HomeMy WebLinkAbout01/09/2001, 2 - AN ORDINANCE ADDING CHAPTER 8.05 TO THE CITY OF SAN LUIS OBISPO MUNICIPAL CODE REQUIRING CONSTRUCTION AND DEMOLITION DEBRIS REUSE AND/OR RECYCLING.council acEnaa REpont MmEw D� January 9, 2001 J® H.�bw 2 C I T Y OF S A N L U I S O B I S P O FROM: John Moss, Utilities Director (,Y� Prepared By: Ron Munds, Utilities Conservation Coordinatok ; -11 SUBJECT: An Ordinance Adding Chapter 8.05 to the City of San Luis Obispo Municipal Code Requiring Construction and Demolition Debris Reuse and/or Recycling. CAO RECOMMENDATIONS: Introduce to print an ordinance adding Chapter 8.05 to the City of San Luis Obispo's Municipal Code requiring a mandatory construction and demolition debris recycling program. DISCUSSION Background California state law (AB 939) requires every county and city reduce the amount of waste going to the landfill by 50% by the end of the year 2000. During the past decade, the City has implemented an array of programs to accomplish this goal. The last major portion of the City's waste stream needing to be evaluated for diversion from the landfill is construction and demolition (C&D) debris. The City's Source Reduction and Recycling Element, adopted in 1994, identifies C &D recycling as an essential program to reach the 50% diversion mandate. C&D material makes up about 28% of the City's overall waste stream. Though not all this waste is recyclable for various reasons, by establishing a C &D recycling program, the City will ensure that material that is recyclable is being diverted from the landfill. Since 1998, the City's waste diversion has been grouped with the member agencies of the San Luis Obispo County Integrated Waste Management Authority (IWMA) when reporting to the State our progress towards the 50% diversion requirement. For the calendar year 1999, the region was at 51% diversion rate. Although the year 2000 actual diversion rate will not be known until around the middle of 2001 (because the population and economic figures needed to calculate diversion are not available until that time), the preliminary information indicates that the region may or may not reach the 50% goal. The uncertainty is mainly due to the increase in the amount of C&D material being generated and landfilled attributed to the strong economy. If the region does not reach the 50% diversion mandate, it is imperative that the City demonstrate a "good faith effort" in attempting to reach the goal to avoid possible fines or other enforcement action. Ordinance Development Process The IWMA contracted with Stephen McGrath and Associates (SMA) to research and develop a model C&D ordinance. The intent of the model ordinance was to more or less standardize, for the building community, the procedures for recycling or reusing C &D material throughout the -1 Council Agenda Report --C &D Recycling Ordinance Page 2 county. It is the hope of the IWMA that each member city and the county will adopt their own version of the ordinance. SMA surveyed several jurisdictions throughout the State to arrive at the initial draft of the ordinance. The IWMA then solicited comments from the building industry on the draft ordinance. Surprisingly, comments were, for the most part, positive with the general feeling that a majority of contractors already recycle a bulk of the waste material they produce for economic reasons. Additionally, the IWMA and City staff met with the three of the four roll -off companies that service the county south of Cuesta Grade. From their perspective, the 50% diversion goal is realistic and obtainable. Next the IWMA, City staff and SMA modified the initial draft to reflect the local conditions and input from the building industry and roll -off companies to arrive at a final draft ordinance. This draft was then sent to each city and the county for their consideration to adopt. The ordinance being considered for adoption by the City has been slightly modified after input from the City Attorney's Office and the Community Development Department. Construction and Demolition Debris Ordinance Summary Administration The Utilities Conservation Office will have the primary responsibility for the implementation and tracking of the C&D Recycling/Reuse Program. Applicants will be given the program's information as part of the planning process in the Community Development Department. All other contacts for the program's procedures and guidelines will be through the Utilities Conservation Office. A waste diversion tracking mechanism is being developed in order to quantify the results of the recycling/reuse requirements. Procedures Projects that must submit a recycling plan are developments with a ascribed valuation of $50,000 or more, and all demolition projects having a total footage of more than 1,000 square feet. The procedures were developed to minimize the impacts to the applicants. A simple recycling plan form has been developed along with a guide which will assist the building industry to estimate the amount of waste their project will generate (Attachment 2). The applicant will fill out the form and submit it to the Utilities Conservation Coordinator for review. The plan will then either be: • Approved which allows for a building or demolition permit to be issued; • Denied which no building or demolition permit can be issued; or • Returned to the applicant if the Utilities Conservation Coordinator determines that additional information is needed to make a decision as to its adequacy. Council Agenda Report—C&D Recycling Ordinance At the end of the project the applicant returns the form with the appropriate documentation. The Utilities Conservation Coordinator will then determine whether the applicant has complied with the diversion requirements, as follows: • Full compliance if the applicant has fully complied to the diversion requirements applicable to the project; • Substantial compliance if the applicant made a good faith effort to comply but for an unforeseen reason could not fully comply; and Noncompliance if the applicant is not in substantial compliance or fails to submit the required documentation. If it is determined that an applicant is in noncompliance, a civil penalty in an amount calculated as two percent of the total project valuation will be assessed. Additionally, the certificate of occupancy may not be issued until the penalty is paid. Other Provisions The ordinance does provide exemptions or exceptions to the 50% diversion rate. If an applicant can provide information which supports their assertion that a 50% diversion rate is not feasible, the Utilities Conservation Coordinator can grant a lower diversion rate for a project. If an applicant is not satisfied with any decision made by the Utilities Conservation Coordinator whether it is for noncompliance or the granting of an exemption, the applicant can appeal to the Utilities Director whose decision will be final. CONCURRENCE The Community Development Department concurs with the recommendations made in this report. Additionally, as previously indicated in the report, a majority of the respondents to the draft ordinance from the building and construction waste management industries concur that the 50% recycling/reuse goal is reasonable and can be obtained. FISCAL IMPACT No additional funding will be required to implement the recommendations made in this report. Utilities Conservation Office staffing is adequate to implement the program and the increased workload. The existing Utilities Conservation Office budget is adequate to fund any incidental printing costs associated with the necessary forms and information. ATTACHMENTS Attachment 1- Ordinance Attachment 2- Recycling Plan Form and Information a -� J Attachment 1 _ I ORDINANCE N0. (2001 Series) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, ADDING CHAPTER 8.05 TO THE CITY OF SAN LUIS OBISPO'S MUNICIPAL CODE REQUIRING A MANDATORY CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING PROGRAM. WHEREAS, AB 939 (California Integrated Waste Management Act) requires that each local jurisdiction in the State divert 50% of discarded materials (base year 1990, state methodology) from landfills by December 31, 2000; and WHEREAS, every city and county in California could face fines up to $10,000 a day for not meeting the above mandated goal; and WHEREAS, reusing and recycling Construction and Demolition (C &D) debris is essential to further the City's efforts to reduce waste and comply with AB 939 goals; and WHEREAS, it is feasible to divert an average of at least fifty (50) percent of all C &D debris from construction, demolition, and renovation projects, except in unusual circumstances; and WHEREAS, to ensure compliance with this Article and to ensure that those contractors that comply with this Article are not placed at a competitive disadvantage, it is necessary to impose a civil penalty for noncompliance of this Article. BE IT ORDAINED by the Council of the City of San Luis Obispo as follows: SECTION 1. Chapter 8.05 is added to the San Luis Obispo Municipal Code to read as follows: 8.05.010 DEFINITIONS A. "Applicant" means any individual, firm, limited liability company, association, partnership, political subdivision, government agency, municipality, industry, public or private corporation, or any other entity whatsoever who applies to the City for the applicable permits to undertake any construction, demolition, or renovation project within the City, unless otherwise specifically exempted by law. B. "Compliance Official" means the Utilities Conservation Coordinator or his /her designee. C. "Construction" means the building of any structure or any portion thereof including any tenant improvements to an existing facility or structure. Attachment 1 — ot ORDINANCE NO. (2001 Series) PAGE 2 D. "Construction and Demolition Debris" means used or discarded materials removed from premises during construction or renovation of a structure resulting from construction, remodeling, repair, or demolition operations on any pavement, house, commercial building, or other structure. E. "Conversion Rate" means the rate set forth in the standardized Conversion Rate Table approved by the City pursuant to this Article for use in estimating the volume or weight of materials identified in a RECYCLING PLAN. F. "Covered Project" shall have the meaning set forth in 8.05.020 (A) of this Article. G. "Deconstruction" means the systematic removal of usage items from a structure. H. "Demolition" means the decimating, razing, ruining, tearing down or wrecking of any facility, structure, pavement or building, whether in whole or in part, whether interior or exterior. I. "Divert" means to use material for any purpose other than disposal in a landfill. J. "Diversion Requirement' means the diversion of at least fifty (50) percent by weight of the total Construction and Demolition Debris generated by a Project via reuse or recycling, unless the Applicant has been granted an Infeasible Exemption pursuant to 8.05.060 of this Ordinance, in which case the Diversion Requirement shall be the maximum feasible diversion rate established by the RECYCLING PLAN Compliance Official for the Project. K. "Noncovered Project' shall have the meaning set forth in 8.05.020 (C) of this Article. L. "Project" means any activity which requires an application for a building or demolition permit or any similar permit from the City. M. "Renovation" means any change, addition, or modification in an existing structure. N. "Reuse" means further or repeated use of Construction or Demolition Debris. O. "Salvage" means the controlled removal of Construction or Demolition Debris from a permitted building or demolition site for the purpose of recycling, reuse or storage for later recycling or reuse. Attachment 1 — 3 ORDINANCE N0. (2001 Series) PAGE 3 P. "RECYCLING PLAN" means a completed RECYCLING PLAN form, approved by the City for the purpose of compliance with this Article, submitted by the Applicant for any Covered or Noncovered Project. Q. "RECYCLING PLAN Compliance Official" means the designated staff person(s) authorized and responsible for implementing this Article. 8.05.020 THRESHOLD FOR COVERED PROJECTS A. Covered Projects: All construction and renovation projects within the City, the valuation of which are, or are projected to be, greater than or equal to $50,000 ('Covered Projects'), shall comply with this Ordinance. The cost of the project shall be the valuation ascribed to the project by the Building Division. In addition, all demolition projects having a total footage of more than 1,000 square feet shall be a Covered Project. Failure to comply with any of the terms of this Ordinance shall subject the Project Applicant to the full range of enforcement mechanisms set forth in 8.05.050 (C) (3) and 8.05.060 below. B. City- Sponsored Projects: All City- sponsored construction and renovation projects within the City, the costs of which are, or are projected to be, greater than or equal to $50,000 ('Covered Projects') shall comply with the ordinance. The cost of the project shall be the valuation attributed to the permit issued by the Building Department. In addition, all demolition projects having a total square footage of more than 1,000 shall be a Covered Project. These City - sponsored Covered Projects shall submit a RECYCLING PLAN to the Compliance Official prior to beginning any construction or demolition activities and shall be subject to all applicable provisions of Ordinance with the exception of 8.05.050 (C) (3). C. Non - covered Projects: Applicants for construction, demolition, and renovation projects within the City whose permit valuations are less than $50,000 ('Non- covered Projects') shall be encouraged to divert at least fifty (50) percent of all project - related construction and demolition debris. D. Compliance as a Condition of Approval: Compliance with the provisions of this Ordinance shall be listed as a condition of approval on any building or demolition permit issued for a Covered Project. 8.05.030 SUBMISSION OF RECYCLING PLAN A. RECYCLING PLAN Forms: Applicants for building or demolition permits involving any Covered Project shall complete and submit a RECYCLING PLAN on a RECYCLING PLAN form approved by the City for this purpose as part of the application packet for the building or demolition permit. The completed RECYCLING PLAN shall indicate all of the following: oq-q 0 Attachment 1 — y ORDINANCE NO. (2001 Series) PAGE 4 1. The estimated volume or weight of project Construction and Demolition debris, by materials type, to be generated; 2. The maximum volume or weight of such materials that can feasibly be diverted via reuse or recycling; 3. The vendor or facility that the Applicant proposes to use to collect or receive that material; and 4. The estimated volume or weight of Construction and Demolition debris that will be landfilled. B. Calculating Volume and Weight of Debris: In estimating the volume or weight of materials identified in the RECYCLING PLAN, the Applicant shall use the standardized Conversion Rates approved by the City for this purpose. C. Deconstruction: In preparing the RECYCLING PLAN, applicants for building or demolition permits involving the removal of all or part of an existing structure.shall deconstruct, to the maximum extent feasible, and shall make the materials generated thereby available for salvage. 8.05.040 REVIEW OF RECYCLING PLAN A. Approval: Notwithstanding any other provision of this Code, no building or demolition permit shall be issued for any Covered Project unless and until the RECYCLING PLAN Compliance Official has approved the RECYCLING PLAN. Approval shall not be required, however, where an emergency demolition is required to protect the public health, welfare or safety as determined by the Chief Building Official. The RECYCLING PLAN compliance Official shall only approve a RECYCLING PLAN if he or she first determines that all of the following conditions have been met: 1. The RECYCLING PLAN provides all of the information set forth in 8.05.030 (A) of this Ordinance; and 2. The RECYCLING PLAN indicates that at least fifty (50) percent by weight of all Construction and Demolition debris generated by the Project will be diverted. If the RECYCLING PLAN Compliance Official determines that these conditions have been met, he or she shall mark the RECYCLING PLAN `Approved', return a copy of the RECYCLING PLAN to the Applicant, and notify the Building Department that the RECYCLING PLAN has been approved. Attachment I — 5 ORDINANCE NO. (2001 Series) PAGE 5 B. Non - approval: If the RECYCLING PLAN Compliance Official determines that the RECYCLING PLAN is incomplete or fails to indicate that at least fifty (50) percent by weight of all Construction and Demolition debris generated by the Project will be reused or recycled,,he or she shall either: 1. Return the RECYCLING PLAN to the Applicant marked 'Denied', including a statement of reasons, and so notify the Building Department; or 2. Return the RECYCLING PLAN to the Applicant marked 'Further Explanation Required'. 8.05.050 COMPLIANCE WITH RECYCLING PLAN A. Documentation: Prior to receiving a Certificate of Occupancy for the project, the Applicant shall submit to the RECYCLING PLAN Compliance Official documentation that the Diversion Requirement for the Project has been met. The Diversion Requirement shall be that the Applicant has diverted at least fifty (50) percent of the total Construction and Demolition debris generated by the Project via reuse or recycling, unless the Applicant has been granted an Impossibility Exemption pursuant to 8.05.060 of this Ordinance, in which case the Diversion Requirement shall be the maximum feasible diversion rate established by the RECYCLING PLAN Compliance Official for the Project. This documentation shall include all of the following: 1. Receipts from the vendor or facility which collected or received each material showing the actual weight or volume of that material; 2. A copy of the previously approved RECYCLING PLAN for the Project adding the actual volume or weight of each material diverted and landfilled; 3. Any additional information the Applicant believes is relevant to determining its efforts to comply in good faith with this Ordinance. B. Weighing of Wastes: Applicants shall make reasonable efforts to ensure that all Construction and Demolition debris diverted or landfilled are measured and recorded using the most accurate method of measurement available. To the extent practical, all Construction and Demolition debris shall be weighed by measurement on scales. Such scales shall be in compliance with all regulatory requirements for accuracy and maintenance. For Construction and Demolition debris for which weighing is not practical due to small size or other considerations, a volumetric measurement shall be used. For conversion of volumetric measurements to weight, the Applicant shall use the standardized Conversion Rates approved by the City for this purpose. Attachment 1 — to ORDINANCE NO. (2001 Series) PAGE 6 C. Determination of Compliance: The RECYCLING PLAN Compliance Official shall review the information submitted under 8.05.050 (A) and determine whether the Applicant has complied with the Diversion Requirement, as follows: 1. Full Compliance: If the RECYCLING PLAN Compliance Official determines that the Applicant has fully complied with the Diversion Requirements applicable to the Project, he or she shall approve the RECYCLING PLAN and inform the Building Division that a Certificate of Occupancy can be issued. 2. Substantial Compliance: If the RECYCLING PLAN Compliance Official determines that the Diversion Requirement has not been achieved, he or she shall determine on a case -by -case basis whether the Applicant has made a good faith effort and is in substantial compliance with this Ordinance. In making this determination, the RECYCLING PLAN Compliance Official shall consider the availability of markets for the Construction and Demolition debris landfilled, the size of the Project, and the documented efforts of the Applicant to divert Construction and Demolition debris. If the RECYCLING PLAN Compliance Official determines that the Applicant has made a good faith effort to comply with this Ordinance and is in substantial compliance, he or she shall approve the RECYCLING PLAN and inform the Building Division that a Certificate of Occupancy can be issued. 3. Noncompliance: If the RECYCLING PLAN Compliance Official determines that the Applicant is not in substantial compliance with this ordinance, or if the Applicant fails to submit the documentation required by 8.05.050 (A), then the applicant shall pay a civil penalty as prescribed in 8.05.080. D. Falsification of Records: If the Applicant deliberately provides false or misleading data to the City in violation of this Ordinance, the Applicant may be subject to penalties in addition to those specified in 8.05.080. In any civil enforcement action, administrative or judicial, the City shall be entitled to recover its attorneys' fees and costs from an Applicant who is determined by a court of competent jurisdiction to have violated this Ordinance. E. Final Approval: All conditions of this Ordinance shall be met prior to final approval by the Building Division. 8.05.060 INFEASIBLE EXEMPTION A. Application: If an Applicant for a Covered Project experiences unique circumstances that the Applicant believes make it infeasible to comply with the Diversion Requirement, the Applicant may apply for an exemption at the time that Attachment i — 7 ORDINANCE NO. (2001 Series) PAGE 7 he or she submits the RECYCLING PLAN required under 8.05.030 (A) of this Ordinance. The Applicant shall indicate on the RECYCLING PLAN the maximum rate of diversion he or she believes is feasible for each material and the specific circumstances that he or she believes make it infeasible to comply with the Diversion Requirement. B: Meeting with RECYCYLING PLAN Compliance Official: The RECYCLING PLAN Compliance Official shall review the information supplied by the Applicant and may meet with the Applicant to discuss possible ways of meeting the Diversion Requirement. The RECYCLING PLAN Compliance Official may request that staff from the San Luis Obispo County Integrated Waste Management Authority or designee attend this meeting or may require the Applicant to request a separate meeting with San Luis Obispo County Integrated Waste Management Authority staff. Based on the information supplied by the Applicant and, if applicable, San Luis Obispo County Integrated Waste Management Authority staff or designee, the RECYCLING PLAN Compliance Official shall determine whether it is possible for the Applicant to meet the Diversion Requirement. C. Granting of Exemption: If the RECYCLING plan Compliance Official determines that it is infeasible for the Applicant to meet the Diversion Requirement due to unique circumstances, he or she shall determine the maximum feasible diversion rate for each material and shall indicate this rate on the RECYCLING PLAN submitted by the Applicant. The RECYCLING PLAN Compliance Official shall return a copy of the RECYCLING PLAN to the Applicant marked 'Approved for Infeasible Exemption' and shall notify the Building Division that the RECYCLING PLAN has been approved. D. Denial of Exemption: If the RECYCLING PLAN Compliance Official determines that it is possible for the Applicant to meet the Diversion Requirement, he or she shall so inform the Applicant in writing. The Applicant shall have 30 days to resubmit a RECYCLING PLAN form in full compliance with 8.05.030 (A) of this Ordinance. If the Applicant fails to resubmit the RECYCLING PLAN, or if the resubmitted RECYCLING PLAN does not comply with 8.05.030 (A) of this Ordinance, the RECYCLING PLAN Compliance Official shall deny the RECYCLING PLAN in accordance with 8.05.040 (B) of this Ordinance. 8.05.070 APPEALS A. Contents of Appeals: An appeal of the Recycling Plan Compliance Official decision may be made to the Utilities Director in writing not longer that ten (10) days after the Compliance Official's decision. The decision of the Utilities Director shall be final. The appellant must specifically state in the notice of appeal: Attachment i — 8 ORDINANCE NO. (2001 Series) PAGE 8 1. The name and address of the appellant and appellant's interest in the decision; 2. The nature of the decision appealed from and /or the conditions appealed from; 3. A clear, complete, but brief statement of the reasons why, in the opinion of the appellant, the decision or the conditions imposed were unjustified or inappropriate; and 4. The specific facts of the matter in sufficient detail to notify the City. The appeal shall not be stated in generalities. B. Acceptance of Appeal: An appeal shall not be accepted by the Utilities Director unless it is complete. 8.05.080 CIVIL PENALTIES A. Civil Penaltv: If the RECYCLING PLAN Compliance Official, or on upon appeal, the Utilities Director determines that an Applicant is in noncompliance as described in 8.05.050 (C) (3), the Applicant shall pay a civil penalty in the amount calculated as two (2) percent of the total Project valuation. Until the civil penalty is paid, a Certificate of Occupancy may be withheld by the Building Division. B. Enforcement: The City Attomey is authorized to bring a civil action in any court of competent jurisdiction to recover such civil penalties for the City of San Luis Obispo. SECTION 2. SEVERABILITY If any subdivision, paragraph, sentence, clause, or phrase of the this ordinance is, for any reason, held to be invalid or unenforceable by a court of competent jurisdiction, such invalidity or unenforceability shall not affect the validity or enforcement of the remaining portions of this ordinance, or any other provisions of the City's rules and regulations. It is the City's express intent that each remaining portion would have been adopted irrespective of the fact that any one or more subdivisions, paragraphs, sentences, clauses, or phrases be declared invalid or unenforceable. SECTION 3. A summary of this ordinance, approved by the City Attorney, together with the names of the Council members voting for and against it, shall be published at least five days prior to its final passage, in the Tribune, a newspaper published and circulated in this City. This ordinance will go into effect at the expiration of thirty (30) days after its final passage. Attachment 1 — q ORDINANCE NO. (2001 Series) PAGE 9 Introduced on the day of AND FINALLY ADOPTED by the Council of the City of San Luis Obispo on the day of 2001, on the following roll call vote: AYES: NOES: ABSENT: Mayor Allen Settle ATTEST: Lee Price, City Clerk APPROVED AS TO FORM: Jeffrey Jorgensen, City Attorney 2001 �► -1'a Attachment 2 — The Construction and Demolition (C &D) Recycling Plan and Disposal Report is intended, in conjunction with this resource guide, to assist you in attaining the maximum effective and practical recycling on the job site. If budget were no concern, and time were unlimited, in excess of 90% of the material commonly considered waste on the job site, could be recycled. The goal in this C &D Recycling Plan, is to attain 50% recycling or reuse. The key, when separating materials for recycling, is to avoid cross - contamination: styrofoam with the cardboard, metals with the wood, inerts with the metals. By avoiding these simple mistakes, the contractor can save money and landfill space. Mixed Waste: This includes all waste that cannot be recycled, trash and garbage. This material will under usual circumstances, go to the landfill Chicago Grade Homestead Road, Atascadero 466 -2985 Cold Canyon Edna Road, San Luis Obispo 549 -8332 Paso Robles Landfill H'way 46, Paso Robles 238 -2028 Land Clearing / Green Waste: This includes any grubbing, soils export, trees and vegetation. Chicago Grade Homestead Road, Atascadero 466 -2985 Cold Canyon Edna Road, San Luis Obispo 549 -8332 HSS 1850 W. Betteravia, S'ta Maria 922 -2121 Rossi Transport Rossi Road, Templeton 434 -2884 Inerts: This includes concrete, asphalt, masonry and tile scrap, stucco fall, grout Gator Crushing H'Way 1, Nipomo 995 -1097 Hanson Aggregates Santa Margarita 438 -5778 Troesh Ready Mix 2280 Hutton Road, Nipomo 928 -3764 Drywall: Used drywall, from remodeling and demolition projects, should be considered 'mixed waste', as it cannot be recycled. Clean drywall scrap can technically be easily recycled, and often is. However, at this time there are no facilities within an economical distance from the Central Coast that offer this service. Metals: Ferrous: this is all iron based metals — steel, black and galvanized pipe, duct work, rebar, flashings. A -1 Metals 5795 Stockdale Rd, Paso Robles 238 -3545 Auto Parts Recyclers Duncan Lane, San Luis Obispo 543 -1215 Bedford Enterprises 1498 S Black Road, Santa Maria 922 -4977 Hellmann Salvage 6450 Rocky Canyon Road, Atascadero 466 -4893 Attachment 2 — Z Non - ferrous: copper, aluminum A -1 Metals 5795 Stockdale Rd, Paso Robles 238 -3545 Auto Parts Recyclers Duncan Lane, San Luis Obispo 543 -1215 Bedford Enterprises 1498 S Black Road, Santa Maria 922 -4977 Heilmann Salvage 6450 Rocky Canyon Road, Atascadero 466 -4893 RALCCO Hiway 1, Nipomo 343 -2289 Lumber: Only clean, unpainted, untreated lumber can be chipped and used as mulch or feedstock for a composting operation. Treated lumber should never be included in a designated wood load. Treated and painted lumber should be considered mixed waste, and landfilled. Chicago Grade Homestead Road, Atascadero 466 -2985 Cold Canyon Edna Road, San Luis Obispo 549 -8332 HSS 1850 W. Betteravia, S'ta Maria 922 -2121 Rossi Transport Rossi Road, Templeton 434 -2884 Cardboard: One of the most commonly recycled materials in households and businesses, cardboard is possibly the most expensive material to throw away on a job site due to its low weight to volume ratio, and the fact that often boxes will end up in the drop box unflattened, and consuming a disproportionate amount of space. HSS 1850 W. Betteravia, S'ta Maria 922 -2121 Paso Robles Waste 2951 Wallace Dr, Paso Robles 238 -2381 RALCCO Hiway 1, Nipomo 343 -2289 SLOCO Recycles 543 -0875 To assist in estimating, the following is provided as a guide: New construction generates approximately 8 pounds per square foot of debris Remodeling generates approximately 40 pounds per square foot of debris Demolition generates approximately 70 pounds per square foot of debris Demolition, incl. the foundation generates approx. 100 pounds per square foot of debris Mixed waste weighs approximately 350 Ibs/cubic yard, or 5.7 c.y/ton Inerts weigh approximately 1400 Ibs/cubic yard, or 1.4 c.y/ton Drywall weighs approximately 500 Ibs/cubic yard, or 4 c.y/ton Metals weigh approximately 150 Ibs/cubic yard, or 13.3 c.y/ton Lumber weighs approximately 300 Ibs/cubic yard, or 6.7 c.y/ton Cardboard weighs approximately 100 Ibs/cubic yard, or 20 c.y/ton 2' -15 Q LJ z z let 04 z a� .M U OU az ON4 o a VW U a z az C, Z F �Wa r C7 a a¢ 0 F �00 y� Q U U W Qi O F Attachment 2 - 3 w U Q a a ajam > U U =ate Q Z O LU a. a z a. a .... o y w w I I LLx V; V1' , UI LL wxI Q ' Z'wl Lo -. -1 LLLLL L I Q I I I + V J 01 of I f � J a •, IL c• a AI Z f v. Z O. I 4C w I i 0 (s CI); c; w i I i D,' Q i� 2FN I I of I Q�. I ._ - lzj', L',`!, I W I Ci; f � • w _ a Wa a'. w z w ¢I w; a' W; W Q QI F_ : m F W I �I ZI I �' X J �; J. Q' U O C O �al�l I m I w : J az C, Z F �Wa r C7 a a¢ 0 F �00 y� Q U U W Qi O F Attachment 2 - 3 w U Q a a ajam > U U =ate Q Z O LU a. a z a. a .... o y