Loading...
HomeMy WebLinkAbout11/21/2000, C7 - APPROVE FUNDING TO CONTINUE A TEMPORARY POSITION IN THE FIRE DEPARTMENT. A] council M.°°,,;w, Z,_ �� AgcnbA uEpont C I T Y OF SAN L U IS O B I S P O FROM: Robert F. Neumann Prepared By: Darren Drake, Fire Marshal Viv R. Dilts, Management Assistant SUBJECT: APPROVE FUNDING TO CONTINUE A TEMPORARY POSITION IN THE FIRE DEPARTMENT. CAO RECOMMENDATION Appropriate $17,000 from the unreserved General Fund balance to continue funding a temporary position in the Fire Department's Hazardous Materials Program. DISCUSSION Background The Fire Department has actively been involved in Hazardous Materials Programs since the mid-80's. At that time a full-time position and a half-time secretary were needed to oversee the Underground Fuel Tank Program and manage the clean-up of contaminated sites. In the early 1990's downsizing resulted in the loss of the Hazardous Materials Coordinator position and the secretary. Their duties and responsibilities were then reassigned and absorbed by other members of the Fire Prevention Bureau. In 1996, the City Council requested that the California Environmental Protection Agency approve the Fire Department's status as Participating Agency (PA) under the San Luis Obispo County Certified Unified Program Agency (CUPA). With this approval, the Fire Department, the Utilities Department and the County Health Agency now act in a"unified format" to manage and implement the following six hazardous materials programs. • Underground Storage Tank Program • CalARP (California Accidental Release • Hazardous Materials Business Plan Prevention Program) Program • Uniform Fire Code, Article 80, Haz. Mat. • Above Ground Storage Tank Program Inventory Reporting Program • Waste Generator Program In November of 1999, the employee assigned to these duties left for another position. While recruiting for the vacancy, the Department hired a temporary employee to carry on with the workload. Staff was fortunate in hiring a temporary employee who was uniquely qualified and whose performance has exceeded our expectations. The new coordinator's position was filled in June of 1999. To assist with the transition and based on the size of the workload, the temporary employee continued to work. C7-1 Council Agenda Report—Funding for Temporary Salaries Page 2 Current Situation Even with the assistance of this temporary employee, staff has fallen behind in implementing the new CUPA program. There are a number of reasons for this. Staff initially underestimated the complexities of the program. A new State mandated software conversion of our existing database has taken longer than expected. In addition we have had to adjust work-loads so as to accommodate the cleaning of a number of severely contaminated properties: Santa Barbara Avenue transit center, John's Battery on Match Street, and railroad right-of-way at Roundhouse. We are requesting additional funding to maintain the support of the temporary employee. We have now reached a critical point in our program development. Considerable time and energy has gone into developing the infrastructure of this program, i.e. staff training, software implementation, and hiring of a qualified program manager. By losing this temporary position, we will lose our momentum and will jeopardize the effectiveness of the program. At risk will be the following: 1. Keeping up with upgrades and alterations to existing service stations 2. Complying with new State mandates for aboveground storage tanks 3. Fully implementing hazardous materials management software 4. Timely inspection of new facilities and assessment of newly annexed properties 5. Quality and accuracy of consolidated fee collection Should we not be successful with this request, staff will be compelled to reassign other personnel to assist in the program duties. Subsequently, we will see a reduction in service levels in our other community programs. The most apparent reduction will be in new construction inspection services and complaint investigations. Staff, over the next six months, will evaluate current and predicted workload. This is especially important given that the recent annexations in the airport area have yet to be absorbed into the current workload. Staff will return to Council either through the budget process or when Council considers the area airport specific plan,with a recommendation for staffing of the program. CONCURRENCES The Finance Director, Utilities Director, and the Human Resources Director concur with this recommendation. FISCAL IMPACT We have exhausted every possible funding source, including salary savings, to continue this temporary position until the end of the fiscal year. We have approached the Utilities Department for funding and been advised that no funds are available. C7-2 Council Agenda Report—Funding for Temporary Salaries Page 3 In order to fund the position until the end of this fiscal year, an additional $17,000 will be required as noted below. Over-Budget as of 11//6/00 (2,700.00) Salary Savings 8,000.00 Temporary Position Cost Until 6/30/00 (22,300.00) Need until the end of FY 2000-01 (17,000.00) Two issues of note: 1. Salary savings: in FY 2000-01, the Haz. Mat. Coordinator's position was funded at top step. Salary savings result from the difference between the top-step funded position and the new employee placed at a lower step. 2. Because of the expertise and education required, the temporary position is funded at $15.00/hr. It should be noted that as a result of the DMG Cost of Recovery Study, the CUPA program will bring in an additional $40,000 yearly in revenue to the City. Based on the 1999-01 Financial Plan Supplement, Council-approved changes since then, and interim year-end results for 1999-01, this request will result in an ending fund balance that is 22.1% of operating expenditures compared with our policy minimum of 20%. C7-3