Loading...
HomeMy WebLinkAbout06/03/1997, 2 - PRELIMINARY 1997-99 FINANCIAL PLAN council _9 j aqjEnaa REpont ��- CITY OF SAN LUIS 0 B I S P 0 FROM: John Dunn, City Administrative OfQcer Bill Statler,Director of Finance SUBJECT: PRELIMINARY 1997-99 FINANCIAL PLAN CAO RECONEMENDATION Continue review and discussion of the Preliminary 1997-99 Financial Plan. DISCUSSION The Preliminary 1997-99 Financial Plan and supporting documentation (Appendix A for significant operating program changes and Appendix B for capital improvement plan projects) were distributed to Council members and the public on May 12, 1997. As noted in the Budget Message, the budget is balanced, and reflects each of the twenty-two goals previously set by the Council in accordance with the work programs approved by the Council on April 17. To-date, the Council has held twelve workshops and hearings on the Preliminary Financial Plan summarized as follows: December 3, 1996 • Approval of approach to Council goal-setting and Preliminary - Financial Plan schedule. January 7, 1997 • Approval of goal-setting process. • Consideration of general economic outlook for 1997-99. January 14, 1997 • Consideration of candidate goals presented by community groups, interested individuals and Council advisory bodies. February 1 and 4, 1997 Consideration of information presented at the January 14 workshop. • Review of five year fiscal forecast for the General Fund. • Setting of goals for 1997-99. February 25, 1997 • Consideration of 1996-97 mid-year budget review. April 8, 15 and 17, 1997 • Review and approval of Council goal work programs. May 19, 1997 • Introduction to the Preliminary Financial Plan. • Review and discussion of General Fund operating programs. May 22, 1997 • Review and discussion of General Fund capital improvement plan (CIP)projects. May 27, 1997 • Review and discussion of enterprise fund operating programs and CIP projects(water,sewer,parking,transit and golf). • Review of enterprise fund revenue requirements and adoption of rates. The purpose of the June 3 public hearing is to continue the Council's review and discussion of Council Agenda Report— Preliminary 1997-99 Financial Plan Page 2 the Preliminary Financial Plan, and to take further comments from the public. It is also an opportunity for the staff to follow-up on any requests for further information received from the Council at the May 19, May 22 or May 27 budget sessions. This public hearing is also the last opportunity for the Council to discuss the Preliminary Financial Plan and provide direction to staff for additional information or changes before the June 17 meeting,when the adoption of the 1997-99 Financial Plan has been scheduled. G:Budget976PrelimFinPlmAgmdaRepoxtlune3 MEETING AGrf4DA DATE AL117 ITEM # City of Obispo Public Works • . NCIL 0 c DIR O FAIN DIR Memo VACAO PWDR (i�AT7C)RNEY 0 CLBWJMG0 POLICE CHF 0 MC3MTTEAM 0 REC DIR 113 CREAD FILE 0 U7!LDIR TO: City Council W'-,r,/,�- C IRE!-.,DIR Frons Mike McCluskey, Director of Public Works CC: City Administrator,City Attorney, City Clerk Dates May 29, 1997 Rex Information on CIP Project Mission Plaza Renovations(pg. 176,Appendix B) At the Council meeting of May 22nd Councilman Roalman asked for a breakdown of the referenced project between the two listed items. That breakdown is as follows: I. Replace brick walkways and the bridge surface with decorative paving material. A Brick walkways: $40,000 B., Bridge surface: $18,000 Il. Construct a retaining wall to stabilize the creek bank. Cost$27,000 The background for this project is presented in the Appendix B. A cross section of the proposed creek bank retaining wall as well as a color copy of the type of wall we are planning to install are attached. The wall is not a typical retaining wall in the Cal-Trans sense of the word. It works on the basis of interlocking concrete ties in the blocks themselves and uses the weight of the earth for stabilization. An advantage of this system is that planting can be maintained for esthetic purposes as well as erosion protection during high water storms. These systems have been . successfully implemented through out the US and Europe(where they were invented)and one system exists locally in Arroyo Grande. The wall would average about 1 meter in height but will be higher at the point of the worst erosion just behind the Murray Adobe. Exact designs have not occurred yet because this is still just a proposed project I:mkesf97-99 budgettmission plaza memo 5-29.97 •Page 1 e MURRAY ADOBE PROPOSED BANK PROPOSED RET. WALL (E) BANK WITH NEW VEGETATION 1m (E) BRICK WALK SAN LUIS CREEK (E) RET. WALL O y� ire �._ i•^; `. �. _ ;������ •� • ��.. Rte, �' '"�.;, ml- v .R 4 1 lk Arzi � r S i " wwr - - •. M "6ETING AGENDA bFWE " " ITEM # & COUNCIL MEMORANDUM May 30, 1997 k� COUP 1CIL CDD DIR k`;f 'PAO SIN DIR TO: City Council VACAO ❑�FIRE CHIEF s tTTORNEY LTJ FEW DIR VIA: John Dunn,City Administrative Off er p CLERKPOFiIG ❑ P LICE CHEF ❑ MGW TEAM WrREC DIR FROM: Bill Statler,Director of Finance W" ❑ C READ RLE O UT'L DIR SUBJECT: BUDGET FOLLOW-UP Based on the budget hearings we have held to-date and the direction we have received from the Council, the following is a summary of follow-up actions underway. We plan to review with these with the Council at the June 3 budget public hearing: Operating Programs ■ Commercial zoning workshop. The final Financial Plan document will state that the Council will review the results of the workshop before any changes are initiated. ■ Neighborhood services. We are continuing to work on an improved work program for this major City goal, and we hope to have a draft revision to the Council by Monday,June 2. Capital Improvement Plan ■ Downtown pedestrian improvements Attached for the Council's review is a revised CIP request for this project. which focuses more on downtown improvements in general than on the three referenced improvement projects(Garden,Morro and Broad streets). ■ Youth athletic fields. Attached for the Council's review is a revised CIP project request that focuses on the need for youth athletic fields in general. ■ Mission plaza improvements Attached for the Council's review is a memorandum from the Public Works Director responding to the Council's request for more information on this project. ■ Corporation yard warehouse. The final Financial Plan document will move this project up by one year from 2000-01 to 1999-01. As noted above, we will review these changes with the Council on June 3. In the interim, if you have any questions regarding these follow-up actions,please do not hesitate to contact us. ATTACHMENTS ■ Revised CIP request for downtown pedestrian improvements ■ Revised CIP request for youth athletic fields ■ Supplemental information on Mission Plaza improvements G:Budget97.Fo11owupMe=June3 � a 1997-99 Financial Plan Rtyuest CAPITAL IMPROVEMENT PLAN OPERATION: Circulation PROJECT TITLE: Downtown Improvements Description The Conceptual Physical Plan for the City's Center makes a number of recommendations that enhance and improve pedestrian circulation. Three potential projects are listed below,which when implemented would enhance pedestrian uses, and the overall appearance and ambiance of the City's downtown area. Other downtown improvement projects are also possible. It is anticipated that in the year recommended, a series of public input meetings would be held to help guide Council in actually selecting one or multiple projects for implementation. Garden Street Pedestrian Improvements • Redesign Garden Street between Higuera and Marsh Streets to accommodate one-way auto traffic • Construct Mission Plaza-style bulb-outs and textured crosswalks at the intersection of Garden and Higuera Streets • Install diagonal parking on Garden Street • Install bike racks,seating, landscape planters,and locations for public art Morro Street Pedestrian Improvements • Morro Street between Monterey and Higuera would be enhanced for pedestrian usage but auto traffic would still be allowed • Create a pedestrian plaza feeling by installing Mission Plaza-style paving, seating areas, and landscaping • Plant street trees Broad Street Closing at Mission Plaza • Close Broad Street between Palm and Monterey Streets with limited vehicular access • Expand Mission Plaza by installing additional Mission Plaza-style paving, seating areas, and landscaping Plant additional trees Objectives • Beautify the downtown streetscape • Improve pedestrian amenities and safety • Provide space for informal and scheduled public functions Background The Conceptual Physical Plan for the City's Center has many features which,when taken together,actio enhance the viability and sense of place of the City's downtown core. Of the many possible projects, three have been identified as likely candidate projects and are described below. However, many projects are possible and much public input will be necessary before a final selection is made by the City Council. Garden Street Pedestrian Improvements. Garden Street has become a vital and active part of the downtown. Making this area more attractive for pedestrians would help preserve and enhance that vitality. • Morro Street Pedestrian Impro.-.rents. This section of Morro Street is a si...,t block with relatively low vehicle and pedestrian traffic volumes. Recent building facelifts and planter installations have helped beautify the street, but there are no street trees,benches,or other pedestrian amenities. Broad Street Closing at Mission Plaza. This section of Broad Street is a local commercial street which primarily serves Mission Plaza cultural facilities (the Mission, the SLO County Historical Society Museum, and the Art Center) and the commercial development via the Warden Bridge across San Luis Obispo Creek. During Mission Plaza events, Broad Street is closed and traffic is detoured onto Nipomo Street with no difficulty or additional traffic congestion. Both the Circulation Element and the downtown concept plan recommend closing this stretch of Broad Street to all traffic except deliveries. Policy Links • Downtown Improvement Manual • Goals for Downtown-Council goal for 1995-97 • 1994 General Plan Circulation Element • Conceptual Physical Plan for the City's Center Work Completed None Costs To Date 1997-98 1998-99 1999-00 2000-01 Totals Construction 700,000 700,000 Totals 700,000 700 000 Funding Source: General Fund Public Art Public art would be an integral part of these projects. Effect on the Operating Budget During construction Engineering Engineering Staff Hours: Staff Hours: Project Project Design Project Inspection Garden Street Pedestrian Improvements 130 40 Morro Street Pedestrian Improvements 130 40 Broad Street Closing at Mission Plaza 1 6701 190 After construction Landscaped areas included in these projects would require an undetermined amount for additional contract maintenance. G:Budgei97/Pedlmpro 1997-99 Financial Plan CAPITAL IMPROVEMENT PLAN OPERATION: Parks&Recreation REQUEST TITLE: Youth Athletic Fields Project Description Construct additional youth athletic fields. Project Objectives Provide additional athletic fields,primarily for youth programs,in the most cost-effective method possible. Existing Situation The City currently has a shortage of athletic fields,primarily for youth activities. This shortage is identified in the Parks and Recreation Element as the City's highest priority recreation facility unmet need, and generally accepted by the public as an important concern. The Parks &Recreation Element identifies the need for six additional fields at this time based on current use and indicated need. To remedy this situation, this project funds $3.0 million for athletic field construction. This funding could be used in a variety of ways such as participating with other agencies in developing a sports complex, developing fields on currently-owned City property, or acquiring new site(s)and developing them for this purpose. Policy Links ■ Parks&recreation element of the General Plan ■ 1997-99 major City goals ■ Financial Plan capital financing and debt management policy Project Phasing,Costs and Funding Sources Funding Sources To-Date 1997-98 1998-99 1999-00 2000-01 Total General Fund Debt Financing 3,000,000 3,000,000 Total 390009000 3,0005000 Implementation A proposal to jointly develop a sports complex was presented by Cal Poly to the Council in September of 1996. In response to this proposal, a comprehensive analysis of field development alternatives was presented to the Council in January of 1997. Based on Council direction as part of the 1997-99 goal-setting process, negotiations with Cal Poly on use, noise modeling and testing,meetings with residents to address neighborhood concerns, and analysis by a group of Cal Poly faculty, staff and City representatives to address environmental concerns, are currently underway. Based on the status of these efforts,it is unlikely that the feasibility of this approach in achieving City gdals will be known until late July. If this joint project is determined to be the best approach at that time, this project will move forward, and will be under construction by Fall of 1997. If we are not successful in addressing all of our concerns with this joint project, and the Council does not authorize moving forward with it, then additional time will be needed to revisit other potential options. In this case, an implementation approach and schedule will be developed at that time. Youth Athletic Fields(Continuer Public Art Policy If the project is constructed on City property, 1%of the costs will be made available for public art. Alternatives ■ Do not proceed with this project Under this scenario, the need for additional fields will not be addressed during 1997-99. ■ Defer consideration of this project While resources would not be allocated for this project as part of the 1997-99 Financial Plan, resources would be available to fund this project at some other point over the next two years,assuming that the resources now available are not allocated for some other purpose. ■ Do not debt finance the project and allocate a set amount($300,000) annually for field construction. Under this scenario, it would be two years until at least one additional field could be constructed; as noted above, there is a need for six fields. Under this approach, it would take at least 12 years to address our unmet needs. Because of the estimated useful life of this project, and the existing unmet need, debt financing is an appropriate way to fund this project. Project Effect on the Operating Budget ■ Debt service payments of approximately $300,000 annually will be incurred to pay for the financing based on a 15 year term. ■ Any field project constructed upon City property will require the City to assume maintenance responsibilities. Maintenance costs, based upon current expenditure levels, will be in the $7,000 per acre range. City sites will also require supervision by Parks and Recreation staff during operating hours. G:Budget 97.Ythflds City of Obispo Public • Department Memo - • - emo Ta. City Council From: Mike McCluskey, Director of Public Works CC: City Administrator, City Attorney,City Clerk nate: May 30, 1997 Re: Information on CIP Project:Mission Plaza Renovations(pg. 176,Appendix B) At the Council meeting of May &d Councilman Roalman asked for a breakdown of the referenced project between the two listed items. That breakdown is as follows: I. Replace brick walkways and the bridge surface with decorative Davina material. A. Brick walkways: $40,000 B. Bridge surface: $18,000 II. Construct a retaining wall to stabilize the creek bank. Cost:$27,000 The background for this project is presented in the Appendix B. A cross section of the proposed creek bank retaining wall as well as a color copy of the type of wall we are planning to install are attached. The wall is not a typical retaining wall in the Cal-Trans sense of the wont. It works on the basis of interlocking concrete ties in the blocks themselves and uses the weight of the earth for stabilization. An advantage of this system is that planting can be maintained for esthetic purposes as well as erosion protection during high water storms. These systems have been successfully implemented through out the US and Europe(where they were invented) and one system exists locally in Arroyo Grande. The wall would average about 1 meter in height but will be higher at the point of the worst erosion just behind the Murray Adobe. Exact designs have not occurred yet because this is still just a proposed project I:mIms/97-99 budget/mission plaza memo 529-97 0 Page 1 MURRAY ADOBE PROPOSED BANK PROPOSED RET. WALL (E) BANK WITH . NEW VEGETATION lm (E) BRICK WALK SAN LUIS CREEK (E) RET. WALL D ---------------- r+ 6 Zt�- t`_ ����i;:ltv1\tti\a ` ��: �4_4� 5' lj�i' T `r r7' '_•V^9si1 '. art+K!#�i �^R� 4`ra.; ,-', Y ss %t • � S�. +,'�''j �' t}''Y 3. >, �� ♦'v Ws,�l r i ,�i,� 4 i LPPtq,., r•"7ct l.�l'�'' �S _ - '- f A��4. _, '°" `�r.''�! 3 R'SIKv �t•tr� < d,m"`� v♦ t a a"'nJ� '�' .s. ht\vl'a. L S 4. �' •t'7' ti 4+. •"XyR ' �. �fj�,�k '`�'�, i. 4.t".. a LR•3Ft �" ,�*�„r4'+y; rc• �-7;, � ;t -���i ��y�l s'. �.. I'a�J_,A`�:y'' `Iu. �'�- - �. - iaa'C �fl.,�la.,c$��.".�tw;�=�� \ �f � - My � G a/�S1i\fit.Z,,,V ,�\•'iryv� �a�x� 6 may,•).1�:}'� y �1'���y :,r 1 t�1�t�ylt,,�ikp '36Ifj• ��,���,T.-may! •vim a - -a.. t L.r-t`Ytl \ Ll\ '�1 �>•-. y 1 ch �,x rl �L� H�',L 1 k,. . +r, i � ,f'tF�. t `tt ���•'ht,:A- `"` 1\ ♦ t.4 t'Itr.,KJ�i• �1�wi�4I.W_ -.♦1 �, V.w<!S� � �.y �Ifa"`i '�""d`-tr r' nlr:.q i5.. 4s /r•{� ati a +r� :�'S r fS,Fi' -. °) '(•y �G•� a..:.YA �y {!��\ MJ O ✓/hw `.Sn J. I Y,_• ,�,r4�}�; ?\'-]I Yy ... �`1 T`l.-.!< �-(-.y' y' �• S.. �k F r n .z .•f. K'a y'1 , `a �. t M `�l gita•♦/1 R­_ .c1A -.:� 1-. i •t- +� 1 '• >r A �M t�q\'a-a't�i 4 h`!.. �� Pp'�'F a FkCr)/y� n- 51 —4E-. ti L r >i �..•-r _ t `_1�� P�yt 4ct 1 !.i" rw �tJ ���' ;vl+l -.:: \ �•Aa, ;{x•� J` •:. � i����� ��t �i F x� ��tr^'}�S `�i�.�• `, � S � T�� � tw > -AtJ•»'�.1�1 ,:,�~�Z 41.��. ,�'� �'I � c�yF a • .. 1� V•aC Amt+S.'.Y� S J M '1 y x x �l _ � �'YS<•rt'`r}•"i�r,t'.s� ti3.a �� _ � .� T` �♦S��� � y' xr�\•ra��>='��'F'f -/� a'�If �^ �t fir,-J k�T. �� " �� ..dL'1^r,,..".♦�11a!^�.��J,.Li151'uti.�iµ- � i -f•11�RI •'li. 3 4�- � � IT1hY l to ✓7 " , �t•� r. ,�, � .���}.F .nes q�.*ti -_ t t. eN xj f,n )a,*Yy�re 3YI �1 L+1 r1+• ° .- c f. 19.1 ` ...��F'4,dt` '� M1 I" 'ay�.+.+ r,:,sr�'Ff� a'�.Y- .•t-°Pl +'S.t� � a t i". r �Yt.�- a` V�t..ri tri 'Y��ttf-^--'++- E"'4 �t'E ~1 ���j.i�+7j^°�1�1•c�..�°. +r ,.iii �-�1ti.`.2•., :f+.- _ '�}i J .. _ � f •rTir - a *� - r ' tea i.,tf 1f �r-g 's�� •a"-y Y •f:-��+ -1�� ' -� � C iT� :1 _u.TMZS'e'1-:`t`.sa."�u���f- ♦-T'L. ; __ t 1 •I OEETINGAGENDA DATE ;r .AGENDA # ? tTCOti;i ii 6lG D DIP �. � '4a IN DIR ,MEMORANDUM ICAO O111N D EF � YTTORNEY DIR TO: Mayor and City Council L CLERK/ORIG 0 ROUGE CHF VIA: John Dunn,City Administrative Officer t) O MGMT TEAM DA FROM: Arnold Jonas,Community Development Director D C R9AD Fr.E U DSR BY: Rob Bryn,Neighborhood Services Manager DATE: June 3, 1997 ..••-: � _. .. SUBJECT: Major City Goal:Neighborhood Preservation At your May 19, 1997 workshop to discuss the draft 1997-99 budget, Council requested additional ideas for further enhancement of the Neighborhood Services Program. Material included in the draft budget respected the current Council approved work program for this budget item, and included a modest budget increase. Council expressed an interest in further discussion of program expansion beyond that initially proposed. Responding to that request, staff is proposing to 1) increase the budget for the existing Working to Improve Neighborhoods (WIN) education/prevention program for the next two years from the initial $20,000 request, to$50,000;and 2)during the next annual budget review, report to Council on the progress and success of the expanded program,and recommend appropriate and needed additional enhancement activities. The Neighborhood Services Program The Office of Neighborhood Services continues to provide a high level of service, effectively processing over 600 complaints during calendar year 1996. The complaints include violation of zoning, sign, unsafe housing, and Neighborhood Enhancement Ordinances. The Police Department designated one of their volunteer positions as the "Neighborhood Services Volunteer" who responds to complaints relating to abandoned vehicles and issues the 72 hour notices to correct Enhancement Ordinance violations. Complaint processing, ordinance enforcement and preparation of cases for court take up approximately 80% of the staffs time. The remaining time is associated with meetings, committee assignments and public speaking. Currently the office consists of the Neighborhood Services Manager and a part time Secretary 11. However, we constantly coordinate with, and utilize the services of other Departments and agencies, as set forth below. Working to Improve Neighborhoods Program. WIN is the overall blanket signature name for both internal and external programs that the Office of Neighborhood Services recognizes as beneficial to the community. These programs may be developed by the office itself or individuals, groups or government agencies who are responding to the needs of neighborhoods.The previous budget for the WIN program included the production of two thirty second television commercials which were aired during 1996/97. The spots were part of an education/prevention strategy aimed at transient occupancy groups that were funded by Cal Poly, Cuesta, Residents for Quality Neighborhoods(RQN)and the City. Examples of other programs/activities within City departments currently include: ■ Police Neighborhood Services Volunteer position including car, radio and related field support. Field Service Technician response to abandoned vehicles and code issues. Noise Ordinance First Response Notification (FRN) program in cooperation with RQN. Second Response Ordinance billing and property owner contact .. Student Neighborhood Assistance Program(SNAP)reduction of noise complaints. ® Fire Community Emergency Response Training(CERT)provides training to allow citizens to be self sufficient during the period following a major disaster. Weed Abatement and Nuisance Control clears weeds and hazardous debris from sites. ® Utilities Water Conservation provides information on landscaping and yard maintenance, including cooperative advertising with Neighborhood Services. Major City Goal: Neighborhood Preservation Page 2 Solid Waste controls refuse removal and recycling programs,newsletters&mailings. ■ Public Works Forming the Neighborhood Traffic Management Guideline Committee to develop standards,policy and protocols for handling neighborhood tiaffic concerns Parking Division assists in creating and enforcement of parking districts. Streets Division provides rapid removal of blight producing objects from public right of ways. ■ Parks and Recreation Human Relations Commission (FDIC) will begin Neighborhood Action Teams as part of their neighborhood communications plan. Community Relations Team to improve external communication of all city departments. Park Watch and related information dissemination programs,policies and events. ■ City Attorney Assistant City Attorney dedicated to follow-up and prosecution of neighborhood related issues as vital part of the Neighborhood Task Force Concept. The Task Force utilizes various agencies to coordinate clearing of code violations at a particular site and facilitates prosecution when required. This reduces the need for multiple letters, government contacts and centralizes resources. ■ Community Development Building& Safety Division, which includes the Office of Neighborhood Services, provides direct staff support with Building Inspectors for code enforcement activities. Programs currently operational are; Neighborhood Cooperation Week, Good Neighbor Day, Paint Your Heart Out,WOW Week& SLO Days presentations and related publications.Planning Division provides a Neighborhood Liaison planner, early project notification mailing services and direct contact notification on upcoming land use issues and applications that could affect neighborhoods, workshop support during development review, public hearings, web page designed to assist individuals in locating information on resources, services upcoming meeting agendas,and action summaries from advisory body hearings,etc. Enhanced WIN Program. The proposal outlined below takes the Office of Neighborhood Services external communications program into a new and positive direction. The reason we want to emphasize prevention and education is to build both an awareness of the importance the city places on neighborhoods by having a highly visible, coordinated program and attempt to maintain a workable average daily case load for the office. The enhanced program would require the services of a professional advertising and public relations firm that would provide the following production services: ■Television Four 30 second commercials relating to neighborhood issues to be rotated for 2 years. In order to save on production cost all would be filmed in 1997/8 budget Cost to produce: $4,000 ■Graphics Twenty different print ads,including concept/copy/graphic design Cost to produce: $2,800 ■Photos Twenty photographs for print ads and two new slide shows Cost to produce: $2,000 ■Paper Four issues of a "Neighborhood Newspaper" to be issued twice a year to address current issues.Paper would be distnbuted at Cucsta, Cal Poly and locally. Cost to produce: $8,000 ■Slides Produce two new slide shows to replace existing sets. Cost to produce: $2,300 i 7 Major City Goal: Neighborhood Preservation Page 3 ■Internet Produce Neighborhood Services"fixed"WEB page with copy&design. Cost to produce: $900 Total Production Costs (Including Tax) $21,500 Total TV Costs(Broadcast&Cable) 1997/8$7,400 1998/9$7,400 Total $14,800 Total Printing Costs(All Programs) 1997/8$6,800 1998/9$6,900 Total $13,700 Proposed Draft Current Two Year Budget Proposed Enhanced Two Year Budget 1997/8$10,000 1997/8$35,700 1998/9$109000 1998/9$14,300 Total $20,000 Total $50,000 Total net increase to original request: $30,000 All production costs would be covered in the 1997/8 budget year. The ads produced for print purposes could actually have a much longer life then a traditional two year budget cycle, however it is anticipated that the television production portion would return each cycle. Staff believes that the neighborhood newspaper finally allows us access to those transient occupancy groups that are only partially covered by our current presentations ie; Cuesta College students. The student newspaper at Cuesta does not accept advertising like the Mustang Daily,therefore the only real contact staff currently has with this population group are during SLO Days(new student orientation)and a parents program that speaks to incoming athletes. Additional Activities A significant number and diversity of neighborhood oriented activities and services are currently provided by City departments. The Office of Neighborhood Services is in regular contact with various community and resident groups, most notably RQN. The program proposed above results in part from those interactions ,and reflects what staff considers feasible under existing approved work program and budget constraints. If Council wishes to redirect or further expand efforts beyond the enhanced WIN program proposed above, it . will be best accomplished with adequate forethought and planning outside the current budget process and the limited time remaining before budget adoption must occur. For example, the HRC Neighborhood Action Teams and Public Works Department Neighborhood Traffic Management Guidelines Committee both show promise for increased neighborhood participation in specific program areas. It might also be desirable to conduct a professional, organized survey of the community covering a variety of issue areas in addition to enhanced neighborhood services to accurately understand citizen interests and support levels. Such a survey is estimated to cost approximately $30,000. Additional coordination of neighborhood capital improvement projects is also possible. Given any revisions to the program ultimately agreed upon, it may be necessary to r . Major City Goal: Neighborhood Preservation Page 4 provide staff resources beyond those presently available. Therefore, staff suggests that the enhanced WIN program be included in the adopted 1997-99 budget, with consideration of the need for additional changes scheduled for inclusion of the next annual budget review. SUGGESTED ADDITION TO CITY'S NEIGHBORHOOD SERVICES PROGRAM The City Administrative Officer has volunteered this addition to the City's existing Neighborhood Services Program. This is based on a succe&,Sid program in Monterey and other cities. Once every two months,the CAO— with the Neighborhood Services Manager(NSM),the Parks and Recreation Director,the Public Works Director,the Community Development Director and the Police Chief (and,as needed,other appropriate staf)— will meet with a group of assembled neighbors from a designated neighborhood,which group has been put together by the NSM,and will walk the neighborhood and discuss issues,noted problems and perceptions. The primary task of the staff will be to observe and listen.After the tour,the NSM will write up the noteworthy observations,and requested follow-up actions,and the staff will meet as necessary to agree on appropriate follow-up. Within two weeks of this walk, a letter will be sent to the neighborhood representative(s)setting forth what will be done to follow-through and to improve conditions in the neighborhood In this way,we will meet face-to face,we will listen to the neighbors,observe things that are important to them and,as completely as we can within existing City policies/programs/resources,work with the neighbors to improve neighborhood conditions. Any noteworthy observations or proposed changes in present City programs would,of course,be brought to the attention of the Council. The basic idea of this proposed refinement of the Neighborhood Services Program is to"elevate"this program to the same higher-level priority and visibility now accorded the Natural Resources and Economic Development Programs of the City,to truly create the three-legged stool talked about in earlier City documents. This"in the field" meeting between neighbors and staff might be perceived as being similar to the Human Relations Commission's concerns with the"social health"of the community. However,both initiatives are important in pushing our neighborhood services program to a higher level. While our initial assessment is that the two activities are complimentary,if,in practice,overlaps and duplication are experienced,then one or both programs could be modified,or even combined. Through the Parks and Recreation Director,the staff person common to both processes,we will monitor the situation and,as necessary,make appropriate adjustments. It is recognized that this program is new and experimental,and that the outcome can't be precisely predicted. The demands on staff or City resources may,as a result of this program,be greater than the present program. We will periodically report to the Council on the progress of the Neighborhood Services Program. .MEETING AGENDA DATES ITEM # May 30, 1997 TO: City Council VIA: John Dunn, City Administrative O er FROM: Arnold Jonas, Community Development Director b SUBJECT: Planning Commission Meeting Update Attached for your information is a summary of the action taken at the Planning Commission meeting of May 28, 1997. AJ/mk I�COL''-UL CDD DIR CAO GrTIN DIR e V4CA0 ❑ FIRE CHIEF TTORNEY WPWDIR CLERIWRIG ❑ POLICE CHF ❑ MGMTTEAM ❑ Rr_C DIR R F;LE 0 U71 DIR r MEETING UPDATE AGENDA SAN LUIS OBISPO PLANNING COMMISSION Regular Meeting Council Chamber- City Hall 990 Palm Street, San Luis Obispo May 28, 1997 Wednesday 7:00 p.m. CALL TO ORDER/PLEDGE OF ALLEGIANCE ROLL CALL: Commissioners David Jeffrey, Barry Karleskint, Janet Kourakis, Paul Ready, Charles Senn, Mary Whittlesey, and John Ewan. All Commissioners were present. ACCEPTANCE OF AGENDA: No changes were made to the agenda. PUBLIC COMMENT: No member of the public addressed items not on the agenda. PUBLIC HEARINGS: 1. General Plan Conformity Report for the City's 1997 - 2001 Capital Improvement Program: Recommendation to City Council on Capital Improvement Program. (CIP) conformity with the General Plan. The Commission reviewed the draft table indicating conformity status which had been prepared by staff, made some changes, and determined that the CIP as recently modified by Council conforms with the General Plan, with notes explaining that some projects are subject to further conformity review when they are individually considered. Most items were found to conform on unanimous votes. Some items prompted extensive discussion, and three had split votes (Marsh Street parking garage, multimodal transit center, and youth athletic fields). Two commissioners t Planning Commission Meeting March 27, 1997 Page 2 stepped down on two separate items due to potential conflicts of interest. There were no public comments. COMMENT AND DISCUSSION: 2. Staff Agenda Forecast Staff provided the Commission a brief review of upcoming agendas. 3. Commission Commissioners discussed the upcoming retreat. Adjourned at 9:40 p.m. to a regular Planning Commission meeting scheduled for Wednesday, June 11, 1997, at 6:00 p.m. in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo, CA. GM:MEETING UPDATE PC 5-28-97 mtt�in - AGENDA 'TE '9 ITEM #_ & COUNCIL MEMORANDUM . June 3, 1997 TO: City Council FROM: John Dunn, City Administrative Of r SUBJECT: SUPPLEMENTAL BUDGET MATERIAL In preparation for this evening's budget hearing, the following supplemental materials are attached: ■ Proposed presentation approach ■ Supplemental information on the: • Neighborhood services program • Funding update on the homeless shelter • Water supply mitigation project • Police patrol vehicle replacement in 2000-01 In addition to these written materials, we will brief the Council on these items at the meeting. G:Budget97/Fo11owupMemo2iune3 C D DiR 110OCrAONOT-IN DIR p}(CAO a F)PIECHIEF � od[ER NEG PW DIR !(lORIG 0 O POLICE CHF ❑ MGMTTEAMJ C DIR --- ❑ C E Ft:� �UT'.L DIR Oe . r,l _�.. � RECEIVED JUN 0 3 1997 SLO CITY COUNCIL June 3 Budget Hearing PROPOSED PRESENTATION APPROACH PURPOSE John 2 min Follow-up on previous Council requests for information and direction • Take further public input • Provide additional direction as needed in preparation for budget adoption on June 17 PREVIOUS COUNCIL REQUESTS FOR INFORMATION AND DIRECTION Bill 5 min Briefly review budget follow-up items from May 30 memo Operating programs • Commercial zoning • Neighborhood services CIP projects • Downtown pedestrian improvements • Youth athletic fields • Mission plaza improvements • Corporation yard warehouse Other issues since then (see attached) • Homeless shelter and services center funding • Water supply mitigation project • Police patrol vehicle replacement in 2000-01 Briefings on the following;prepared to answer questions on the others • Neighborhood services Arnold 10 min • Homeless shelter and services center funding Jim 10 min • Water supply mitigation project John 5 min PUBLIC COMMENTS Any further public comments COUNCIL DISCUSSION AND DIRECTION FOR JUNE 17 Any further requests for information or direction to staff in preparing for budget adoption on June 17 MEMORANDUM June 3, 1997 TO: City Council FROM: John SUBJECT: 1997-99 Budget: Further Neighborhood Preservation Information The Council has received a memorandum from the Community Development Director outlining proposed enhancements to the Neighborhood Services Program. I would like to augment this memorandum by outlining an added alternative for Council consideration: The Community Development Director's memorandum recommends the appropriation of an additional $30,000 toward enhanced advertising and promotion. Rather than approving tonight this level of funding for the specific purpose of advertising, the Council could approve a more generic $30,000 enhancement to the Neighborhood Services Program with direction to staff to return with more specific recommendations for its use. In this regard, I believe there are three main areas that could benefit from enhanced resources. The first area could be to enhance resources to support the "Neighborhood Walk/Follow-Up"program outlined in the memorandum; the second would be to support a community/neighborhood survey which could generate baseline information to assist in targeting future staff and financial resources; and thirdly, added community awareness promotion at some appropriate level. In terms of the survey,my former Assistant and I, in Monterey, conducted a community survey which provided invaluable information to the Council and staff for future decision-malting. With the recognition that all of our citizens live in one neighborhood or another and that most of our services are delivered throughout the community, it is suggested it be a community-wide survey,which provides sufficient emphasis on neighborhood issues and concerns. It's our present thought that the collective staff could put together suggested questions,but that an expert, experienced person be retained to put together the final survey instrument and to establish the best methodology for the highest reliability and validity. MEMORANDUM June 3, 1997 TO: John Dunn, City Administrative Officer FROM: Jim Gardiner, Police.Chief SUBJECT: FUNDING FOR THE HOMELESS SHELTER AND SERVICES CENTER OPERATIONS RECOMMENDATION Refer homeless shelter and services center funding issues to the staff for further review. DISCUSSION Homeless Shelter As discussed more fully discussed in the attached letter from the EOC, there will be a shortfall next year in funding from the State for operating the homeless shelter in the amount $76,500. Making-up this funding is essential if this facility is to operate fully for all of 1997-98. Consistent with past practice, the EOC is requesting that the City and County share equally in this shortfall ($38,250 each). Since it is likely that the EOC will be successful in securing full funding in 1998-99, this funding should be"one-time" in bridging the shortfall for 1997-98. Homeless Services Center The homeless services center is experiencing the same bureaucratic problems between the state and federal government as the homeless services center. While we have not received a formal update for this project, it is our understanding that this shortfall will be about $47,000 for 1997- 98. Since City CDBG funds allocated in 1996-97 for operating the homeless services center in the amount of$40,000 have not been spent, it is possible to carryover this funding into 1997-98. It will require Council approval to do this. Regardless of funding source, it will not be possible to fully operate this facility in 1997-98 unless this funding shortfall is addressed. Again, assuming that the funding wrinkles between the state and federal government for emergency shelter are ironed-out, this should be a"one-time"funding problem. ATTACHMENT Letter from EOC regarding the funding status of homeless shelter JUN-03-97 TUE 14:28 EOC FAX NO. 8017' '18388 P. 02 June 3, 1997 TO: San Luis Obispo City Council FROM: EOC Homeless Services RE: Emergency Funding for Homeless Shelter BACKGROUND. In a conference call yesterday evening, top Ievel management of the California Department of Housing and Community Development (HCD) announced that they will not reverse their decision that San Luis Obis o county is Federineli ible to a 1 for al Emer en Shelter Pro am FESG com etitive funding for fiscal year 97-97Q0. This final decision ends a five month local effort to reverse the HCD ruling which greatly impacts our County's ability to assist the homeless. The ruling was the result of a bureaucratic problem between HCD in Sacramento and the Department of Housing and Urban Development in Washington, D.C. It has nothing to do with the needs of our homeless population or the quality or effectiveness of services being delivered to County homeless. Based on EOC's track record, the Homeless Shelter would have received $122,000 of the competitive FESG funding. A non-competitive stream of FESG funding is still available to the County. Of this second stream, the Homeless Shelter should receive $45,500,which creates a net loss of$76 OU. FESG funding covers critical Shelter costs including rent, maintenance, utilities, food, laundry, and key personnel. Even EOC's homeless programs which are not supported by FESG funding will be affected if these core Shelter services are cut back because of lost funding. This funding shortfall occurs just as the iml2act of welfare reform is increasing the demand for Shelter beds. In the first quarter of 1997, our Shelter experienced a 36%fl overall increase in the number of new clients and a 70% increase in the number of new women and children. EOC's Emergency Homeless Shelter provides 22,265 shelter nights a year to more than 1000 unduplicated people. There is no other mer en shelter of this kind in our County. Without our services, homeless people are on the streets with little hope of turning their lives around. We have been assured by HCD directors that this funding problem will not re-occur in fiscal year 98-99 but for ' cal ear 97-98 our funding situation` perate. ACTION: We res ectfull n- uest that the San Luis Obis o Cit Council Provide 50 in one-time emer en fundinto hel maintain essential shelter services. San Luis Obispo County will also be asked to provide $3$,250 to 'bridge" this funding shortfall. JUN. 03 ' 97 (TUE) 15:29 COMMUNICATION No :56 PACE. 2 MEMORANDUM June 3, 1997 TO: John Dunn, City Administrative Officer FROM: John Moss,Utilities Director SUBJECT: WATER SUPPLY MITIGATION PROJECT Attached is a CIP request for the Water Supply Mitigation Project. While funding for this purpose was included in the water fund rate analysis presented to the Council on May 27, the project itself was inadvertently omitted from the Preliminary 1997-99 Financial Plan. Because this project was included in the rate analysis, there is no fiscal impact in making this correction. ATTACHMENT CIP request for the water reuse mitigation project 1997-99 Financial Plan CAPITAL IMPROVEMENT PLAN PROGRAM: Water Fund REQUEST TITLE: Water Supply Mitigation Project Description Purchase of property required for and/or associated with mitigation of our major water supply projects. Purchased property would be used and managed by the City's Natural Resources Management program for specified mitigation projects required as mitigation for the City's water supply projects. This request is for the Water Fund's estimated share of the proposed land acquisitions. Project Objectives ■ Mitigate environmental impacts associated with the City's water supply development projects. ■ Enhance the city's open space program. Existing Situation The City has recently certified the EIR for the Water Reuse project and is near release of additional EIRs for the Salinas Reservoir Expansion and the Nacimiento Pipeline Project. All three of these projects will require some level of environmental mitigation. The Water Reuse project has need to establish 12,250 square feet of pond turtle habitat adjacent to San Luis Obispo Creek downstream of the Water Reclamation Facility(WRF). The City's Natural Resource Manager has been investigating opportunities for purchase of properties suitable for this mitigation which would also enhance the City's open space program and provide additional environmental benefits. The Salinas Reservoir Expansion Project and the Nacimiento Pipeline Project will both require extensive mitigation of upland habitats and possible oak tree mitigation. The property under consideration downstream of the WRF for Pond Turtle habitat has significant other environmental enhancement opportunities, such as wetlands development, and a very valuable upland habitat. This property may be at least partially funded through grant funding. For possible partial mitigation of the Salinas or Nacimiento projects,the City's Natural Resource Manager has identified a portion of Southern Pacific Railroad property currently for sale which would be suitable for these purposes. The purchase of the SP property is being considered in conjunction with the US Forest Service and Camp San Luis Obispo. Additionally, it is anticipated that grant funding may be available to fund a portion of this purchase. Purchase of these or equivalent properties is necessary for the City to develop the necessary mitigations for its water supply development projects. Additionally, through coordination with the City's Natural Resource Manager we will be able to not only provide for project mitigation, but enhance the City's open space program and to some degree begin development of a mitigation bank for use with future projects. This purchase of land will represent only a portion of the total mitigation required for our water supply projects. Goal and Policy Links ■ 1997-99 number 1 major City goal for Long Term Water Supply Development and Completion of Phase 1 of the Water Reuse project.. ■ Water Reuse Final EIR and Mitigation Program,Certified by Council March 25, 1997. ■ Other Important City Goal for Open Space Funding program. Water Supply Mitigation (Continued) Project Work Completed As stated earlier, the Final EIR for the Water Reuse project and required mitigation program has been completed and certified by Council. This EIR identified the need to acquire property suitable for mitigation of impacts to the Southwestern Pond Turtle. Preliminary investigation and discussion with current property owners of suitable property downstream of the WRF have been completed to establish possible interest in cooperating with the City. Significant effort has been completed in negotiating with the US Forest Service and Camp San Luis Obispo for the partnered purchase of the SP Railroad property. Application for grant funding for a portion of the SP property purchase has also been submitted to the appropriate grant agency for partial funding of the purchase. Environmental Review Purchase of these properties for environmental protection and enhancement is categorically exempt from further environmental study. Project Phasing,Costs and Funding Sources Project Costs -98 1998-99 1 ota Land acquisition 350,000 350,OUO Total , 350,UUU Project Phasing,Costs and Funding Sources Funding Sources 1997-98 1998-99 J ota Water Fund 350,000 35 , Total , Implementation ■ Complete negotiations with US Forest Service and Camp San Luis Obispo regarding the partnership purchase of the SP Property. 7/97 ■ Begin property acquisition negotiations with landowners 8/97 ■ Complete property acquisition negotiations; finalize and record sale 7/98 Public Art Policy The proposed property acquisition is not subject to the public art policy. The water supply projects have been expressly exempted from the public art policy as Utilities projects. Alternatives Direct staff to seek other means of project mitigation without the acquisition of property. Other means to accomplish the required mitigation without the outright acquisition of property may. be possible through negotiated conservation easements with willing landowners. However, for the required mitigations, fee acquisition is recommended. In the case of the required pond turtle mitigation site, significant other benefits accrue with the acquisition of this site as it contains numerous other open space and environmental benefits for the City. The SP Railroad site is currently for sale and SP has no interest in sale of a conservation easement on the property,therefore a willing landowner does not exist. Water Supply Mitigation (Continued) Project Effect on the Operating Budget ■ Purchase of these properties will have no direct impact on the operating budget. Some monitoring of the developed mitigations will be required and is identified under the appropriate water supply project description. Location Map A vicinity map of the proposed properties is attached. Proppurchasecipreq.doc WN I Z r' rIM �A 'M" Al -.0 01- Q N- �N'.N.... ... ... "g km' Ny-01`0' ........ W -x�R IN Ngg M. ....................... .. � ...rfi .. . .... W K M o' g OR N'.ZNN iV I.M -N �INN� . ..... I.A N� a Iroad Site SP R i % ;Sea A Nn.. V�' N, N A NlFrN, W X P gw 1.1a SAN LUIS . ..... el OBISPO N. .'s '&2 R W.g .......... ...N.. 227 IN. .. ..... ...gM Pond A W.-�'Ne' MEER L Mitigation a�e*�M;.- i igation N 1AR ,'AV I IN M�N�x: VON'A S. W g%*.— N, kllll �'.N� N I Ig. ;is: .. ... .1. NI AN I� N, k .........I N., N. p., gw .V-0, .1. -w WATER SUPPLY MITIGATION VICINITY MAP LA -W" city of SAN LUIS OBISPO san Luis OBISPO PLANNING BOUNDARY. �97979 MEMORANDUM June 3, 1997 TO: John Dunn, City Administrative Offic FROM: Bill Statler, Director of Finance SUBJECT: POLICE PATROL VEHICLE REPLACEMENT IN 2000-01 As part of the 1997-99 Financial Plan, 11 patrol vehicles are scheduled for replacement in 1997- 98. Based on adopted fleet management program guidelines that establish a three year replacement cycle for patrol vehicles, these should again be scheduled for replacement in 2000- 01. Due to an oversight, this is not reflected in the Preliminary Financial. For consistency with adopted fleet management policies, we recommend amending the CIP to include the replacement of 11 patrol vehicles in 2000-01 at an estimated cost of $319,000. Because this is in the fourth year of the CIP, there is no fiscal impact on the 1997-99 Financial Plan. HTING DATE.& ITEM #A -R'7 June 3, 1997 MEMORANDUM TO: Council Colleagues FROM: Dodie Williams SUBJECT: Sidewalk Sitting Ordinance Regarding the attached memo from Deborah Holley, BIA Administrator, dated May 30, 1997, I would request that the City Council direct staff to review the sample ordinances prohibiting sidewalk sitting to determine the feasibility of implementing a similar ordinance for the City of S Luis Obispo. an DW:ss Attachment �11CfJI�PJCIL ❑ �,, DIR � DIR YPIF, I9F 'ORNEY DIR CLE�I4�RIG d+ G�OUCE CHF ❑ MGMTTEAM J RI:C DIR 17 C I�E 0 W'.'L FAR r i . 4.'^il ego 30 May 1997 . To: Mayor Allen Settle and City Council Members From: Deborah HolleIA Administrator Re: Sidewalk Sitting Ordinance In an effort to reduce loitering, vagrancy, panhandling and disruption of normal business in the Downtown area, we respectfully request that the City Council consider adoption of an ordinance prohibiting sidewalk sitting. Copies of similar ordinances from Santa Barbara and San Jose are attached. Both cities recently enacted these ordinances based upon a similar law in Seattle upheld last spring by an appellate court. We believe that this is not an empty measure, but a loud and clear message that those who are in business have as much right to do business as do those who would obstruct or prohibit that right While we realize related activities such as panhandling or littering are not covered by this ordinance, in some cases the ordinance may limit the ancillary activities of those sitting on sidewalks for no other purpose. i Based on a recent survey of the Downtown businesses,nearly ninety percent responded that they believe all of the above mentioned activities are a real problem in the Downtown. We respectfully request that you review these documents and consider adopting this ordinance before the busy summer tourist season begins. I i cc: John Dunn Jeff Jorgensen Jim Gardiner, Chief of Police Pierre Rademaker,BIA President RECEIVED J-UN2 ivvl Cmr COUNCIL' CAN ,-.-,r�Po.CA P.O.Bos 1402•San Luis Obispo•CA•93406.8051541-0286•Fax 8051781-2647•e-mail:bia®slonet.org