Loading...
HomeMy WebLinkAbout2024.10.30_ARCH-0464-2023 (2932 Augusta) Completeness Letter v2 October 30, 2024 Sent via Email Jessie Skidmore Ten Over Studio 539 Marsh St San Luis Obispo, CA 93401 Email: jessies@tenoverstudio.com Subject: Completeness Review #2 – ARCH-0464-2023 (2932 Augusta St.) Multi-Family Residential Development, ADU, and Parking Lot Dear Jessie Skidmore: Thank you for the October 1, 2024 submittal requesting a Moderate Development Review to allow for development of a 20,057-square-foot, 3-story, 28-unit multi-family residential building, a 1,055-square-foot, 1-story, 2-unit accessory dwelling unit (ADU) building, and a 17-space surface parking lot. We have reviewed your application and found it to be incomplete. We will be unable to process your application until additional information and/or revisions have been submitted to the satisfaction of the Community Development Director. Preliminary review is necessary to ensure that staff has adequate information to evaluate your project and identify any conflicts with City standards or guidelines. The purpose of this letter is to provide you with a list of items that need to be addressed prior to taking action on your project. Preliminary review indicates that your application will remain in an incomplete status until the following information and/or revisions are submitted: Note: Upon resubmittal, please provide a narrative indicating where responses to these items can be found on plans. Department comments/completeness items: Planning Division - Community Development Department 1. Building Square Footage. Based on Sheet T1.1 of the project plans dated September 25, 2024, the project includes development of a 20,057-square-foot multi-family residential building and a 976-square-foot ADU building. However, on Sheet T1.0 of the project site plans it indicates that the multi-family residential building is 19,650 square feet in size and on sheet A1.0 the proposed ADU building is shown as being 1,055 square feet in size. Please rectify these discrepancies and ensure that all building, unit, and floor square footages are accurate on all sheets of the project plan set. ARCH-0464-2023 (2932 Augusta St.) Completeness Review #2 October 30, 2024 Page 2 2. Height Limit Exception. The project includes a request for a waiver to allow for an overall building height of 37 feet above natural grade where the current zoning allows for a maximum building height of 35 feet above natural grade. However, the building elevations shown on sheets A3.0 and A3.1 show the proposed multi-family residential building not exceeding a maximum height of 35 feet above natural grade. Please rectify this discrepancy. 3. Retaining Walls Heights. Based on the project plan set (dated September 25, 2024), the project includes construction of two retaining walls, one along the east side of the property and one along the west side of the property, both of which are located within the required building setbacks. Based on sheet C2.2 of the project plan set, the maximum height of the western retaining wall is 6.5 feet and the maximum height of the eastern retaining wall is 7.2 feet. City Zoning Regulations Section 17.70.070 (F) (Fences, Walls, and Hedges) state that were fences or walls are located on retaining walls within interior or rear setbacks, fences/walls shall not exceed six feet as measured from the uphill side if placed on top of retaining walls, and the combined wall and retaining wall height shall not exceed nine feet from the lower side, provided no modification of grade has occurred from the original subdivision improvements and/or design approvals. Please provide the maximum wall heights of each proposed retaining wall as measured from the uphill side and the lower side of each wall to demonstrate compliance with these requirements and if not, please note in the project description a fence height exception request and provide reasons for the request. 4. Parking Calculations. Based on sheet T1.0 of the project plans dated September 25, 2024, and the Affordable Housing Summary, the project includes a request for an incentive to allow for a reduction in required parking spaces from 28 to 17 in order to achieve the proposed residential density on-site. However, sheet T1.0 also shows that 7 EV ready, 13 EV capable, and 2 EV charger spaces would be provided, and EV ADA spaces are calculated based on these numbers. Please rectify this discrepancy and provide an updated summary of the EV ready, EV capable, EV charger, and EV ADA spaces that the project would provide. 5. Short Term Bicycle Parking. Based on sheet T1.0 of the project plans dated September 25, 2024, short term bicycle parking is not required. Sheet A1.0 identifies “peak” style bike rack for 2 bikes, 3 racks on the western side of the multi-family residential building and does not identify any other proposed bike rack locations on the site, however, Sheet A6.0 and Sheet L1.0 indicate there would be a bike rack installed near the southeastern side of the building. City Zoning Regulations 17.72.070 require 1 guest/short term bicycle parking space per every 5 units for all residential housing types. Please update the project plan set to consistently identify the locations of proposed short-term bicycle parking and identify the total number of short-term bicycle parking spaces to be provided on-site to demonstrate consistency with this requirement. 6. Trash Enclosure. Based on the project plans dated September 25, 2024 the project includes a proposed trash enclosure to include a 4-cubic-yard (cy) trash receptacle, a 4-cy recycling receptable, and a 65-gallon bin for organic waste. However, no details are provided regarding the design of the enclosure (height, materials, colors, etc.). Please provide ARCH-0464-2023 (2932 Augusta St.) Completeness Review #2 October 30, 2024 Page 3 additional details demonstrating the proposed trash enclosure’s compliance with City Zoning Regulations Section 17.70.200 (C) and (E), which includes location and design standards for trash enclosures. 7. Transformer. Based on the project plans dated September 25, 2024, the project includes a proposed transformer near the front setback of the property. City Zoning Regulations 17.76.100 (B) requires all exterior mechanical and electrical equipment to be screened or incorporated into the design of buildings so as not to be visible from the public right-of- way or adjacent residential zones. Please provide additional details to demonstrate compliance with this standard. 8. Landscape Plan. The Landscape Plan provided on sheet L1.0 of the project plans dated September 25, 2024 include numbered labels for items 1 through 10, however the keynotes provided on this plan only define items 1 through 6. Please revise accordingly. Additional Comments – These comments are not completeness comments but are provided for further context and may directly affect the staff recommendation. 9. Pedestrian Safety/Exterior Lighting. Based on the project plan set, it appears that the entries to the first-floor units may pose some safety concerns based on the long narrow hallways with high walls, one-way access, and no exterior lighting shown. Please consider providing additional information and/or modifications to the site/building design to make that space safer for someone walking to their unit during nighttime hours. The resubmittal response provided indicated that revisions on elevations show additional lighting. Project plan sheets A3.0 and A3.1 (elevations) do not call out any specific notes regarding lighting fixtures. Sheet A1.0 (site plan) indicates that the eastern retaining wall will include downward facing, LED wall sconces at 3 feet above grade every 15 feet. No walkway lighting appears to be proposed for ground floor units with entrances on the west side of the building. If you have any questions on the above planning comments, or any questions regarding this letter, please contact me at 805-539-2867 or cassidy.bewley@swca.com. Housing – Community Development Department 10. Project plans and affordable housing summary indicate that two 1-bedroom units are to be dedicated to very low- income households. Please identify on the project plans which specific units will be dedicated. If you have questions on the above items please contact Housing Programs Coordinator, David Amini, 805-781-7524, or by e-mail: damini@slocity.org. ARCH-0464-2023 (2932 Augusta St.) Completeness Review #2 October 30, 2024 Page 4 Building Division – Community Development Department 11. NFPA 13 system is required for the R-2 building as the proposed NFPA-13R system does not work. This was a misprint by the code officials and has change back to previous code versions requiring a NFPA 13 system for a V- 3 story building. Also, a NFPA 13D system is required for the (2) ADU’s building in the back as this is considered a R- occupancy. (Table 504.4 CBC) 12. The site wall you are proposing make you an Egress court / Yard (Per CBC definition) that is less than 10’ wide which will force the occupants to walk closely to a potential window / wall that is burning (1029 CBC). The retaining wall is considered an obstruction that happens within 7’ of the finish grade. (1029.2 CBC) However, building staff thinks that there is a potential solution and recommends reach out to them directly. Informational Comment CBC Chapter 11A does not contain specific provisions for trash enclosures. However, trash enclosures are common use facilities and shall be located on an accessible route (Including all door requirements). Section 1127A.1 indicates that common use facilities “are not limited to” those listed in the code. Fair Housing Accessibility FIRST also provides the following commentary regarding trash enclosures: The garbage dumpster itself is not covered by the design and construction requirements. However, enough garbage dumpsters must be located on an accessible route. If an enclosure is built around the dumpster, the opening must have a 32-inch clear width and an accessible route must be provided to the dumpster door. If parking is provided at the dumpster, accessible parking must also be provided. If you have questions on the above items, please contact Plans Examiner, Sean McCaffrey, 805-781- 7168, or by e-mail: smccaffr@slocity.org. Utilities Department No completeness review items are noted. Please note the following codes. Compliance shall be required upon submittal of the building permit: 13. Where a multi-family project has one thousand square feet of landscaping or greater, the project shall provide a separate city-owned landscape water meter. 14. Dwellings with five or more units shall have privately owned sub-meters. 15. Separate submeters shall be installed in accordance with Division 5.3 of the California Green Building Code If you have questions on the above items, please contact Utilities Special Projects Manager, Shawna Scott, 805-781-7176, or by e-mail: sscott@slocity.org ARCH-0464-2023 (2932 Augusta St.) Completeness Review #2 October 30, 2024 Page 5 Fire Department 16. A full NFPA 13 fire sprinkler system required for type VB construction, not NFPA 13R system. 17. Underground fire line shall not go under the slab more than 10ft, underground fire line is shown going to a different part of the building than the fire riser room. 18. Show building height from actual grade at front of building. 19. Provide a minimum 26ft wide, unobstructed, ladder truck access lane to within 15-30ft of the building If you have questions on the above items, please contact Fire Inspector, Julianna Hutchinson, 805- 431-2217, or by e-mail: jhutchin@slocity.org. Urban Forestry – Community Development Department 20. Provide an arborist report to clearly determine how many trees are being removed, how many will be retained, and a tree protection plan for the duration of the project if necessary. 21. It appears that some trees will be retained, and some trees on a neighboring property could be impacted. The arborist report needs to include a reporting plan that monitors and reports on the tree protection and any tree work taking place for the duration of construction. 22. From the concept landscaping plan provided, it appears that approximately 21 trees are to be removed but only 15 are to be replanted. Of those 15, only 3 would be considered actual trees—the rest are bushes. Trees proposed for removal are required to be replanted at a minimum 1:1 rate onsite. If that rate cannot be met onsite, an offsite plan at a rate of 2:1 will be required. 23. In meeting the tree replanting requirements, species selections and locations need to be incorporated in such a way that the majority of tree locations will provide meaningful canopy. Keep in mind the requirements of fire access and the locations of utilities for example. Bushes like Coast Silk tassel, “Pixie white’ Crape myrtle, Redbud, Palo Verde and Smoke bush will not be satisfactory as a dominant theme. Trees with narrower and vertical growth habits, or lower and wider canopies (depending on constraints) should be incorporated in the design (Bottle trees, Brisbane box, Sweetshade, taller crape myrtle varieties, gold medallion tree) If you have questions on the above items, please contact City Arborist, Walter Gault, 805-781-7578, or by e-mail: wgault@slocity.org. The above list includes all of the items initially identified as necessary for us to certify your application as complete. The City may ask for additional information upon more detailed review of your project. If you have any questions regarding this letter or the specific items necessary to submit for a complete application, please contact me at (805) 539-2867. ARCH-0464-2023 (2932 Augusta St.) Completeness Review #2 October 30, 2024 Page 6 Sincerely, Cassidy Bewley | She, her, hers Project Manager / Enviornmental Planner SWCA Environmental Consultants 4111 Broad Street, Suite 210 San Luis Obispo, CA 93401 P 805.539.2867