Loading...
HomeMy WebLinkAbout11/19/2026 Item 4b, Hoppe (2) Otta, Kaitlin From:Scott Hoppe <scott@hoppe.eco> Sent:Wednesday, 18 PM To:Advisory Bodies Subject:Nov 19 ATC Meeting Public Comment: Item 4.b ACTIVE TRANSPORTATION COMMITTEE FY 2027-29 FINANCIAL PLAN RECOMMENDATIONS, Madonna crossings of the 101 Dear Active Transportation Committee Members, Thank you for the work you and staff are putting into the FY 2027-29 priorities. The report is thorough, and I support its focus on safety first. I am a parent and an avid cyclist, and I ride the Madonna corridor regularly. The Madonna Shared Use Path was the second most supported project in your own survey (Figures 3 and 4). Yet the feasibility study for the Madonna Class I Overpass sits in Priority #2. I respectfully ask that it move into Priority #1, where the safety projects are listed. Both crossings have serious problems today. On the underpass side, the bike path ends beside the off- ramp. Riders must either share the road with cars entering and leaving the freeway, or use a sidewalk too narrow for one bike, let alone a bike and a pedestrian passing in the opposite direction. On the overpass side, a good bike lane ends at Madonna Road. Protection disappears, four lanes open up, and the road widens toward an intersection where drivers regularly run red lights. I ask that the feasibility study cover both crossings and the intersection approach, not only the overpass. A study is a low-cost first step. It also gives the City the preliminary design and cost estimates it needs to compete for outside grant funding. The General Plan calls for 20% of trips to be made by bicycle. That this corridor is the only connection that the Laguna Lake side of town has to downtown and to Cal Poly. That 20% goal depends on closing gaps like this one, where a safe route ends and a dangerous one begins. Thank you for your leadership in making San Luis Obispo safer and more connected for everyone. Sincerely, Dr. Scott Hoppe, CPA Dad, avid cyclist, business owner, Cal Poly professor 1