labor Labor Labor Equip Equip Labor PM Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 54 Max 68_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Truck Notes: Electricraft continued pulling cable and connecting chargers. Foreman Checked Brett Sinkovich Labor Electricraft Journey Elect Report No.22 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 March 31, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip Labor Labor Labor Equip Equip Labor PM Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 53 Max 64_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 8 8 Crew Truck Insp Signature Printed Name Title Labor Labor Truck Notes: Electricraft continued pulling wire and constrructing ppower block and charger components. Foreman Checked Brett Sinkovich Journey Elect Report No.23 Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330 April 1, 2026 ContractIdle/Elsewhere/OtherForce AccountLabor Labor Equip Equip Equip PM Labor Labor Labor Labor Labor Labor Equip Equip Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min 53 Max 64_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Battery Electric Bus Charging Infrastructure Spec #: 2000402_403 Project Contractor: Newton Construction Management 8 Crew Truck Insp Signature Printed Name Title Electricraft Journeyman Elect Notes: Electricraft continued constructing ppower block and charger components. Connections were tested annd the site cleaned up. Foreman Checked Brett Sinkovich Labor Labor Truck Report No. Date ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start Stop Idle/Elsewhere/OtherForce AccountLabor Labor Labor Name Labor Name Labor Name Name Name Name Foremen Labor Labor Labor Labor Name Labor Labor Labor Labor Labor Labor Labor M Remarks EQUIPMENT AND/OR LABOR Labor Class DESCRIPTION Workers Name / Equipment) Temp: Min Max_ City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT T W T F S S Circle Day HOURS -ITEM NO.WEATHER Project Title: Spec #: Project Contractor: Name Insp Signature Printed Name Title Name Name Notes: Material: Foreman Checked Name Name Name Bryce Crespin Labor Labor