HomeMy WebLinkAbout706 DailiesReport No.1
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 2, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
1 Remove Fence 40'
Labor
Labor
Labor
Equip
Equip
Labor
Central Coast Fence
PM
Operator
Labor Sergio Urive
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max79_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
Name
Insp
Signature Printed Name Title
Labor
Labor
Notes: Removed vegetation in the work area and potholed existing conduits at the conduit marker to verify
location and depth. Completed layout of the Power Block foundation and commenced excavation
operations. Performed layout for sawcutting in preparation for upcoming concrete removal.
Material:
Foreman Checked
Name
Name
Name
Brett Sinkovich
Name
Name
Report No.2
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 3, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
6.5 Sawcut concrete
Coastal Demo
PM
Operator
Labor Dal Caudill
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max79_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
6.5
6.5
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes: Completed excavation of power block slab. Subgrade was compacted. Concrete areas for conduit and pull boxes were
cut by Coastal Demo. Electricraft began layout and conduit placement. Two ten yard roll off of soil was hauled off.
Foreman Checked
Truck
Trailer
Brett Sinkovich
Labor
Labor
Report No.3
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 4, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Compaction Testing
Earth Systems
PM
Operator
Labor Sydney Limberg
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max79_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes: Began demolition of concrete for utility trenches. Electricraft continued conduit layout. One ten yard roll off was hauled
out. 30 yds total.
Foreman Checked
Trailer
Brett Sinkovich
Labor
Labor
Report No.4
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 5, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
8
Labor
Labor
Labor
Equip
Equip
Labor
Costal Demo
PM
Operator
Labor Jacob Mosley
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max69_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Continue demolition of concrete for utility trenches. Coastal Demo came back to saw more relief cuts to minimize
spalling. Electricraft continued conduit layout. Compaction test on native sub grade passed.
Foreman Checked
Truck
Trailer
Brett Sinkovich
App Elect
Report No.5
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 5, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Labor
Labor
Labor
Equip
Equip
Labor
PM
Operator
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max69_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Continue demolition of concrete for utility trenches and began trenching. Electricraft continued placing conduit in
Power Block foundation.
Foreman Checked
Truck
Brett Sinkovich
App Elect
Report No.6
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 9, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
PM
Operator
Labor
Labor
Labor
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max69_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes: Continue trenching for electrical conduits in charging area. Electricraft continued placing conduit in Power Block
foundation.
Foreman Checked
Brett Sinkovich
Labor
Labor
Report No.7
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 10, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Labor
Labor
Labor
Equip
Equip
Labor
PM
Operator
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 49 Max69_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Completed trenching for electrical conduits in charging area. Electricraft placed two new 3/4" conduits to each charging
station. Newton began backfilling trenches.
Foreman Checked
Brett Sinkovich
App Elect
Report No.8
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 11, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Labor
Labor
Labor
Equip
Equip
Labor
PM
Operator
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 57 Max79_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Completed backfilling conduits in charging area and began placing pull boxes. Electricraft placed two new 3/4" conduits
to each charging station and continued power block conduit and template construction.
Foreman Checked
Brett Sinkovich
App Elect
Report No.9
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop
March 12, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Labor
Labor
Labor
Equip
Equip
Labor
Earth Systems
PM
Operator
Insp Sydney Limberg
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 58 Max80_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Placed pull boxes. Earth Systems performed compaction testing in parking lot trenches. Compaction tests failed to
meet the 95% minimun density. Electricraft continued power block conduit and template construction.
Foreman Checked
Brett Sinkovich
App Elect
Report No.10
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop
March 13, 2026
8
Grant Wicks 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Earth Systems
Operator
Labor
Insp Eileen
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 54 Max80_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
10
9
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes: Placed pull boxes. Earth Systems performed compaction testing in parking lot trenches. Compaction tests passed.
Electricraft continued power block conduit and template construction. Electricraft stayed late to complete power block conduit
and template installation.
Foreman Checked
Brett Sinkovich
Labor
Labor
Report No.11
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop
March 16, 2026
Sam Gonzales III 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Truck
Mason
Labor
Labor
Equip
Equip
Labor
PM
Operator
Labor
Mason
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 61 Max 82_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes:Placed and compacted sand backfill in power block area. Dowels were drilled and placed along with rebar in charging
area trenches. Electricraft began dowelling for chargers.
Foreman Checked
Brett Sinkovich
App Elect
Report No.12
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 17, 2026
Sam Gonzales III 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Truck
PM
Mason
Mason
Labor
Mason
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 61 Max 82_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes:Constructed formwork for power block pad. Poured concrete in charging/parking area Electricraft completed drilling and
placing bolts for chargers.
Foreman Checked
Brett Sinkovich
Labor
Labor
Report No.13
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 18, 2026
Sam Gonzales III 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Truck
PM
Labor
Mason
Labor
Mason
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 65 Max 87_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes:Coontinued to construct formwork for power block pad. Patched concrete spalls in charging/parking area Electricraft
began assembling and placing chargers.
Foreman Checked
Brett Sinkovich
Labor
Labor
Report No.14
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 19, 2026
Sam Gonzales III 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Truck
3
Earth Systeems
Insp Chase Hundermak
Mason
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 63 Max 91_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
NotesPower block pad was poured. Earth Systems took concrete cylinder samples. Electricraft continued assembling and
placing chargers.
Foreman Checked
Brett Sinkovich
Labor
Labor
Report No.15
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 20, 2026
Sam Gonzales III 8
Labor
Labor
Equip Cat 305 J2003
Equip Truck
Equip Utility Trailer
Truck
Mason
Labor
Labor
Equip
Equip
Labor
PM
Labor
Mason
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 56 Max 83_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Power block pad concrete forms were stripped. Adjecent areas were graded and final grubbing performed. Final pull
box was installed. Parking/charging area was pressure washed. Electricraft began pulling and installing data cables.
Foreman Checked
Brett Sinkovich
App Elect
Report No.16
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 23, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
Labor
Labor
Labor
Equip
Equip
Labor
PM
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 56 Max 83_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Notes: Electricraft began assembling the power blocks.
Foreman Checked
Brett Sinkovich
App Elect
Report No.17
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 24, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
4.5
Central Coast Fence
PM
Labor Joshua Long
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 555 Max 84_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
4.5
4.5
8
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes: Electricraft continued assembling the power blocks. Central Cost Fence installed fence poles for new fencing around
power blocks.
Foreman Checked
Brett Sinkovich
Labor
Labor
Truck
_
Report No.18
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 25, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
8
Central Coast Fence
PM
Labor Joshua Long
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 555 Max 84_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
8
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elect
Notes: Electricraft continued assembling the power blocks.Electricraft performed a power shut down and connected new
primary wire. Central Cost Fence installed the new fence panels around power blocks.
Foreman Checked
Brett Sinkovich
Labor
Labor
Truck
_
Report No.19
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 26, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
PM
Labor
Labor
Labor
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 54 Max 79_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
App Elct
Notes: Electricraft continued assembling the power blocks. Cable to be upsized per RFI 005
Foreman Checked
Brett Sinkovich
Labor
Labor
Truck
Report No.20
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 27, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
2
Labor
Labor
Labor
Equip
Equip
Labor
Golden State Striping
PM
Labor Nate Hernandez
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 54 Max 79_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
2
8
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Truck
Notes: Electricraft continued assembling the power blocks. Cable to be upsized per RFI 005. NCM began demobilisation.
Golden state placed 630' of reflective striping. Striping paint with glass beads were used in lieu of thermo to match the existing
striping.
Foreman Checked
Brett Sinkovich
App Elect
Report No.21
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 30, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
Labor
Labor
Labor
Equip
Equip
Labor
PM
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 54 Max 68_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Truck
Notes: Electricraft continued pulling cable and connecting chargers.
Foreman Checked
Brett Sinkovich
Labor
Electricraft
Journey Elect
Report No.22
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
March 31, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
Labor
Labor
Labor
Equip
Equip
Labor
PM
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 53 Max 64_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
8
8
Crew Truck
Insp
Signature Printed Name Title
Labor
Labor
Truck
Notes: Electricraft continued pulling wire and constrructing ppower block and charger components.
Foreman Checked
Brett Sinkovich
Journey Elect
Report No.23
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start 0700 Stop 330
April 1, 2026
ContractIdle/Elsewhere/OtherForce AccountLabor
Labor
Equip
Equip
Equip
PM
Labor
Labor
Labor
Labor
Labor
Labor
Equip
Equip
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min 53 Max 64_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title: Battery Electric Bus Charging Infrastructure
Spec #: 2000402_403
Project Contractor: Newton Construction Management
8
Crew Truck
Insp
Signature Printed Name Title
Electricraft
Journeyman Elect
Notes: Electricraft continued constructing ppower block and charger components. Connections were tested annd the site
cleaned up.
Foreman Checked
Brett Sinkovich
Labor
Labor
Truck
Report No.
Date
ENGINEERING INSPECTOR'S DAILY REPORT Contractor's Shift Hours Start Stop
Idle/Elsewhere/OtherForce AccountLabor
Labor
Labor Name
Labor Name
Labor Name
Name
Name
Name
Foremen
Labor
Labor
Labor
Labor Name
Labor
Labor
Labor
Labor
Labor
Labor
Labor
M
Remarks
EQUIPMENT AND/OR LABOR
Labor Class DESCRIPTION
Workers Name /
Equipment)
Temp: Min Max_
City of San Luis Obispo* DEPARTMENT OF PUBLIC WORKSENGINEERING INSPECTOR'S DAILY REPORT
T W T F S S Circle Day
HOURS -ITEM NO.WEATHER
Project Title:
Spec #:
Project Contractor:
Name
Insp
Signature Printed Name Title
Name
Name
Notes:
Material:
Foreman Checked
Name
Name
Name
Bryce Crespin
Labor
Labor