Loading...
HomeMy WebLinkAbout07/21/1998, 9 - NACIMIENTO WATER SUPPLY PROJECT AMENDMENT TO AGREEMENT council M° Date T�,l ZI 1ri�'i8 j acEnaa Pepoat e�N C I TY OF SAN LU IS O B I S P O FROM: John Moss,Utilities Directo /1 Prepared by: Dan Gilmore,Utilities Engler SUBJECT: NACIMIENTO WATER SUPPLY PROJECT AMENDMENT TO AGREEMENT CAO RECOMMENDATION: By motion; conceptually approve Amendment No. 1 to Agreement A-15-94-CC,reaffirming the City's commitment to completion of the EIR Phase of the Nacimiento Water Supply Project DISCUSSION: In June of 1992, the County hired a consultant to perform preliminary assessments of various aspects of the Nacimiento Water Supply Project. This work included a reliability assessment and preliminary engineering, geotechnical, and environmental assessments. Initially, 28 entities, including the City of San Luis Obispo, entered into reservation agreements with the County to participate in the subsequent project study phases. Other work completed to date includes the preparation of the Preliminary Engineering Evaluation and Environmental Assessment,which was subsequently approved by the County Board of Supervisors. The current phase of the project involves the preparation of the Environmental Impact Report(EIR). The efforts of three consulting firms culminated into the release of the draft EIR (DEIR) in September of 1997. The DEIR underwent an extensive public review period,which resulted in some significant comments. In responding to public comments on the Draft Environmental Impact Report (DEIR) for the Nacimiento Water Pipeline Project,it was determined that certain changes to the project description and supplemental analyses were necessary to produce a legally defensible EIR. Under CEQA, these changes to the project description and supplemental analyses warrant the preparation and recirculation of a revised DEIR. Amendment No. 1 to Agreement A-15-94-CC represents the City's commitment to reimburse the County for the City's proportional share of the costs to complete these additional studies,circulate a revised DEIR,and prepare the Final EIR(FEIR) To date,the City has contributed$318,758 as the City's proportionate share of the cost to prepare the preliminary studies and the DEIR. San Luis Obispo County has estimated the City's share of the cost for the additional work to be between$87,374.58 and $112,978.90. The range of costs is dependent on the number of project participants that agree to execute the amendment to the agreement and continue their participation in the project. The low value assumes that participation by all current participants will remain unchanged. The high figure would be the City's share of the costs if only the four largest participants remain. The four largest participants are Paso Robles (4000 afy), San Luis Obispo (3380 afy), Atascadero Mutual Water Company (3000 afy), and Templeton Community Services District(1475 afy). Council Agenda Report-Nacimiento Project Phase II Amendment to Agreement Page 2 Since the actual cost distribution for this amendment will not be certain until the agreement is approved by the agencies continuing their participation through EIR certification, staff is recommending conceptual approval of the amendment. Once the amendment is approved by the agencies wishing to continue their participation in the project and then approved by the County Board of Supervisors, the actual cost distribution will be tabulated and included in the final Amendment No. 1 to the original agreement, which will be brought back to Council for consideration at that time. As Council is aware,the City of Paso Robles took action on July 7, 1998,on a 3-2 vote,to not fund their share of the cost to complete the EIR as described in this amendment. The primary concerns or issues being cited by Paso Robles City Council were frustration with the project management to date and a desire for additional justificationby the County and Boyle Engineering for the increased costs to complete the EIR. While this action by Paso Robles may appear immediately unfortunate, it is premature to speculate on the continued development of the proj ect and EIR at this time. Paso Robles City Council may be reconsidering their action on July 21, 1998,and additional information provided by the County and Boyle Engineering may satisfy their concerns. Additionally, the continued participation by the remaining NPAC agencies is still uncertain and the project may be feasibly completed without the participation of Paso Robles. In any case, at this time, Council is being asked to consider the position of San Luis Obispo relative to the completion of the EIR for the Nacimiento pipeline project and to reiterate Council's commitment to completing this EIR phase of the project The Nacimiento Water Supply Project represents a new source of water supply to the City of San Luis Obispo. As such, it is consistent with the City's multi-source policy for water resources and the Council's#1 Major City Goal. As a new source of water,the Nacimiento Water Supply Project will serve to enhance the reliability of the City's overall water supply picture. Nacimiento represents one of the few remaining and most important water supply opportunity for the City and other communities in San Luis Obispo County. Staff feels that the commitment by the City to the completion of the EIR is extremely important. The City of San Luis Obispo has served, and will continue to serve, a leadership role in the development of the Nacimiento Pipeline Project. As other agencies consider their continued participation in the project,the commitment of San Luis Obispo will undoubtedly be a significant consideration for those agencies. The Nacimiento project represents the best, if not only, opportunity for the City to work with the North County cities and water utilities on a truly regional water supply project. A substantial amount of effort has gone into the development of relationships, common goals, and ideas through functional working groups like the Nacimiento Participants Advisory Committee (NPAC) and the Nacimiento Cooperative Use Committee (NCUC). If the project fails to achieve EIR certification,these efforts,the City's contribution to- date of $318,758, and the moneys contributed by all other participants will truly be wasted. Completion of the EIR is critical to the future of the project as development, analysis and completion of a "project description" through the EIR process will lay to rest many of the key project issues to date such as; lake level impacts, pipeline routing, recreation plan, water quality, traffic impacts,intake location etc.. Based on the EIR work completed to date, staff still considers the Nacimiento project to be a very feasible project in that the major impacts identified thus far have been largely short term, construction related impacts which can generally be mitigated without significant expense. The 9- z Council Agenda Report-Nacimiento Project Phase II Amendment to Agreement Page 3 proposed amendment #1 being considered will actually look at alternatives which may further alleviate even some of the these construction related impacts. FISCAL IMPACT: The approved 1998-99 Budget allocates an additional$100,000 to support the proposed agreement amendment and completion of the EIR. In addition, approximately $9,950 remains from the original project budget as contingency funding for this phase,bringing the total funding available to $109,950. The County's worst-case estimate of the City's share of cost for the additional word is $112,979. Once the final participation commitments are received by the County and the proportional shares of cost are determined,staff will return to Council for consideration of the final agreement amendment and will ask for additional funding at that time, if needed. The following table illustrates the funding and cost breakdown for the EIR phase: Available Funding: Project Costs: Original Project Budget $274,723 Original Phase II Costs $264,773 Approved 1998-99 Budget $100,000 Additional Studies(worst case) $112,979 Total $3749723 Total $3779752 ALTERNATIVES: Decline participation in the completion of the EIR phase. The City could choose to refrain from participating in the additional work required to complete the EIR phase. This would likely result in the failure of the project to move forward through EIR certification. This alternative is not recommended for the reasons stated above. Certification of the Nacimiento project EIR is a significant step in achieving the City's#1 Major City Goal. Continued participation on the part of the City is critical to the progress of the project. ATTACENIENTS: Amendment to Agreement Agreement A-1 5-94-CC 1998-99 CIP Request �3 AMENDMENT No. 1 TO THE NACIMIENTO PROJECT ENGINEERING FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT REPORT PARTICIPATION AGREEMENT This AMENDMENT No. 1 executed this day of , 1998, to the AGREEMENT made by and between the San Luis Obispo County Flood Control and Water Conservation District ("District") and ("Agency") at San Luis Obispo, California on February 28, 1995. WITNESSETH: WHEREAS, District has had prepared and circulated a Draft Environmental Impact Report("DEIR")for the Nacimiento Water Supply Project ("PROJECT") in accordance with the AGREEMENT and has received comments thereto; and WHEREAS, District and Agency desire to revise and recirculate said DEIR based upon those comments received; and WHEREAS, doing so, causes expenditures to exceed the maximum amounts both stated and tabulated within the AGREEMENT; NOW, THEREFORE, in consideration of the mutual promises contained herein, District and Agency agree to amend the AGREEMENT as follows: Article 7 is hereby amended by adding the following: C. The Agency agrees to pay to District, the Agency's proportional share of all reasonable costs and expenses associated with the revised and recirculated DEIR incurred by the District under this Agreement, including District staff time and overhead, and charges billed by the District's consultants (Boyle Engineering Corporation, John Carollo Engineers and Ogden Environmental and Energy Services)for the District's Revised Feasibility/EIR Reports (estimated at an additional $360,238.00 plus a 10% contingency of $36,023.80 for a total of 9-� $396,261.80). Agency's proportional share is: Agency's requested annual allocation of PROJECT water divided by the total requested annual allocation of PROJECT water by all participating Agencies, as listed in Exhibit B attached hereto, multiplied by the estimated additional cost as shown in said Exhibit B, not to exceed $33.43 per acre-foot per year of request. IN WITNESSED WHEREOF,this AGREEMENT is hereby amended by the parties hereto, upon the date written above. SAN LUIS OBISPO COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT: Chairman of the Board of Supervisors of the County of San Luis Obispo ATTEST: County Clerk and Ex-officio Clerk of the Board of Supervisors of the County of San Luis Obispo By: - Deputy Clerk (Agency): By: Date By: Date APPROVED AS TO FORM AND LEGAL EFFECT: 9s JAMES B. LINDHOLM, JR. County Counsel By: Deputy County Counsel Dated: Draft Document for NPAC Consideration and Approval ?4 A-15-94—CC NACIMIENTO PROJECT ENGINEERING FEASIBILITY'REPORT AND ENVIRONMENTAL IMPACT REPORT PARTICIPATION AGREEMENT This Agreement between the San Luis Obispo County Flood Control and Water Conservation District ("District'), and City of San Luis Obispo ("Agency'). WITNESSETH: WHEREAS, the District, and the Monterey County Flood Control and Water Conservation District(now the Monterey County Water Resources Agency)on October 19, 1959, made and entered into an agreement which agreement assures the District a perpetual supply of 17,500 acre-feet per year of water from the Nacimiento Reservoir, and WHEREAS, of the said 17,500 acre-feet per year of District's water supply from the Nacimiento Reservoir,the District's present policy is to use, in the vicinity of the Nacimiento Reservoir, 1300 acre-feet per year, and WHEREAS, of the said 17,500 acre-feet per year of District's water supply from the Nacimiento Reservoir, theDistrict has studied the reliability and the feasibility of a project to deliver up to 16,200 acre-feet per year to communities and other users within the County of San Luis Obispo in the form of a Feasibility Study and Preliminary Evaluation ("Preliminary Evaluation') as approved by the San Luis Obispo County Flood Control and Water Conservation District Board on June 7, 1994; and WHEREAS, the District completed and considered the results of the Preliminary Evaluation, and the District has determined to proceed with additional, necessary feasibility, environmental, and engineering reviews and studies to define and undertake a Engineering Feasibility Report and an Environmental Impact Report; and 9= 7 e_i s_ot,_rr. WHEREAS, the District now intends to complete and consider the conclusions and recommendations of a Engineering Feasibility Report and Environmental Impact Report, which Reports will also address possible methods of financing a project or projects.to deliver water to participating communities; and WHEREAS, after completion of the Engineering Feasibility Report and Environmental Impact Report, the District, in the District's sole discretion, may determine to proceed with any and/or all other studies necessary to define, finance and accomplish the final design for construction and operation of a project to deliver District's Nacimiento Reservoir water to participating communities; and WHEREAS, if the District does determine to define and implement such a Nacimiento Reservoir water delivery project,said determination will not preclude evaluation and analysis by the District of alternative lead agency considerations, such as, but not limited to, a Joint Power Authority (JPA); and WHEREAS, the Agency desires to have the right to elect to participate in such a Nacimiento Reservoir water delivery project if the District, in the District's sole discretion, determines to define, design, finance, construct and operate such a project or, in the alternative, decides that a Joint Powers Authority is the appropriate agency for financing and implementing such a project, and if the District, in the District's sole discretion, determines that the participation of the Agency is consistent with the economic, environmental, operational, legal and other goals and standards of the water delivery project as it is ultimately defined in the Engineering Feasibility Report and Environmental Impact Report and other necessary studies and approved by the District; and -2- WHEREAS, the Agency*will be requested to advise the District in the District's solicitation, selection, and- overview of a responsible and qualified professional consultant(s) to undertake and complete the Engineering Feasibility Report and the Environmental Impact Report. NOW, THEREFORE, IT IS MUTUALLY AGREED by and between District and Agency as follows: 1. District shall prepare an Engineering Feasibility Report and an Environmental Impact Report (Feasibiliity/EIR Reports) for a project to deliver the District's Nacimiento Reservoir water to participating communities based on that certain "Preliminary Evaluation for the Nacimiento Water Supply Project- Phase II - Preliminary Engineering Evaluation and Environmental Assessment"("Preliminary Evaluation')provided that the Feasibiliity/EIR Reports shall be based on a delivery system utilizing the Salinas Valley Route as generally J set forth in Alternatives 1 through 4 of the Preliminary Evaluation. 2. The Agency and District agree that the District intends, and shall have the right, to enter into agreements, substantially similar to this Agreement, with other parties and agencies who desire to participate in the study of a project to deliver the District's Nacimiento Reservoir water to participating communities. 3. The Agency hereby requests that the District, in preparing the Feasibility/EIR Reports, describe the Agency's participation to be in the amount of 3380 acre-feet per year of water from the District's Nacimiento Reservoir water ("Agency Amount"), subject to the following: a. In making this request, the Agency acknowledges that the District is not bound by the Agency's request or by this Agreement to deliver or reserve for the -3- /- f Agency any particular amount of water or, any water whatsoever, from District's rights to water from the Nacimiento Reservoir in the event that the District, finds that: (1) the District will not proceed with a Nacimiento Reservoir water delivery project; or, (2) the District will proceed with a Nacimiento Reservoir water delivery project but in an amount less than 16,200 acre-feet per year. b. In making this request,the Agency acknowledges that the District has the sole and complete right to define a Nacimiento Reservoir water delivery project in a manner which the District considers to be the optimum project when the environmental, economic, engineering, operating, legal and other significant factors of such a project are considered by the District In this context, the Agency acknowledges that the District shall have the sole right to determine the extent of the Agency's participationin such a project and that the District may define such project so that the Agency's participation in the project is less than the Agency Amount set forth in Paragraph 3 above or such that the Agency will not be permitted to participate in such a project. C. The Agency also acknowledges and agrees that in the event that the District, in the District's sole discretion, determines not to proceed with a project to deliver the District's Nacimiento Reservoir water to participating communities, the Agency will not be entitled to any reimbursement of any moneys paid by the Agency to the District under this Agreement,to the extent that the District has expended or committed to spend those moneys under the terms of this Agreement. It being further understood that if there are any said .moneys paid by the Agency to the District under this Agreement which are inexpended and which are not committed to be spent at the time the District determines 1 1 - not to proceed with such a project, then said unexpended and uncommitted moneys shall be returned to the Agency by the District. 4. The District and the Agency acknowledge that the District, on June 7, 1994, completed the Preliminary Evaluation for a project to deliver the District's Nacimiento Reservoir water to participating communities in-accordance with that certain "Agreement for Professional Engineering Services for Preliminary Evaluation for a Water Distribution System for the San Luis Obispo County Flood Control and Water Conservation District', dated June 9, 1992, by and between District and Boyle Engineering Corporation. 5. The District and the Agency acknowledge that the District, in considering the results, conclusions, and recommendations of the Preliminary Evaluation has determined that the continuing participation of the Agency in the Feasibility/EIR Reports is consistent with the economic, environmental, legal, operational and other goals and standards of the f District with respect to a future project If and when the District defines a project to deliver the District's Nacimiento Reservoir water to participating communities as including participation by the Agency, the Agency shall have the right to elect to participate in such a project subject to all of the following terms and conditions: a. That the Agency shall participate in such a project in an amount defined by the District and requested by the Agency, but not more than the Agency Amount, and subject to the approval and final determination by the District. b. That the Agency is not in default as to any term or condition of this Agreement i 6. The District shall establish a Nacimiento Participants Advisory Committee (NPAC) in which the Agency shall have the right to participate and which shall be established to: a. Advise the District on the solicitation and selection of a responsible and qualified professional consultant(s) to undertake and complete the Feasibility/EIR Reports; b. Assist, review, and advise on the work being completed with the . District's consultant(s); and C. Report to the District, in a separate report, the NPAC's findings conclusions and recommendations resulting from the completion of the Feasibility/EIR Reports. 7. The Agency agrees to pay to District the Agency's share of all reasonable costs and expenses incurred by the District under this Agreement, including District staff time and overhead, for the District's Feasibility/EIR Reports. The amount that the Agency shall pay to District (the Agency's share) shall be the sum of. a. The Agency's . proportional share of the actual costs of the Feasibility/EIR Reports (estimated at $1,050,000) divided by the sum of all Agency Amounts (15,471 AF), multiplied by the Agency Amount, as shown in Exhibit A attached hereto, not to exceed $64.82 per acre-foot per year of request. b. The Agency's proportional share of the District's actual Overhead and Contingency Costs (estimated at 10%), (not exceed a combined total of 20% of the Feasibility/EIR Reports cost); estimated at $210,000 divided by the sum of all Agency. Amounts (15,471 AF), multiplied by the Agency Amount, as shown in Exhibit A attached hereto, not to exceed $12.96 per acre-foot per year of request 8. The District shall establish a reserve account from which the District shall make payments for the District's Feasibility/EIR Reports. The Agency shall,within 30 days of the execution of this Agreement by District, pay to District an initial sum representing 10% of the Agency's total share of the costs as provided for under 7a and 7b,which District shall place into the said reserve account. The District shall notify the Agency of the remaining balance and any payments due in accordance with Billing and Payment schedules as to be defined in certain Feasibility/EIR Reports contracts for such services. The District shall so notify the Agency and Agency shall within 30 days of receipt of said notice pay to District said amounts required by District. The District shall, on a quarterly basis, provide to Agency an accounting of the transactions and status of the reserve account. 9. The term of this Agreement shall be five years from the date of execution hereof, except that: a. In the event that the District determines that the District will not proceed with a project to deliver its Nacimiento Reservoir water to participating communities, the District may terminate this Agreement by giving ninety days advance written notice to Agency. b. In the event of early termination by the District of this agreement any unexpended funds provided by Agency shall be refunded to Agency. y_,3 10. Any notice or other communication required by or convenient to this Agreement may be made by first class mail addressed as follows: To DISTRICT: Attn County Engineer San Luis Obispo County Flood Control and Water Conservation District Engineering Department, Room 207 San Luis Obispo, CA 93408 Phone (805) 781-5252, Fax (805)781-1229 To AGENCY: Dan Gilmore, Utilities Director City of San Luis Obispo PO Box 8100 San Luis Obispo CA 93403 1 Executed this 27 day of February , 199 50 at San Luis Obispo, California. AGENCY: ATTEST: City ofan Lu 'Obispo Allen K. Settle, Mayor c Di Gladw 11, Ci Clerk SAN LUIS OBISPO COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT COUNTY OF SAN LUIS OBISPO By: Chairperson of the Board of Supervisors ATTEST: JULIE L. RODE VALD Clerk of the Board of Supervisors ByVa. APPROVED AS TO FORM AND LEGAL I perk JAMES B. LINDHOLM, JR. County Counsel By: I APPROVED AS TO FORM, D p. C unty Counsel Da /jJ Y n m:lcatrinaUgg\nac12-9.agr Alto y i EXHIBIT A NACIMIENTO PARTICIPATION AGREEMENT ESTIMATE OF COSTS TO PARTICIPATE IN ENGINEERING FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT REPORT (FEASIBILITY/EIR REPORTS) Agency Agency Agency Agency Share Agency' Amount Share of of Overhead/ Total Cost AFY Feasibility/ Contingencies $ EIR Reports at 20% max. 1. Afuera de Chorro Mutual Water Co 32 2,074.24 414.72 2,488.96 2. Atascadero Mutual Water Company 3000 194,460.00 38,880.00 233.340.00 3. Cal Cities/Los Osos 300 19,446.00 3,888.00 23,334.00 4. Cat Cities/Edna Valley 50 3,241.00 648.00 3,889.00 5. City of EI Paso de Robles 4000 259,280.00 51,840.00 311,120.00 6. City of San Luis Obispo 3380 219,091.60 43,804.80 262,896.40 7. County Service Area No. 9A Los Osos 300 19,446.00 31888.00 23,334.00 8. County Service Area No. 10A Cayucos 80 5,185.60 1,036.80 6,222.40 9. CSA No.22 Property Owners 890 57,689.80 11,534.40 69,224.20 10. East Airport Mutual Water Company 80 5,185.60 1,036.80 6,222.40 11. Edna Valley Mutual Water Company 955 61,903.10 12,376.80 74,279.90 12. Fiero Lane Water Company 100 6,482.00 1,29.6.00 7,778.00 13. Morro Rock Mutual Water Company 44 2,852.08 570.24 3,422.32 14. Paso Robles Beach Water Association 30 1,944.60 388.80 2,333.40 16. San Luis Coastal Unified School District 55 3,565.10 712.80 4,277.90 16. Santa MargaritaRanch Mutual Water Co. 600 38,892.00 7,776.00 46,668.00 17. Templeton Community Services District 1475 95,609.50 19,116.00 114,725.50 18. Waterworks Dist No. 6/Santa Margarita 100 6,482.00 1,296.00 7,778.00 19. San Luis Obispo County Flood Control 47,169.78 9,495.84 56,665.62 and Water Conservation District Total 1 15471 1,050,000.00 210,000.00 1,260,000.00 ' AGENCY TOTAL COST The Agency's proportional share of the Feasibility/EIR Report costs which equal the quotient of $1,260,000' divided by the sum of all Agency amounts multiplied by the Agency amount not to exceed $77.78 per acre-foot per year of requested amount. 9- 10 1997-99 Financial . an Supplement: 1998-99 Bu%.jet CAPITAL IMPROVEMENT PLAN PROGRAM: Water Source of Supply REQUEST TITLE: Nacimiento Water Supply Project- EIR Phase Additional Studies Project Summary The Nacimiento Water Supply Project is a County project with the purpose of designing and constructing conveyance facilities to bring water from Lake Nacimiento to several project participants from Paso Robles to south of the City of San Luis Obispo. Public comments to the Draft Environmental Impact Report (DEIR) will require certain changes to be made to the project and a revised DEIR will need to be prepared. The City's share of the costs to complete the EIR are estimated to be$83,325. This request is to add an additional$100,000 to the project budget to complete the EIR phase and to cover any additional unforeseen costs. Project Objectives ■ Manage the efforts of project consultants ■ Perform engineering support for development of certifiable EIR ■ Perform additional environmental studies in response to public comments ■ Prepare final EIR for certification by the Board of Supervisors Existing Situation The original funding amount identified in the 199495 Budget (page 23 of the Capital Improvement Plan) was $439,862. That amount was based on an allocation request of 5,115 acre-feet per year(afy). Since that time,the City has reduced its allocation request to 3,380 afy. Since the City's share of the project costs is proportional to our requested allocation,the actual cost to the City for the EIR phase was less, and a portion of the project budget was returned to Fund Balance. To date,the City has actually contributed a total of$318,758 towards the project's preliminary studies, preliminary engineering, and preparation of the EIR. All of the project participants are being asked to provide their share of the additional costs to perform the supplemental studies and to complete the EIR. Goal and Policy Links ■ The acquisition of a long term supplemental water supply is the primary Major City Goal ■ This project is necessary to meet the water supply needs identified in the General Plan for build-out ■ Several previous Council actions approving participation in the project ■ San Luis Obispo County Master Water Plan Update,March 1986 ■ Urban Water Management Plan Project Work Completed The project consultant team has performed numerous studies and prepared several reports, including; the initial Feasibility Study, the Reliability Assessment, the Preliminary Engineering Evaluation and Environmental Assessment, the EIR Phase Engineering Report, a financial alternatives study, and the Draft Environmental Impact Report. There has also been a debt capacity review performed for the County, and a revision to State law was passed in the State Legislature (AB1460) which allows for the simultaneous use of the reservoir for bod recreational and domestic purposes. 48 74 Nacimiento Water Supply Project-EIR Phase Additional Studies Environmental Review This request is to fund completion of the environmental review process for this project. Other Special Review Considerations The impacts and benefits of this project are extremely far reaching. The City of San Luis Obispo is one of three major participants. All participants are dependent on each other for continued participation in the project if successful completion is to be achieved. Project Phasing and Funding Sources The project is proceeding in three major phases. Phase I was completed in February of 1994, and included various preliminary analyses and assessments. Phase II,the current phase associated with this request, includes the preparation of the EIR. A substantial amount of engineering is included in Phase II in order to define the project with sufficient detail to yield an adequate and legally defensible EIR. The last phase will include final engineering design and construction. Ongoing operations and maintenance of the project, along with the costs for final design and construction,will all be combined into the unit cost for the water. The expected cost for raw Nacimiento water delivered to the City is approximately$800 per acre-foot. The costs shown below reflect only the City's proportionate share of the total project cost in each category: Project Costs by Type Project Costs To-Date 1998-99 1999-00 2000-01 2001-02 Total Preliminary Studies(Phase I) $55,900 $55,900 EIR Preparation(Phase II) $262,900 $100,000 $362,900 Final Design/Construction(Phase III) ' Total $318,800 $100,000 $418,800 * Phase 111 costs for final design, construction, and other associated costs will be combined into the per acre-foot cost for Nacimiento water. The annual cost for Nacimiento water will be the City's proportionate share of the debt service required to fund the actual costs for Phase 111. At present, staffs best guess at these annual costs would be 58001af multiplied by our current allocation request of 3380af, or S2,704,000.. The funding for Phases I and II of the Nacimiento Water Supply Project has come entirely from the Water Fund. Phase III is likely to be entirely debt financed, with the debt service being a component of the unit cost for Nacimiento water. As most of this cost is fixed (each agency must pay whether they take the water or not), the City staff intends to use all of our entitlement to Nacimiento water first, leaving as much water as possible in Salinas and Whale Rock Reservoirs to maximize reliability. Current estimates indicate the annual cost for Nacimiento water to be around $2,704,000. This cost for Nacimiento water will be paid for out of the Water Fund, and has been`included in the Utilities Department water rate analysis and projections. 49 ���a