HomeMy WebLinkAbout09/16/1997, 3 - YOUTH SPORTS FIELDS l.
j ecouncil epee
mber 16 1937
a Enaa izEpout '
J
CI . Y_ OF SAN LUIS OBISPO
FROM: rplul
LeSage, Director or Parks and Recreation
SUBJECT: YOUTH SPORTS FIELDS
CAO RECONEM ENDATION
By motion:
1. Authorize staff to begin negotiations on the Damen-Garcia and Pereira properties, as those
parcels are identified in the staff report, for the purpose of determining a site on which to
construct a multi-use athletic field complex.
2. Direct staff to return to Council with a recommendation to obtain the site that best meets the
City's needs for the athletic complex, consistent with the City's General Plan.
DISCUSSION
Background
The need for additional athletic facilities has long been recognized by those who are involved
with local youth sports programs. Simply stated, there are too many participants for the
existing number of fields. Additionally, many of the locations where sports are now played
were never intended to service community-wide programs. As a consequence, they lack the
necessary amenities, such as adequate parking, needed to operate quality activities. The
neighborhoods surrounding C. L. Smith School and Throop Park, for example, are sometimes
overrun with sports participants. A new facility would meet the existing field shortage and
take some pressure off of the impacted neighborhoods.
With the adoption of the revised Parks and Recreation Element of the City's General Plan in
May of 1995, the field shortage was officially acknowledged by the City. It needs to be noted
that this was not the only need identified by the Element. Council has taken action to address
other shortages. To date, over 26 Capital Improvement Projects have been approved. These
projects have: replaced outdated playground equipment, added four new neighborhood parks,
improved existing athletic fields, upgraded five elementary school multi-purpose rooms to
gymnasiums, and constructed the skateboard park.
It is also important to note that a sports complex provides the City with more than fields for
organized athletics. During the day, before programs begin, sports fields are wonderfully
quiet and serene places. They make excellent locations to eat lunch or just unwind from the
pressures of day-today living. Informal sports, pick-up games, and family picnics are other
activities one would observe in these locations. At least two of the potential sites could also
provide for trailheads to some very interesting hikes.
On July 15, 1997, the City Council directed staff to study potential sites on which to locate a
multi-field athletic complex. Funding for such a facility is included in the 1997-99 Financial
Council Agenda Report-Youth Sports Fields
Page 2
Plan. This funding represents the culmination of a long-term effort to address the need for a
central location in the community where athletic events can be conducted. At the meeting,
Council reviewed all existing parks for possible athletic field locations. Per a staff
recommendation, Council determined that, among the existing City parks, only Laguna Lake
Park could accommodate the athletic fields. Other privately-owned sites were identified as
possible locations and staff was directed to evaluate these further.
Site Analysis
Public input has been an important part of the process. This has included:
• meeting with field users on July 28
• neighborhood meeting with Laguna Lake Park neighborhood residents on August 4
• tour of fields with local environmentalists on August 6
• several on-site tours with Council members, commissioners, field users, and other
interested members of the community
• 'a survey of residents living in the vicinity of the Martinelli property
Staff considered a number of possible locations for the sports field complex. For a variety of
reasons, most were eliminated as being unsuitable. For example, one possible field location
could have been at Camp San Luis Obispo. An investigation of the site, coordinated with
assistance from State Senator O'Connell's office indicated that there was not an appropriate
location for the fields available at the Camp.
There is not a "perfect site" for the fields. Every location has some restraints. At four sites,
though, there seemed to be enough of an upside to warrant additional study. David Foote, a
local landscape architect with FIRMA, was enlisted to assist staff in this study. The Site
Feasibility and Cost Analysis Report that he prepared for this project is Attachment 1.
The major pros and cons of each site can be summarized as follows:
1. Damen-Garcia Property:
Pros:
• the area is already designated as a park site by the City's General Plan
• central location and accessible
• no major conflicts with existing neighboring land uses
• portion of land will be a park/open space dedication
Cons:
• depending on the site selected, topographic constraints could require considerable
earthwork cost
• depending on the site selected, creeks could fragment developable area and may require
mitigation
• temporary access easement and road required
• future residential neighborhood to the west
3��
Council Agenda Report-Youth Sports Fields
Page 3
The key to the Damen-Garcia property is the Margarita Area Annexation. If that can be
accomplished within a reasonable amount of time, this becomes an ideal site. Staff is in the
process of completing a draft of the Margarita Area Specific Plan that would satisfy the
General Plan prerequisite for annexation. At this time, the majority of property owners
support annexation, including the Garcias. Its best advantage is its location near portions
of the City with the highest population of children.
2. Pereira Property:
Pros:
• parcel includes a desirable open space acquisition
• actual development envelopes are consolidated and efficient
• as a visual entry to the City, if development is to be allowed on this site, park
development may be the most attractive of all potential development types possible on
the site
Cons:
• topographic constraints add significant earthwork cost
• the park development envelopes are separated by 80 feet of elevation change and the
upper area is somewhat remote
• there is potential for negative traffic impacts
• Calle Joaquin/Los Osos Valley Road intersection improvements may be required
• property is outside the City's Urban Reserve Line and presently planned for open space
• location would be perceived as quite distant from many City areas
• proposed raises General Plan consistency issues
• potential environmental concerns include on-site creeks and wetlands
• site is not accessible to mass or alternate transportation
• there are potential visual impacts associated with fencing and lighting
Several critical issues for the Pereira site are the ability to acquire the property and develop
the fields within the existing budget, and a number of associated planning issues which
were discussed in an earlier private recreation development proposal which was denied.
The recent offer by Eagle Energy, Inc., to purchase the Pereira property for a fueling
station (Attachment 2) does two things. First, it presents an opportunity to acquire the
property at no cost. Second, it complicates the negotiations with additional planning and
land use, environmental, and traffic concerns. However, this offer would be examined as
part of the evaluation of their property.
Positively, this site has the ability to provide a spectacular setting for athletic events while
providing the City with an important open space acquisition.
3. Martinelli Property:
Pros:
• not constrained by topography
• flexible parcel configuration possible to optimize facility layout
33
Council Agenda Report-Youth Sports Fields
Page 4
Cons:
• possible underground soil contamination requires further study
• significant existing drainage problems require resolution
• the site would be encumbered by a large storm water basin
• there is neighborhood opposition
There are too many uncertainties on this site, and considerable local opposition, for staff to
recommend negotiations at this time. A survey card was sent to the Rancho San Luis Mobile
Home Park residents asking for their reaction to the fields being located on the Martinelli
property. 45 of the 49 people responding expressed an objection to the fields. The response
cards are available at the Parks and Recreation Department for review. A sample card is
included as Attachment 3.
4. Laguna Lake Park:
Pros:
• there would be no land cost
• there is existing access and infrastructure development
• property would represent the lowest overall cost
• proper development would allow an efficient, consolidated development envelope
Cons:
• concerns have been expressed that field would harm the park's environment
• sports fields use inconsistent with adopted Master Plan
• perceived as windy and cold
• there is expressed neighborhood opposition
• there has been a lack of enthusiasm from field users
Laguna Lake Park is a site that could be developed in the most economical manner.
However, the strong objection from the adjacent neighborhood residents and lack of
enthusiasm from field users would make approval difficult.
Staff feels that either the Damen-Garcia or the Pereira properties would make a good location
for the sports fields. Both preliminary design concepts are bare bones and contain only
features related to the sports fields. There is no landscaping proposed outside of the field
areas. The areas would be left in a natural condition.
The dual negotiations should not delay the process of selecting the site that best meets the
City's needs for the sports complex. Staff intends to return to Council in a timely manner with
a specific recommendation.
FISCAL IMPACT
One-Time Costs:
1. Development:
Council Agenda Report-Youth Sports Fields
Page 5
The preliminary estimate of development costs for the sites is as follows:
Candidate Sites Development Cost
Damen-Garcia Property $2,530,217
Pereira Property $2,462,032
Martinelli Property $2,418,174
Laguna Lake Park $2,166,326
With determination of preliminary costs, every effort was made to include all possible
expenses. To this end, each project includes a cost for construction management. As was
pointed out in the July 15 report to Council, this is a project that was not anticipated by the
Engineering Division as part of the 1997-99 Capital Improvement Program.
While land costs on some of the sites have been suggested, staff has not pursued a firm price,
pending the approval of Council to begin negotiations. Staff believes that it will be possible to
acquire and develop each of the candidate sites within the current budget.
Portions of the Damen-Garcia property could be acquired as part of the Margarita annexation.
The offer by Eagle Energy to purchase the Pereira property and dedicate a portion to the City
could result in a cost savings. Each of the sites has the potential to receive in-kind services
from local businesses. Members of the community have expressed an interest in leading this
type of effort. Since the original construction of Sinsheimer Park over twenty years ago, this
type of community involvement has played a part in many projects.
2. Maintenance:
There will be one-time, start-up costs for the purchase of new maintenance equipment
estimated at $90,000.
On-Going Costs:
1. Maintenance:
If this project was to move ahead on a reasonable schedule, it could be ready for play in the
spring of 1999. At that time, the City would have to assume the cost of operations and
maintenance. An in-depth study of these costs can be undertaken once a design is approved. It
is certain to be in the $130,000 range annually.
2. Program Administration:
Costs associated with facility management will depend on the design of the facility and
programs offered - a rough estimate is $25,000 annually.
ALTERNATIVES
Continue seeking other locations on which to develop fields. This is certainly possible but not
very likely. Staff has pursued every known lead. This includes everything from the old Vons
J750
Council Agenda Report-Youth Sports Fields
Page 6
site (too expensive) to any surplus property the County might have (there is none). Among
field users, there continues to be a sense of urgency mixed with frustration. Like everyone
else who was involved in the Cal Poly project, they are emotionally drained by that process.
Their representatives have visited the candidate sites and find them acceptable. They are
anxious to make a decision on a specific site and willing to become involved in the
construction.
CONCURRENCES
It was the consensus of the Joint Use Committee, at their August 26 meeting, that either the
Damen-Garcia or Pereira location would be an acceptable site for the fields. The Parks and
Recreation Commission supported the staff recommendation at their September 3 meeting.
ATTACEMIENNT
1. Site Feasibility and Cost Analysis Report
2. Letter from Eagle Energy, Inc.
3. Neighborhood Survey Card Sample
O:%CAORMCAOYOVI'HSFOR7SFB3J)SSER6.DOC
3�6
Youth Athletic Fields
Site Feasibility and Cost
Analysis Report
PREPARED FOR:
Paul LeSage, Director
Parks and Recreation Department
City of San Luis Obispo
firma
Landscape Architecture
Planning
Environmental Studies
Ecological Restoration
849 Monterey Street
San Luis Obispo CA
93401
805.781.9800
ATTACHMENT 1�
A. Purpose And Scope
This report was prepared by firma under the direction of the Parks and
Recreation Department to analyze and compare the development potential and
general cost for creation of a sports field complex on the four candidate properties
listed below and shown on Map 1 :
o Laguna Lake Park
v Martinelli property
v Pereira property
v Damen-Garcia property
The park development program includes the following components:
o Four full-size soccer fields
o Three softball fields
o One baseball field
o Lighting for one softball field
o Parking for 100 cars
o Restroom and storage buildings(s)
v Subsurface turf drainage system
v Backstops, skinned infield, dugouts and bleachers for the organized softball fields
Each site was evaluated for its ability to accommodate the program elements in a
reasonable spatial arrangement. The concept plans included in this-report show
the general spatial requirements of the play fields. The maps should be
considered generalized concepts only, subject to further study and design
refinement based on detailed site analysis, program development and the final
development budget. Further study could conclude more or less acreage is
needed at any site.
The program does not include complete landscape and irrigation for areas within
the property but outside the ballfields. The primary goal of the project is to
develop high quality, up-and-running sports fields that include sub-surface turf
drainage, backstops, bleachers, dugouts and skinned infields.
The .estimated development costs were prepared using park development data
generated by firma, Sasaki Associates of San Francisco and the City of
Fremont.
The physical site constraints for each property were studied using on-site
reconnaissance, interviews with City staff, and review of previous environmental
and planning documents.
B. Summary
Development costs for the four sites vary based on site constraints that affect the
shape or envelope of developable land, such as topography, creeks and
drainages and access. The sites also vary in the amount of money needed to
address things like CEQA review and studies, street improvements and storm
water management. This report did not consider the cost of land for each
property.
t
,J-0
The following table summarizes the estimated development costs for each site.
Detailed cost breakdowns are included in the analysis for each site following in
this report.
Comparison of Costs
Candidate Site Development Cost
Damen-Garcia Property $2,530,217
Pereira Property $2,462,032
Martinelli Property $2,418,174
Laguna Lake Park $2,166,326
The major pros and cons of each site can be summarized as follows:
1. Damen-Garcia Property
Pros
• the area is already designated as a park site by the City's General Plan
• central location and accessible
• no major conflicts with existing neighboring land uses
• portion of land will be a park/open space dedication
Cons
• depending on the site selected, topographic constraints could require considerable
earthwork cost
• depending on the site selected, creeks could fragment developable area and may
require mitigation
• temporary access easement and road required
• future residential neighborhood to the west
2. Pereira Property
Pros
• parcel includes a desirable open space acquisition
• actual development envelopes are consolidated and efficient
• as a visual entry to the City, if development is to be allowed on this site, park
development may be the most attractive of all potential development types possible
on the site
Cons
• topographic constraints add significant earthwork cost
• the park development envelopes are separated by 80 feet of elevation change and
the upper area is somewhat remote
• there is potential for negative traffic impacts
• Calle Joaquin/Los Osos Valley Road intersection improvements may be required
• property is outside the City's Urban Reserve Line and presently planned for open
space
• location would be perceived as quite distant from many City areas
• proposed raises General Plan consistency issues
• potential environmental concerns include on-site creeks and wetlands
• site is not accessible to mass or alternate transportation
• there are potential visual impacts associated with fencing and lighting
2
3-9
3. Martinelli Property
pros
• not constrained by topography
• flexible parcel configuration possible to optimize facility layout
Cons
• possible underground soil contamination requires further study
• significant existing drainage problems require resolution
• the site would be encumbered by a large stormwater basin
• there is neighborhood opposition
4. Laguna Lake Park
Pros
• there would be no land cost
• there is existing access and infrastructure development
• property would represent the lowest overall cost
• proper development would allow an efficient, consolidated development envelope
Cons
• concerns have been expressed that field would harm the park's environment
• sports fields use inconsistent with adopted Master Plan
• perceived as windy and cold
• there is expressed neighborhood opposition
• there has been a lack of enthusiasm from field users
3
3-/d
WIN
,
Ah 1�Y
11�1
�SC����.I������■'i � �, ',,,r',\5 II � , 1111'l�l.-I,i
c �r s. r ��� t1•
� t \
�` 111 ■ '• %�
I,IIYYYYY�1 �"
all
Ilml milli
l �
. .
Feasibility Map 1
Site • Report
City Of Obispo North
DepartmentParks & Recreation
C. Evaluation of Candidate Park Sites
1 . Damen-Garcia Site
Current City planning documents indicate that a portion of Damen-Garcia
property is designated for public park use. Within that area are several sites
that could accommodate the sports fields.
❑ Topography: Most of the site is under 10% slope. A four or five acre area
consisting of an old rock quarry is steeper and would require significant earthwork
to create area for several of the fields.
❑ Flooding: The 100 year flood zone is confined closely to the creek and drainage
ditch on the site and does not pose a significant constraint.
❑ Biological Resources: No known sensitive plants or animals occur on the site.
The creek and ditch are classified as wetlands and must be protected or restored,
if altered. Protection and enhancement of these wetlands are included in the cost
estimate for this site.
❑ Visual Resources: Portions of the site are visible from Broad Street.
Commercial/Industrial land uses across Broad Street would not be visually
impacted by park development.
❑ Traffic: Access would be off the proposed Prado Road extension aligning with
Industrial Way at Broad Street. A temporary access easement and road over an
adjacent parcel would be necessary until Prado Road is built.
o Wind: The site is somewhat less windy than parts of the western end of town due
to the South Hills, however,this site experiences regular wind.
❑ Noise: Mobile homes exist within about 500 to 600 feet from potential park active
areas, with no opportunity for topographic interruption. However, it is not likely
Noise Element standards would be exceeded.
❑ Reclaimed Water: A reclaimed water distribution line is planned to extend
along Prado Road. No additional development cost to bring reclaimed water to the
site is required.
❑ Policy Issues: A portion of the needed park site could be a park dedication as
part of the land use entitlements which may arise through the Margarita area
annexation Specific Plan, now in progress. However, at this time it is premature to
anticipate a park land dedication.
❑ Cost Factors: The significant contingent costs for this site include:
• up to approximately$250,000 in earthwork depending on the actual site selected
• potential creek protection and enhancement depending on the actual site
selected
• acquisition of temporary access easement
5
gWtr.. :..
\,l �Il �lti,:\\11111,1�`��`�\`♦\' \\\\\\\\``� `
AZ
,, i.
\
4-1
\ \ "•�. ,•. \ �,�:iii::'':`_::..".. v._�i,a�,.,. ,..
i j F90, y, )�Mi. i
Gar�Fa\ .P-irR [ c„i:: = ,:1
OOOF
Vl
1 �
, i
I,I 1'7,:-�7-
% ,111 j
Garcia Sites
Site Feasibility & Cost Analysis Report Map 2
City Of San Luis Obispo North -/
Parks & Recreation Department Scale: 1"= 1000' fi ma
I I
I I
I O
I I
I I
I I
O O I
I Parking(Fo-
I
I I
° Parking
SITE: I
I 25 ACRES
Garcia Sites
Site Feasibility & Cost Analysis Report Map 3
City Of San Luis Obispo 3-/
Parks& Recreation Department Scale: 1"= 200' firma
Cost Mudel for Youth Athletic Field Development
Damen-Garcia Site
Acres of Park Land 25.0
Cost/Acre(rounded) 101 209
kam! Description Unit UnItCost Quantity - Extension Coat
1 Off Site Construction SF Iso 6,000 9,000 9,000
2 Pre-Landscape Construction Preparation 54,446
Clearing, Demolition SF 0.05 1,086,920 54,446
3 General Site Work 326,676
Rough Grading SF 015 1,066,920 163,336
Drainage SF 0.05 1,088,920 54,446
Utilities SF 0.10 1,068.920 108,692
4 Paving 240,000
Parking Spats-Lighted EA 2,000.00 100 200,000
Pedestrian/Vehicular Paths SF 4.00 10,000 40,000
5 Youth Baseball/Softball 700,000
Allowance for 1 field EA 200,000.00 3 600,000
Lighting EA 100,000.00 1 100,000
6 Baseball 70,000
Allowance for 1 field EA 70,000.00 1 70,000
7 Soccer/Football 480,000
Allowance for 1 field EA 120,000.00 4 480,000
8 Restroom/Storage 70,000
Allowance for 600 SF building EA 70,000.00 1 70,000
9 Contingency items 309,000
•' CEQA Review 6,000 6,000
'•• Environmental Mitigation AC 20,000.00 3.60 72.000
Additional Earthwork Cr 3.50 66,000 231,000
Reclaimed Water Line o
Sub Total 2259122
10 Construction Management 5% 112.956 112,956
11 A-E Cost 7% 156,139 158,139
Grand Total 2,530,217
•Temporary acaesa nmd
" Expanded Wdai S"and 1AUptad NO
Creek fencing and reswrat w
8 ��/S
2. Pereira Site
The entire proposed property encompasses about 76.5 acres of which just
over 19 acres are required for park development. The remaining 57 acres
would become open space and be managed as part of the City greenbelt.
❑ Topography: Although significant areas of slopes from 5%to 10%are available
on the site, the development program would require grading on slopes over 20%
in some areas.
• The necessary earthwork is an additional cost, but can be done in a manner to
avoid visual impacts.
❑ Flooding: The lower portion of the site near Froom Creek and Calle Joaquin is
within the 100-year flood zone, however, this is not considered a serious
constraint.
❑ Biological Resources: The site contains two creeks which have sensitive
botanical species and probably provide significant wildlife value. Some native
perennial grassland exists on the upper slopes.
• The biological resources appear to be able to be retained and protected through
management as a greenbelt open space preserve.
❑ Visual Resources: The upper portions of the site are visible from the U.S. 101 and
many areas in the City from a distance. This would be retained as open space.
• The lower to mid-level areas are not particularly visible due to existing willow and
eucalyptus trees which would be retained.
• The upper play field area would not be visible from any significant vantage point
since it is already relatively flat and will be graded flatter.
❑ Traffic: The site is accessed by Calle Joaquin which can easily accommodate
increased traffic volumes.
• Improvements to the Los Osos Valley Road/Calle Joaquin intersection would be
required to accommodate increased traffic($100,000).
❑ Wind: The site is somewhat protected from the prevailing winds which affect the
other three candidate sites.
❑ Noise: Existing background noise levels are about 68 dBA Ldn due to freeway
traffic. The addition of all day and evening play could increase the Ldn over 70
dBA at the neighboring motel, in exceedance of noise standards.
❑ Reclaimed Water: The cost of bringing reclaimed water to this site is estimated
by the Public Works Department as between $25,000 and$100,000.
❑ Policy Issues: Unlike the other candidate sites, which are already more or less
enclosed by urbanized lands,this site would annex an area at the edge of the City.
However, the proposal is consistent with the City's goal of acquiring open space
lands for a greenbelt around the City. The ratio of open space to park land on the
site is almost 4:1,outside the Urban Reserve Line.
❑ Cost Factors: Contingent costs include intersection improvements to Calle
Joaquin/Los Osos Valley Road ($100,000), additional earthwork ($135,000) and
reclaimed water line ($25,000 to $100,000).
O C �.
DEDICATIO i P RK\
57 ACRES \9 0 O C
)\ DEV MENT/
SBY-TV 10.2 ACRES /
Motel
' Cify Limrt � ��
\ CAL
Pereira Site
Site Feasibility & Cost Analysis Report Map 4
City Of San Luis Obispo North
Parks & Recreation Department Scale: l"=400' firma
. 3a
% \v/
en Space
Dedi ation Area
l
ervi o d /
Pe is ,Path
• i
Creek Set ck Zone
Parking
Creek Setback
Zone
y Parkin
CALLE
J0AQV 1N
Pereira Site
Site Feasibility & Cost Analysis Report Map 5
City Of San Luis Obispo North
Parks&Recreation Department Scale: 1'=200' firma
imo
Cost MDdel for Youth Athletic Field Development
Pereira Site
Acres of Park Land 192
Cost/Acre(rounded) 128231
nem a Description Unit unit cost Quantity Extension Coat
1 Off Site Construction 100,000
2 Pre-Landscape Construction Preparation 41,818
Clearing, Demolition SF 0.05 x38,352 41,818
3 General She Work 250,906
Rough Grading SF 0.15 838,362 125,453
Drainage SF 0.06 836,352 41,818
Utilities SF 0.10 838,362 83,636
4 Paving 240,000
Parking Spaces-Lighted EA 2,000.00 100 200,000
Pedestdan/Vehicular Paths SF 4.00 10,000 40,000
5 Youth Baseball/Softball 700,000
Allowance for 1 field EA 200,000.00 3 600,000
Lighting EA 100,000.00 1 100,000
6 Baseball 130,000
Allowance for 1 field EA 130,000.00 1 130,000
7 Soccer/Football 480,000
Allowance for 1 field EA 120,000.00 4 480,000
8 Restroom/Storage 70,000
Allowance for 600 SF building EA 70,000.00 1 70,000
9 Contingency items 185,520
" CEOA Review 1s,000
Environmental Mitigation 10,000
Additional Earthwork CY 3.50 38,720 136,520
Reclaimed Water Line 25,000
Sub Total 198243
10 Construction Management s% 109,912 109,912
11 A-E Cost 7% 153,877 153,877
Grand Total 2 462 032
*Traft irnprovements at Calle Joaquintim Csos Valley Road
Expanded INdai Study and ND(Cultural Resources,Traffic,Biology)
Cost assumes alternate ffiIgnrnent of currently planned distribution lure.
with no change cost to connect would be,5700.000.
12 ,��9
3. Martinelli Site
The Martinelli property adjoins the City limits in the Margarita annexation area.
It is undeveloped and adjoins the Unocal property to the south and industrial
park development to the west. The land is tentatively planned for industrial
park use in the Margarita area annexation Specific Plan now in progress,
however, the current land use category under the County General Plan has a
recreation zone overlay which allows ballfields.
❑ Topography:The site is flat and does not present earthwork constraints.
❑ Flooding: The site is largely, if not entirely, within the 100-year flood zone.
Drainage conveyance deficiencies exist in Prado Road along the site which result
in ponding and flooding of the neighboring mobile home park.
• Preliminary drainage studies for the annexation area call for a large stormwater
basin on this site.
• The City Engineer believes a detailed regional drainage study is needed to
determine the scope of potential drainage improvements which may be obligatory
with this site.
o Biological Resources: No sensitive species occur at this site. The site is
infested with common Bermuda grass which will be impossible to fully eradicate.
Bermuda grass will compromise the quality of the play field turf.
❑ Visual Resources: The site is not highly visible from existing surrounding land
uses.
o Traffic: Prado Road is planned for extension through the Margarita annexation
area linking to Broad street. The property fronts existing Prado Road which is an
improved County road. The future alignment may bend to the south as shown on
Map 4.
• Development of the site will increase traffic on Prado Road which currently has
very low use. The increase will appear dramatic to residents along Prado Road,
however,the street has capacity for the added trips.
• Neighbors are concerned about traffic volume, speeds and sight distance.
❑ Wind: The site is moderately to highly windy as is much of the western part of the
City.
❑ Noise: The site activity areas are within 600 feet of existing residences (mobile
home park). Because existing background noise levels are low in the area it is
unlikely that the ballfields will create a noise standard exceedance. However,
noise will increase and be noticeable at the mobile home park.
❑ Reclaimed Water: A reclaimed water distribution line is planned to extend
along Prado Road. No additional development cost to bring reclaimed water to the
site is required.
❑ Hazardous Waste: Known ground contamination exists on adjoining Unocal
property which may extend this site. The site may have been used for petroleum
storage years ago. Further investigation is necessary to determine the level of
constraint existing and remediation costs.
❑ Policy Issues: This proposed site is closer to existing residences than the other
three candidate sites which raises land use compatibility issues.
❑ Cost Factors: The significant contingent costs for this site include:
• construction and maintenance of a 2.3 acre stormwater basin ($150,000)
• potential drainage improvements and soil cleanup (costs unknown)
• preparation of a focused EIR ($30,000)
13 t'�O
Mobile Home
Park
PRADO ROAD F(lTU
'O9
O
O
Parking O
O
N
O
Parking
J
W
N
SITE:
25 ACRES LL I
o
2.3 Ac.
ketention
Basin
Unocal
Martinelli Site
Site Feasibility & Cost Analysis Report Map 6
City Of San Luis Obispo North
Parks& Recreation Department Scale: 1•=200' firma
Cost Model for Youth Athletic Field Development
Martinelli Site
Acres of Park Land 25.0
CosUAcre(rounded) 96,727
Item 0 Description Unn Unit cost Quantity Extension Cost
1 Off She Construction SF 1.50 14,000 21,000 21,000
2 Pre-Landscape Construction Preparation 49,441
Clearing, Demolition SF 0.05 958,812 49.441
3 General Site Work 296,644
Rough Grading SF 0.15 988,812 148,322
Drainage SF 0.05 980.812 49,441
Utilities SF 0.10 988,812 98,881
4 Paving 232,000
Parking Spaces-Lighted EA 2,000.00 100 200,000
PedestrianNehicular Paths SF 4.00 8,000 32,000
5 Youth Baseball/Softball 700,000
Allowance for 1 field EA 200,000.00 3 600,000
Lighting EA 100,000.00 1 100,000
6 Baseball 130,000
Allowance for 1 field EA 130.000.00 1 130,000
7 Soccer/Football 480,000
Allowance for 1 field EA 120.000.00 4 480,000
8 Restroom/Storage 70,000
Allowance for 600 SF building EA 70,000.00 1 70,000
9 Contingency hems 180,000
•• CEGA Review 30,000
••• Environmental Mitigation 150,000
Additional Earthwork o
Reclaimed Water Line o
Sub Total 2,159,0
10 Construction Management 5% 107,954
11 A-E Cost 7% 151,136
Grand Total 2 418174
•Temporary access road off Redo: 20'AC.
•• Fomaed EIR:Nova,Hazardous waste 8 Drainage a W/Ws.
•" RetenSon basin earthwork.fendrq,WrxWoape(23 acres).
15
4�0&L
4. Laguna Lake Park
The area of the existing park which could be considered for sports fields
consists of about 17.6 acres between Madonna Road and the existing day use
area. This area is undeveloped except for trees. The Laguna Lake Park
Master Plan shows some of this area as being developed as non-organized
turf with windbreak berms and tree planting, with the balance as undeveloped
open space.
o Topography: The site is relatively flat and earthwork costs would be low.
o Flooding: The play field site is not in a flood-prone area.
o Biological Resources: No sensitive plants or wildlife are known to exist on the
play field site.
o Visual Resources: The proposed development would be primarily open turf.
The backstop/infields can be clustered 600 feet from the lake shore. Tree
planting would screen views from residences to the play fields.
o Traffic: Parking can be situated away from the lake along the existing park road
and near Madonna Road. Additional traffic would not impact local residential
streets.
o Wind: The site is extremely windy and cold much of the time. The adopted
Master Plan envisions earth berms and windbreak developed in layers across the
site. Implementation of these measures is included in the cost estimate for this
site.
o Noise: The main activity areas are over 1,000 feet from neighboring residences.
Although noise increase will occur it is not anticipated that these will exceed Noise
Element standards.
o Reclaimed Water: A reclaimed water distribution line is planned to extend to
Laguna Lake Park. No additional development cost to bring reclaimed water is
required.
o Policy Issues: The adopted Laguna Lake Park Master Plan (1993) explicitly did
not include organized play fields at this site based on community consensus. The
Master Plan would require revision if this site is selected.
o Cost Factors: Development would be less expensive at this site than other
candidate sites for several reasons:
• no land cost
• limited infrastructure cost
• limited earthwork
as
O
P rking
t
h ° Parking
.11.Tre 1
cr
Windbr .. SITE:
17.6 ACRES
Laguna Lake
� 1 \
Laguna Lake Park
Site Feasibility & Cost Analysis Report ♦ Map 7
City Of San Luis Obispo North
Parks& Recreation Department Scale: 1"=200' firma
Cost Model for Youth Athletic Field Development
Laguna Lake Site
Acres of Park Land 17S
Cost/Acm(rounded) 123,08
Rom 9 Description Unit unit cost Quantity Extension oost
1 Off Site Construction 0 0
2 Pre-Landscape Construction Preparation 38,246
Clearing, Demolition SF 0.05 764,913 38246
3 General Site Work 229,474
Rough Grading Sr- 0.15 764,913 114,737
Drainage SF 0.05 764,913 38,246
Utilities SF 0.10 764,913 76,491
4 Paving 248,000
Parking Spaces-Lighted EA 2000m 100 200,000
PedestrianNehicular Paths SF 4.00 12,000 48,000
5 Youth Baseball/Softball 700,000
Allowance for 1 field EA 280,000.00 3 600,000
Lighting EA 100,000.00 1 100,000
6 Baseball 130,000
Allowance for 1 field EA 130,000.00 1 130,000
7 Soccer/Football 480,000
Allowance for 1 field EA 120A00.00 4 480,000
8 Restroom/Storage 70,000
Allowance for 600 SF building EA 70,000.00 1 70,000
9 Contingency Items 38,500
• CEQA Review 6,000 6,000
Environmental Mitigation o
•' Additional Earthwork cY 2M 13,000 32,500
Reclaimed Water Line o
Sub Total 1934 220
10 Constructlon Management 5% 96,711 96,711
11 A-E Cost 7% 135,395 135,395
Grand Total 166,326
• Expanded tutusi Study m,d Ntlgaled N
••
plate dredge span in w{n 2 reaklberm per Master Pian
i
Table A Average Unit Costs for Park Development
Remi Description Unit cost Remarks
1 OH Site Construction WC
2 Pre-Landscape Construction Preparation
Clearing, Demolition SF 0.05
3 General Site Work
Rough Grading SF 0.15 Assumes avg. 12"depth cut/fill,balanced site
Drainage SF 0.05
Utilities SF 0.10
4 Paving
Parking Spaces-Lighted EA 2,000.00 Allow 450 sf per car
PedestdanNehicular Paths SF 4.00 See Note 1
5 Youth Baseball/Softball
Allowance for 1 field EA 200,000.00 See Notes 4.5
Lighting EA 100,000.00
6 Baseball
Allowance for 1 field EA 130,000.00 See Notes 4,6
7 Soccer/Football
Allowance for 1 field EA 120,000.00 See Notes 4,7
e Restroom/Storage
Allowance for 600 SF building EA 70,000.00
Notes:
1 Pedestrian/Vehicular Paving: Assumes 10 IL wide paths/mves at$4.00 per sf of paving.
2 Groundmver/Shrubs,Lawn-Seeded: Quantities assumes 25%gmurWwver/shrubs and 75%lawn In all landscape areas,excluding play0elds.
3 Groundmver I Shrubs: Assumes groundcover in entire planting bed and 5 gallon shrubs at 4'O.C.over 50%of groundwver/shrub area.
4 Playing Fields and courts do not Include general site work,Le.,clearing and grubbing,rough grading,and storm drainage system.
5 softball-Organized: Assumes lawn,4rlgatlon.backstop.fencing,skinned Infield,dugouts,and subsurface drainage. Assumed area.1.4 acre/field.
6 Baseball-Pracdce/Pidap: Assumes lawn,Irrigation,skinned field,and backstop only. Assumed area.32 aQwfwd.
7 Soccer/Football-Orgentzed: Assumes lawn,Irrigation,goalposts,and subsurface drainage. Assumed area.1.9 acre/neld with 20%
overlap on softball fields.
6 EA.each:LF—firlear feet SF.square feet
Source:FIRMA,Sasald Associates,Inc.and City of Fremont,1994
September 2, 1997
E&k ane , Inc
The Honorable Mayor Allen Settle and
City Council of San Luis Obispo
990 Palm
San Luis Obispo,CA 93401
Dear Mayor Settle and City Council Members:
Our family operates Eagle Energy,Inc.dba Henderson Petroleum headquartered in San Luis Obispo. We are also
very active in youth sports,especially soccer where we have been active as coaches,managers and team financial
supporters with AYSO,SLO Club Soccer and San Luis Obispo High School Soccer.
We feel an opportunity exists where Eagle Energy, Inc.and the City of San Luis Obispo can work together for the
common good of the area.
We have been operating a cardlock facility and warehouse for lubricants in San Luis Obispo since buying the assets
of Henderson Petroleum in 1992. We feel our best long-term facility option is to move our location of operation
from Orcutt Road to a site near Highway 101 to provide easier access for our customer base and for the many
customers using the CFN fueling network.
Currently,because of our location in San Luis Obispo, many customers prefer to use fueling facilities in Santa
Maria, Arroyo Grande,Atascadero or Paso Robles. With the right facility and location,we can attract many of
those customers to fuel in San Luis Obispo.
We would like to discuss the feasibility of purchasing and developing a 60-acre parcel on Calle Juaquin to include
our operational headquarters and fueling facility and sports fields. Our operation would use the northeastern 2-4
acres leaving ample room and level sites for a number of soccer/sports fields. Having walked the property we
would expect up to 8 soccer fields could be accommodated with suitable parking.
This plan would enable Eagle Energy,Inc.to remain in San Luis Obispo,generate an increased tax base within the
City and provide much needed sports fields for our ki&today and into the future.
As time is of the essence in our need to secure a long term location of operation,please contact me at your earliest
convenience to discuss next steps to move this proposal forward. Thank you for your interest and consideration.
Sinc y,
Dan G.Schultze RECEIVED
President
SFP 0 2 1997
SLO CITY COUNCIL
ATTACHMENT 2
Mailing Address:P.O.Box 837 •San Luis Obispo,CA 93406
Phone:(805)543-7090 1-800-549-FUEL Fax:(805)543-8556
1
Please fill out and return the following to the Parks and Recreation Department,
1341 Nipomo Street, San Luis Obispo, CA 93401
Regarding the location of athletic fields on the Martinelli Property (check one):
❑ I have no objections.
❑ I have the following concerns, as listed in the comments section below:
❑ I object to the project for the following reasons:
Comments:
Name: Phone:
Address:
ATTACHMENT 3
MEETIN GENDA
JL DATE1�_ITEM # ifj
,� 'tivsr z
P.
John L. Wallace & AssociateAN
WA '`
Civil Engineering•Surveying Plonnin `G``'�CAXV0;WREAU TIE J
IYf88QfRANCHOOAK 0 '
ni rfi 80�
(�• 5.4r"4�2966Sz
ce ' SAN WISOHISPO;CA 93401
"'.H F�sx�VViy'•�1 Y!�.;"'s'i; ��� �.+.. ,...'!r�:i:..-:,..x`�w-., .ri..{;�Y�.'•'?i'�
TCDD DIR
To: San Luis Obispo City Council EK eFFIN DIR
AO ❑SIRE CHIEF
ATTORNEY D DIR
From: Martinelli Familyo ABLE KI Munn
ICCERCHF
7 TEAM
W. DIR
Date: September 16, 1997 ° °PINI MR
Subject: Youth Sports Field Staff Report of September 16, 1997
First, we agree that the location of the Martinelli and Damen-Garcia
properties are superior to alternative sites. The area is centrally located and
the inclusion of sports fields in this area would significantly decrease the
dependence on auto transportation for the target population-community
youths. In addition to a central, bike friendly location, the Margarita area is
planned for significant residential infill and business park development which
can absorb pre-planned recreation facilities with relatively few conflicts. It
could easily be situated to enhance rather than conflict with final project build
out in the area.
However, we also believe that some of the information provided in the above
cited Staff Report incorrectly characterizes the potential of the Martinelli site
as a future Site for the Youth Sports Field Complex as follows:
The report cites the following Cons affecting the Martinelli Property:
• Possible underground soil contamination (very unlikely)
All known RWQCB evidence indicates that the site IS NOT
contaminated. It is evident that testing of existing Monitoring Wells
installed at the Unocal Site and and/or boundary borings will completely
resolve this issue.
In addition, the adjacent Damen-Garcia Property lies in similar
proximity to the Unocal site and, we believe, would require the same.
review by the City to fully clear this issue.
4115 Brnad.S1reel..Stale B-5•.San Liris Obispo. Cr.li(nrnin 93J4/--963•Phone leq?J 514-4011 1-n.r(805)544-4194
• Significant existing drainage problems require resolution
The drainage problems referred to which affect the MobileHome Park
are directly related to the original, inadequately engineered drainage
facilities located on the Mobile Home Parks eastern boundary- these
problems are not affected by the Martinelli property located to it's
southeast.
• The site would be encumbered by a storm water basin.
Prior to the design and construction of an areawide drainage system
which will transfer regional run-off from the Margarita Area into San
Luis Creek, all the properties within the area will be required to mitigate
on-site drainage. The dual utilization of dry weather sports activities and
stormwater retension is commonplace in many communities.
• There is neighborhood opposition
A Survey Card was sent out by the City requesting feedback related to
the proposed siting of athletic fields only on the Martinelli Property,
while a Damen-Garcia Property project, also taking Prado Road access
and generating the same traffic pattern was not, why?
In addition, the utilization of Damen-Garcia property is entirely
dependent upon an annexation which will eventually add traffic not only
for the Sports Complex but also with arterial traffic from South Higuera
to Broad. Also internal traffic related to the proposed school site and it's
significant residential and business park development potential. Traffic
generation is a given in the Margarita area.
While the Damen-Garcia site is well placed for this recreational use, the
project itself hinges on an annexation which is loaded with the potential
for significant time delays.
PROS-Martinelli
• The property could be utilized for Youth Recreation IMMEDIATELY-
the site is adjacent to the existing City limits and under County zoning
where Recreational uses are CURRENTLY allowed. The Youth facility
could be processed, approved and built while still in the County
jurisdiction in less than a year utilizing on site water and access
resources, it would not be tied to the annexation issues.
• The proposed site will eventually be completely surrounded by business
park development. Master Planning this use will integrate the project
into the area, enhancing both uses.
• The Martinelli site is level and can take existing access directly from the
improved portion of Prado Road where clear capacity for the additional
trips already exists.
• Limited grading would be involved resulting in the development of
playing fields that do not interfer with one another.
• Existing on-site water resources would allow the project to move ahead
immediately, with the final installation of reclaimed water when
appropriate.
• No significant environmental problems exist on site, a project would
move rapidly through the approval process..
• The City has adequate, budgeted funds to acquire, process and complete
the proposed project immediately on the Martinelli property.
} Z
• n
a S O
a
cc
� C v
7 Y
ac
v �
r C
lz
/ - o
�+ +
f
x
x 0 Vt
a
4
.....:......:.... .......... ...:.....
. 0 0 � _� -
+O ''
i p
tj
d +� 0 O 0 °
F