HomeMy WebLinkAbout09-16-2014 pc DiGangiThe following documents (contained in 5 volumes) made up the City of San Luis Obispo's Land Use and Circulation Elements (LUCE) Update and Draft Programmatic
Environmental Impact Report (EIR). The current versions of the Land Use and Circulation Elements are contained in Volume II of this document set.
PUBLIC COMMENT PERIOD ON DRAFT EIR - CLOSED: The public review period for the Draft EIR ran from Friday, June 13, 2014 to Monday, July 28, 2014. The
official public comment period on the Draft Progammatic EIR is therefore closed. Comments received after July 28, 2014 will be forwarded to decision makers, but will
not be officially responded to as part of the Final Programmatic EIR.
PUBLIC HEARINGS: Hearings started on July 1, 2014 with a joint meeting of City Council and Planning Commission. Hearings with these two bodies will continue
through October 2014. See the Home page of this website for the latest on future hearing dates. Meetings with various City advisory committees were also held in July
2014.
While the official comment period on the EIR is closed, the public is encouraged to attend future hearings and provide their comments on the content of the LUCE
Update documents (Volume II, below).
Documents are in an Acrobat PDF format. If you don't already have Adobe Acrobat or Acrobat Reader on your computer, Acrobat Reader is a free software program
that can be downloaded/installed by clicking on the following link (this will take you to the Adobe website if you are currently connected to the internet).
http://get.adobe.com/reader/
Some files below are quite large and may take a little time to open depending on your system.
Provides a summary of the proposed project, the purpose of the EIR, and the main findings
of the environmental analysis.
Click here to download
Acknowledgements
Table of Contents
Executive Summary
1.0 Introduction
2.0 Project Description
3.0 Setting
4.0 Environmental Impact Analysis
5.0 Other CEQA Considerations
6.0 Alternatives
7.0 References / Preparers / Glossary
Click here to download Draft Program EIR
Click here to download an index of the EIR (by locations and topics)
Website HelpConsulting Team
Public Draft Documentshttp://www.slo2035.com/library/documents-reports/43-public-draft-doc...
1 of 3 9/13/2014 8:24 PM
Appendix A Draft Land Use Element (Click here to download)
Appendix B Draft Circulation Element (Click here to download)
Appendix C Draft South Broad Street Area Plan (Click here to download)
The Background Report provides details on the existing conditions with the City and
surrounding Planning Area. A summary of this document is provided in the Background
Report Newsletter (Click here to download newsletter).
Table of Contents, Acronyms, 1.0 Introduction (Click here to download)
2.0 SLO Today (Click here to download)
3.0 Community Development (Click here to download)
4.0 Circulation (Click here to download)
5.0 Infrastructure (Click here to download)
6.0 Environmental Resources (Click here to download)
Appendix E - NOP and Responses (Click here to download)
Appendix F - Airport Land Use Compatibility Report (Click here to download)
Appendix G - Air Quality Modeling (Click here to download)
Appendix H - Greenhouse Gases (Click here to download)
Appendix I - Water Supply Assessment (Click here to download)
Appendix J - Noise Modeling (Click here to download)
Appendix K - Existing Condition Worksheets (Click here to download)
Appendix L - Preferred Alternative Worksheets (Click here to download)
Appendix M - LOS Graphics (Click here to download)
Appendix N - Sensitivity Analysis (Click here to download)
Expanded background on the sensitivity analysis conducted for the circulation choices
developed for the LUCE. (Prepared June 29, 2014)
Click here to download memo
Public Draft Documentshttp://www.slo2035.com/library/documents-reports/43-public-draft-doc...
2 of 3 9/13/2014 8:24 PM
Appendix n: sensitivity AnALysis
sen
s
i
t
i
v
i
t
y
A
n
AL
ys
i
s
n
Please see the next page.
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
TECHNICAL MEMORANDUM
City of San Luis Obispo
General Plan Update
Sensitivity Analyses of the Roadway Improvements
City of San Luis Obispo, Central Coast Transportation Consulting, Kittelson & Associates Inc.
Date: June 4, 2014 Project #: 172760
To: Jake Hudson, City of San Luis Obispo
From: Jim Damkowitch, Franklin Cai, T.E.
cc:
As shown in Section 2.0, of the DEIR Project Description (Tables 2.4-2 and 2.5-1, respectively), the
proposed LUCE Update includes sixteen potential development areas (including the South Broad Street
Special Planning Area) and seventeen proposed street network changes. The latter entails changes to
the physical transportation assets of the City of San Luis Obispo. This includes new roadway connections
(new centerline miles of roadway), one-way to two-way conversions, realignments, over-crossings, new
interchanges and road/ramp closures. A complete listing of the candidate improvements are provided
on the following page.
All the listed improvements are reflected in the General Plan DEIR Maximum Build-Out alternative.
Many of these improvements have been included or considered as part of past planning studies
performed for or by the City of San Luis Obispo – including the existing General Plan. Given that the cost
of implementing these improvements is significant and the operational effects of their implementation
to adjacent facilities not fully understood, a sensitivity assessment was performed on each
improvement. Using the 2035 Maximum Build-Out condition as the basis, each proposed roadway
improvement was analyzed in isolation to determine its operational efficiency and impact to the
surrounding street network.
The operational software SYNCHRO was used to evaluate study intersections adjacent to each
improvement. Intersection LOS, turn movement LOS and 95th percentile queues were analyzed with and
without the improvement. Segment LOS was also determined based on the City’s daily thresholds.
The results of each assessment informed the City which improvements should be advanced for inclusion
in the proposed General Plan.
Appendix N, Sensitivity Analysis Page N-1
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
Circulation Preferred Alternative:
Prado Road (Full interchange with phased implementation)
Bishop Extension
Orcutt Overpass
LOVR By-Pass
Hwy 1/Hwy 101 &Broad ramp closures
Marsh/Higuera - 2 way
Mission Plaza Expansion
Madonna –Realign
Chorro & Broad – Realign
Boysen & Santa Rosa (Includes grade-separated crossing for bike/ped. Include turn restrictions
Bianchi/Pismo/Higuera Realignment
New collector – Tank Farm to Buckley
DT Transit Center
Calle Joaquin connection to Dalidio Dr
Vachel Realign
Victoria Connection
Broad Street – Consolidate access
See attachment 1 for the configuration diagrams of the above stated improvements.
Page N-2 Appendix N, Sensitivity Analysis
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
The following provides the operational summaries of the adjacent facilities when the effect of each improvement is tested:
a.The Effect of Not Having the Single Point Urban Interchange (SPUI) at SR-1 and SR-101:
Intersection Operations of Facilities Adjacent to the SPUI Under Max Build-Out Conditions:
Intersection Operations of Facilities Adjacent to the Proposed SPUI when the Improvement is Removed:
IntersectionAM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Santa Rosa & Olive 3282 14.3B None 4186 23 C NBL - LOS F
NBL 95% Q at >=282'
Santa Rosa & Walnut 2200 15 B None 2434 15.6B None
SR-1 & SR-101 SPUI 5667 34.1C None 5655 45.9D SEL - LOS F
SBL 95% Q at >=456'SEL2 - LOS F
SEL 95% Q at >=253'SBL 95% Q at >=187'
NEL2 95% Q at >=522'SEL 95% Q at >=444'
NEL2 95% Q at >=759'
FULL BUILD
IntersectionAM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Santa Rosa & Olive 3162 20.9C SBL - LOS F 3705 15.4B None
Santa Rosa & Walnut 2622 42.1D WBR - LOS F 2891 43.8D WBR - LOS F
WBR 95% Q at >=282'WBR 95% Q at >=393'
SBL 95% Q at >=111'
FULL BUILD MINUS SPUI AT SR-1 AND SR-101 AND NO RAMP CLOSURES
Ap
p
e
n
d
i
x
N
,
S
e
n
s
i
t
i
v
i
t
y
A
n
a
l
y
s
i
s
Pa
g
e
N
-
3
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
Roadway Segment Operations of Facilities Adjacent to the Proposed SPUI when the Improvement is Removed:
Finding
Based on the operational results – the Hwy 1/Hwy 101 &Broad ramp closures improvement concept should be advanced.
Roadway Segment Roadway Type
Adjusted 2035
Average Daily
Traffic
LOS*
Olive Local, 2-lanes2,771 C
Olive Local, 2-lanes4,981 C
Walnut Local, 2-lanes3,179 C
Walnut Local, 2-lanes11,346 D
*2013 Quality/Level of Service Handbook, Florida Department of Transportation
East of Santa Rosa
East of Santa Rosa
Location
West of Santa Rosa
West of Santa Rosa
Pa
g
e
N
-
4
Ap
p
e
n
d
i
x
N
,
S
e
n
s
i
t
i
v
i
t
y
A
n
a
l
y
s
i
s
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
b.The Effect of Not Having the Two-Way Conversion of Higeura Street and Marsh Street between Santa Rosa Street and Johnson Ave:
Operations of Facilities Adjacent to the Two-Way Conversion under Max Build-Out Conditions:
Operations of Facilities Adjacent to the Proposed Two-Way Conversions when the Improvement is Removed:
Roadway Segment Operations of Facilities Adjacent to the Proposed Two-Way Conversions when the Improvement is
Removed:
Finding
Based on the operational results – the Two-Way Conversion of Higeura Street and Marsh Street concept should be advanced.
Intersection AM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Johnson & Mash 831 6.8ANone 1360 16.6BNone
Johnson & Higuera 844 19.7CNone 1063 32.3DNone
Santa Rosa & Mash 1343 12.3BNone 2289 10.8BNone
Santa Rosa & Higuera 831 5.1ANone 2636 8.1ANone
No Queuing Issues Predicted
FULL BUILD
Intersection AM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Johnson & Mash 849 27.1CNone 1337 44.6DNone
Johnson & Higuera 914 14.6BNone 1030 17.5CNone
Santa Rosa & Mash 1192 10.7BNone 2062 10.6BNone
Santa Rosa & Higuera 1807 5.2ANone 2382 6.7ANone
No Queuing Issues Predicted
FULL BUILD WITHOUT CONVERTING MARSH AND HIGEURA TO TWO WAY
Roadway Segment Roadway Type
Adjusted
2035
Average
Daily Traffic
LOS*
Marsh Arterial, 3-lanes9,544 B
Higuera Arterial, 2-lanes3,895 C
*2013 Quality/Level of Service Handbook, Florida Department of Transportation
Location
West of Santa Rosa
West of Toro
Ap
p
e
n
d
i
x
N
,
S
e
n
s
i
t
i
v
i
t
y
A
n
a
l
y
s
i
s
Pa
g
e
N
-
5
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
c.The Effect of Not Having the Los Osos Valley Road Extension:
Operations of Facilities Adjacent to the LOVR Extension under Max Build-Out Conditions:
Operations of Facilities Adjacent to the Proposed LOVR Extension when the Improvement is removed:
Finding
Based on the operational results – the Los Osos Valley Road extension concept should be advanced.
AM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Buckley & LOVR Ext 137014 BNone 218018 BNone
LOVR & Higuera 222913 BNone 262721 CSBR 95% Queue >780'
LOVR Ext & LOVR 186011 BNone 277029 CNone
FULL BUILD
AM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Buckley & LOVR Ext
LOVR & Higuera 254920 CNone 365887 F NBL
LOVR Ext & LOVR
Full Build Minus LOVR Extension
Does not exist
Does not exist
Pa
g
e
N
-
6
Ap
p
e
n
d
i
x
N
,
S
e
n
s
i
t
i
v
i
t
y
A
n
a
l
y
s
i
s
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
d.The Effect of Not Having the Bishop Street Extension:
Operations of Facilities Adjacent to the Proposed Bishop Street Extension under Max Build-Out Conditions:
Operations of Facilities Adjacent to the Proposed Bishop Street Extension when the Improvement is removed:
Finding
Based on the operational results – the Bishop Street extension concept should be advanced.
AM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
San Luis Drive & Johnson 2099 3 A None 2267 3ANone
Broad & Orcutt 312718 B NBL 388827 CSBL LOS E
Broad & South & Santa Barbara 3868106 FAll approaches.391852 DEB, WB approaches
FULL BUILD
AM VolumeAM DelayAM LOSMov. FailuresPM VolumePM DelayPM LOSMov. Failures
Buckley & LOVR Ext
LOVR & Higuera 254920 CNone 365887 F NBL
LOVR Ext & LOVR
Full Build Minus LOVR Extension
Does not exist
Does not exist
Ap
p
e
n
d
i
x
N
,
S
e
n
s
i
t
i
v
i
t
y
A
n
a
l
y
s
i
s
Pa
g
e
N
-
7
General Plan Update Project #: 172760
June 3, 2014
Kittelson & Associates, Inc. Sacramento, CA
Appendix 1
Circulation Alternatives
Page N-8 Appendix N, Sensitivity Analysis
LO
V
R
& Bu
c
k
l
e
y
Ro
a
d
Vi
c
i
n
i
t
y
Bu
c
k
l
e
y
R
d
VachellRd
Ta
n
k
F
a
r
m
R
d
Su
b
u
r
b
a
n
R
d
IS
S
U
E
S
‐
Co
n
g
e
s
t
i
o
n
Al
o
n
g
Hi
g
u
e
r
a
,
Tank Farm, & LOVR
‐
Lo
s
Ve
r
d
e
s
Ne
i
g
h
b
o
r
h
o
o
d
s
Access
‐
WB
Bu
c
k
l
e
y
Ro
a
d
Ac
c
e
s
s
FO
O
D
4 LE
S
S
TENNIS WAREHOUSE
RV
ST
O
R
A
G
E
2
3
Appendix N, Sensitivity Analysis Page N-9
1.
Ta
n
k
Fa
r
m
Ro
a
d
to
Bu
c
k
l
e
y
Ro
a
d
1-
2
.
E
x
a
m
p
l
e
A
l
i
g
n
m
e
n
t
Is
s
u
e
:
‐
He
a
v
y
Co
n
g
e
s
t
i
o
n
Hi
g
u
e
r
a
,
LO
V
R
,
& Ta
n
k
Fa
r
m
‐
Co
n
n
e
c
t
i
v
i
t
y
be
t
w
e
e
n
Ta
n
k
Fa
r
m
Ro
a
d
an
d
Bu
c
k
l
e
y
Road
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
1‐2:
Wh
e
r
e
to
in
t
e
r
s
e
c
t
wi
t
h
Su
b
u
r
b
a
n
Ro
a
d
Di
s
t
u
r
b
s
so
m
e
ex
i
s
t
i
n
g
st
r
u
c
t
u
r
e
s
& pr
o
p
e
r
t
i
e
s
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
1‐3:
In
t
e
r
s
e
c
t
i
o
n
wi
t
h
Su
b
u
r
b
a
n
Ro
a
d
Te
n
t
Tr
a
c
t
29
4
3
(Earthwood)
Ma
y
Di
s
t
u
r
b
se
v
e
r
a
l
ex
i
s
t
i
n
g
st
r
u
c
t
u
r
e
s
& pr
o
p
e
r
t
i
e
s
Cr
e
e
k
cr
o
s
s
i
n
g
Ge
n
e
r
a
l
Di
s
c
u
s
s
i
o
n
Po
i
n
t
:
Co
n
n
e
c
t
i
o
n
co
u
l
d
be
ma
d
e
fa
r
t
h
e
r
ea
s
t
an
d
co
o
r
d
i
n
a
t
e
d
with the Chevron
Sp
e
c
i
f
i
c
Pl
a
n
Buckley RdVachell RdSuburban RdTank Farm Rd
1-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
Bu
c
k
l
e
y
R
d
Vachell Rd
Oc
t
a
g
o
n
B
a
r
n
Su
b
u
r
b
a
n
R
d
Ta
n
k
F
a
r
m
R
d
Bu
c
k
l
e
y
R
d
Vachell Rd
Su
b
u
r
b
a
n
R
d
Ta
n
k
F
a
r
m
R
d
1-
3
.
E
x
a
m
p
l
e
G
e
n
e
r
a
l
A
r
e
a
f
o
r
A
l
i
g
n
m
e
n
t
FO
O
D
4 LE
S
S
MA
R
R
I
O
T
T
RV
ST
O
R
A
G
E
FO
O
D
4 LESS
MA
R
R
I
O
T
T
RV
ST
O
R
A
G
E
FO
O
D
4 LE
S
S
MA
R
R
I
O
T
T
RV
ST
O
R
A
G
E
Page N-10 Appendix N, Sensitivity Analysis
Buckley Rd
2.
LO
V
R
to
Bu
c
k
l
e
y
Ro
a
d
Co
n
n
e
c
t
i
o
n
2-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
2-
2
.
E
x
a
m
p
l
e
L
O
V
R
B
y
p
a
s
s
A
l
i
g
n
m
e
n
t
Is
s
u
e
:
‐
Ea
s
e
of
ac
c
e
s
s
en
t
e
r
i
n
g
& ex
i
t
i
n
g
Lo
s
Ve
r
d
e
s
‐
Vo
l
u
m
e
of
tr
a
f
f
i
c
pa
s
s
i
n
g
by
Lo
s
Ve
r
d
e
s
‐
Fu
t
u
r
e
Co
n
g
e
s
t
i
o
n
at
LO
V
R
& Hi
g
u
e
r
a
‐
LO
V
R
Co
n
n
e
c
t
i
o
n
s
to
Bu
c
k
l
e
y
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
2‐2:
Mo
v
i
n
g
ro
a
d
an
d
no
i
s
e
im
p
a
c
t
s
fr
o
m
on
e
si
d
e
of Los Verdes to the other.
Op
e
n
sp
a
c
e
an
d
ag
r
i
c
u
l
t
u
r
a
l
im
p
a
c
t
s
Ca
r
e
f
u
l
no
t
to
di
s
t
u
r
b
Oc
t
a
g
o
n
Ba
r
n
Sm
a
l
l
we
t
l
a
n
d
no
r
t
h
of
Oc
t
a
g
o
n
Ba
r
n
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
2‐3:
Al
i
g
n
m
e
n
t
of
LO
V
R
By
p
a
s
s
Ca
r
e
f
u
l
no
t
to
di
s
t
u
r
b
Oc
t
a
g
o
n
Ba
r
n
Vachell Rd
Bu
c
k
l
e
y
R
d
Vachell Rd
Oc
t
a
g
o
n
B
a
r
n
Su
b
u
r
b
a
n
R
d
Ta
n
k
F
a
r
m
R
d
Suburban RdTank Farm Rd
Bu
c
k
l
e
y
R
d
2-
3
.
E
x
a
m
p
l
e
B
u
c
k
l
e
y
R
o
a
d
A
l
i
g
n
m
e
n
t
Vachell Rd
Su
b
u
r
b
a
n
R
d
Ta
n
k
F
a
r
m
R
d
FO
O
D
4 LE
S
S
MA
R
R
I
O
T
T
RV
ST
O
R
A
G
E
FO
O
D
4 LESS
MA
R
R
I
O
T
T
RV
ST
O
R
A
G
E
FO
O
D
4 LE
S
S
MA
R
R
I
O
T
T
RV
ST
O
R
A
G
E
Appendix N, Sensitivity Analysis Page N-11
3-
2
.
V
a
c
h
e
l
L
n
.
R
e
a
l
i
g
n
m
e
n
t
3.
Va
c
h
e
l
l
Ro
a
d
to
Hi
g
u
e
r
a
Ro
a
d
Is
s
u
e
s
:
‐
Hi
g
u
e
r
a
& LO
V
R
Co
n
g
e
s
t
i
o
n
‐
Sk
e
w
of
in
t
e
r
s
e
c
t
i
o
n
at
S.
Hi
g
u
e
r
a
an
d
Va
c
h
e
l
l
Road
‐
LO
V
R
Co
n
n
e
c
t
i
o
n
s
to
Bu
c
k
l
e
y
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
3‐2:
Im
p
a
c
t
s
bu
i
l
d
i
n
g
s
& pr
o
p
e
r
t
y
Po
t
e
n
t
i
a
l
ad
d
i
t
i
o
n
a
l
tr
a
f
f
i
c
on
LO
V
R
in
fr
o
n
t
of
Los Verdes
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
3‐3:
Im
p
a
c
t
s
pa
r
k
i
n
g
lo
t
fo
r
ad
j
a
c
e
n
t
bu
s
i
n
e
s
s
e
s
,
em
e
r
g
e
n
c
y
ac
c
e
s
s
is
s
u
e
s
3-
2
.
E
x
i
s
t
i
n
g
A
l
i
g
n
m
e
n
t
3-
3
.
V
a
c
h
e
l
L
n
.
C
u
l
-
d
e
-
S
a
c
VachelLn.VachelLn.
VachelLn.
Page N-12 Appendix N, Sensitivity Analysis
LO
V
R
,
Hi
g
u
e
r
a
,
& Ma
d
o
n
n
a
Vi
c
i
n
i
t
y
IS
S
U
E
S
‐
Hi
g
h
Vo
l
u
m
e
s
Al
o
n
g
Madonna & LOVR
‐
Cu
t
th
r
u
tr
a
f
f
i
c
in
W. Oceanaire Neighborhood
‐
WB
/
E
B
Ac
c
e
s
s
fo
r
E. Oceanaire Neighborhood
Ne
e
d
ne
i
g
h
b
o
r
h
o
o
d
in
p
u
t
on
co
n
n
e
c
t
i
v
i
t
y
Appendix N, Sensitivity Analysis Page N-13
4.
P
r
a
d
o
Ov
e
r
p
a
s
s
/ In
t
e
r
c
h
a
n
g
e
4-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
4-
2
.
E
x
a
m
p
l
e
P
r
a
d
o
R
o
a
d
E
x
t
e
n
s
i
o
n
w
i
t
h
F
u
l
l
I
n
t
e
r
c
h
a
n
g
e
4-
3
.
E
x
a
m
p
l
e
P
r
a
d
o
R
o
a
d
E
x
t
e
n
s
i
o
n
w
i
t
h
O
v
e
r
p
a
s
s
O
n
l
y
Is
s
u
e
s
:
Li
m
i
t
e
d
ea
s
t
‐we
s
t
co
n
n
e
c
t
i
v
i
t
y
th
r
o
u
g
h
o
u
t
city
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
Si
t
e
4‐2:
Re
l
i
e
v
e
s
in
t
e
n
s
i
t
y
an
d
co
n
g
e
s
t
i
o
n
at
LO
V
R
& Madonna interchanges.
Re
l
i
e
v
e
s
in
t
e
n
s
i
t
y
an
d
co
n
g
e
s
t
i
o
n
al
o
n
g
Ma
d
o
n
n
a
Road & Oceanaire
Ne
i
g
h
b
o
r
h
o
o
d
s
.
El
k
s
La
n
e
re
a
l
i
g
n
m
e
n
t
or
cu
l
‐de
‐sa
c
Co
u
l
d
be
co
m
b
i
n
e
d
wi
t
h
Ca
l
l
e
Jo
a
q
u
i
n
Ex
t
e
n
s
i
o
n
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
Si
t
e
4‐3:
Wo
u
l
d
no
t
re
l
i
e
v
e
tr
a
f
f
i
c
at
LO
V
R
or
Ma
d
o
n
na
& may drive further expansion
of
th
o
s
e
in
t
e
r
c
h
a
n
g
e
s
.
El
k
s
La
n
e
re
a
l
i
g
n
m
e
n
t
or
cu
l
‐de
‐sa
c
Re
q
u
i
r
e
cl
o
s
u
r
e
or
ac
c
e
s
s
co
n
t
r
o
l
on
El
k
s
La
n
e
.
Ge
n
e
r
a
l
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
:
Co
n
t
i
n
g
e
n
t
on
co
o
p
e
r
a
t
i
o
n
wi
t
h
Ca
l
t
r
a
n
s
Pr
o
v
i
d
e
s
ac
c
e
s
s
to
pr
o
p
o
s
e
d
Da
l
i
d
i
o
pr
o
p
e
r
t
y
development
Co
n
s
i
d
e
r
a
t
i
o
n
fo
r
ex
i
s
t
i
n
g
de
v
e
l
o
p
m
e
n
t
on
ea
s
t
side of US 101
Da
l
i
d
i
o
P
r
o
p
e
r
t
y
Da
l
i
d
i
o
P
r
o
p
e
r
t
y
Da
l
i
d
i
o
P
r
o
p
e
r
t
y
Page N-14 Appendix N, Sensitivity Analysis
5-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
5-
2
.
O
p
t
i
o
n
a
l
C
o
n
n
e
c
t
i
o
n
f
r
o
m
N
e
i
g
h
b
o
r
h
o
o
d
t
o
F
r
o
o
m
Is
s
u
e
s
:
‐
Li
m
i
t
e
d
ac
c
e
s
s
fr
o
m
S.
Oc
e
a
n
a
i
r
e
ne
i
g
h
b
o
r
h
o
o
d
to the East. LOVR, Madonna
Ro
a
d
‐
In
c
r
e
a
s
e
d
di
f
f
i
c
u
l
t
y
wi
t
h
Fr
o
o
m
Ex
t
e
n
s
i
o
n
& LO
V
R
Volume Increases
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
LO
V
R
& Ma
d
o
n
n
a
Ro
a
d
:
Si
t
e
co
n
s
t
r
a
i
n
t
s
ma
k
e
ro
u
n
d
a
b
o
u
t
or
ad
d
i
t
i
o
n
of lanes highly challenging. This
li
k
e
l
y
wo
u
l
d
re
q
u
i
r
e
ad
d
i
t
i
o
n
a
l
ri
g
h
t
‐of
‐wa
y
an
d
disruption of existing
bu
i
l
d
i
n
g
s
.
Op
t
i
o
n
a
l
co
n
n
e
c
t
i
o
n
fr
o
m
ne
i
g
h
b
o
r
h
o
o
d
to
Fr
o
o
m
& or LOVR to provide
al
t
e
r
n
a
t
i
v
e
ex
i
t
fr
o
m
ne
i
g
h
b
o
r
h
o
o
d
bu
t
ma
y
le
a
d
to Cut thru traffic.
Se
e
k
in
p
u
t
fr
o
m
ne
i
g
h
b
o
r
h
o
o
d
re
s
i
d
e
n
t
s
as
to
whether they need different
co
n
n
e
c
t
i
v
i
t
y
.
5-
3
.
O
p
t
i
o
n
a
l
C
o
n
n
e
c
t
i
o
n
f
r
o
m
N
e
i
g
h
b
o
r
h
o
o
d
t
o
L
O
V
R
5.
Oc
e
a
n
a
i
r
e
Ne
i
g
h
b
o
r
h
o
o
d
Co
n
n
e
c
t
i
o
n
s
Appendix N, Sensitivity Analysis Page N-15
6.
Fr
o
o
m
Ra
n
c
h
an
d
Ca
l
l
e
Jo
a
q
u
i
n
Co
n
n
e
c
t
i
o
n
s
to
an
d
wi
t
h
i
n
Da
l
i
d
i
o
Pr
o
p
e
r
t
y
6-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
6-
2
.
E
x
a
m
p
l
e
w
i
t
h
O
n
e
I
n
t
e
r
n
a
l
I
n
t
e
r
s
e
c
t
i
o
n
6-
3
.
E
x
a
m
p
l
e
w
i
t
h
S
e
v
e
r
a
l
I
n
t
e
r
n
a
l
I
n
t
e
r
s
e
c
t
i
o
n
s
Is
s
u
e
s
:
‐
Co
n
n
e
c
t
i
v
i
t
y
fo
r
Fr
o
o
m
Ra
n
c
h
Ro
a
d
an
d
Ca
l
l
e
Joaquin
‐
He
a
v
y
Co
n
g
e
s
t
i
o
n
on
Ma
d
o
n
n
a
& LO
V
R
Ro
a
d
s
‐
Cu
t
Th
r
u
Tr
a
f
f
i
c
In
N.
Oc
e
a
n
a
i
r
e
Ne
i
g
h
b
o
r
h
o
o
d
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
6‐2:
Co
n
n
e
c
t
Ca
l
l
e
Jo
a
q
u
i
n
to
Ma
d
o
n
n
a
Ro
a
d
Co
n
n
e
c
t
Fr
o
o
m
Ra
n
c
h
Wa
y
to
Ca
l
l
e
Jo
a
q
u
i
n
at
one (1) location
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
6‐3:
Co
n
n
e
c
t
Ca
l
l
e
Jo
a
q
u
i
n
to
Ma
d
o
n
n
a Ro
a
d
Co
n
n
e
c
t
Fr
o
o
m
Ra
n
c
h
Wa
y
to
Ca
l
l
e
Jo
a
q
u
i
n
at
two (2) or more locations
Ge
n
e
r
a
l
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
:
Ca
l
l
e
Jo
a
q
u
i
n
Ex
t
e
n
s
i
o
n
wi
t
h
Pr
a
d
o
Ro
a
d
co
n
n
e
c
t
i
o
n
can enhance circulation
an
d
al
l
e
v
i
a
t
e
tr
a
f
f
i
c
at
LO
V
R
in
t
e
r
c
h
a
n
g
e
an
d
LO
V
R
& Madonna Road
Re
d
u
c
e
tr
a
f
f
i
c
im
p
a
c
t
s
on
ex
i
s
t
i
n
g
ne
i
g
h
b
o
r
h
o
o
d
s
.
Ac
t
i
v
e
st
r
e
e
t
ed
g
e
/ pa
r
k
i
n
g
be
h
i
n
d
bu
i
l
d
i
n
g
s
Tr
a
i
l
co
n
n
e
c
t
i
v
i
t
y
Bi
c
y
c
l
e
ac
c
e
s
s
be
t
w
e
e
n
Da
l
i
d
i
o pr
o
p
e
r
t
y
an
d
co
m
m
e
r
c
i
a
l
areasProposed Prado Road improvementsProposed Prado Road improvements
Pr
o
p
o
s
e
d
P
r
a
d
o
Ro
a
d
i
m
p
r
o
v
e
m
e
n
t
s
Pr
o
p
o
s
e
d
P
r
a
d
o
Ro
a
d
i
m
p
r
o
v
e
m
e
n
t
s
Page N-16 Appendix N, Sensitivity Analysis
Mi
d
Hi
g
u
e
r
a
Vi
c
i
n
i
t
y
8
7
IS
S
U
E
S
‐
Hi
g
h
Vo
l
u
m
e
s
Al
o
n
g
Higuera
‐
Ac
c
e
s
s
Ma
n
a
g
e
m
e
n
t
Issues
‐
Pe
d
e
s
t
r
i
a
n
Cr
o
s
s
i
n
g
s
Issues
‐
Aw
k
w
a
r
d
In
t
e
r
s
e
c
t
i
o
n
s
Appendix N, Sensitivity Analysis Page N-17
7.
Ma
d
o
n
n
a
/ Hi
g
u
e
r
a
In
t
e
r
s
e
c
t
i
o
n
7-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
7-
2
.
E
x
a
m
p
l
e
R
e
a
l
i
g
n
m
e
n
t
a
n
d
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
Is
s
u
e
:
Sh
a
r
p
tu
r
n
s
an
d
di
f
f
i
c
u
l
t
si
g
h
t
l
i
n
e
s
at
sk
e
w
e
d
intersection
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
7‐2:
Im
p
a
c
t
s
Ca
l
t
r
a
n
s
bu
i
l
d
i
n
g
Po
s
s
i
b
l
e
lo
c
a
t
i
o
n
s
fo
r
ro
u
n
d
a
b
o
u
t
s
or
ot
h
e
r
in
t
e
r
s
e
c
t
i
o
n
improvements
Po
t
e
n
t
i
a
l
to
in
c
r
e
a
s
e
cu
t
‐th
r
o
u
g
h
tr
a
f
f
i
c
on
Br
i
d
g
e
Street Without Additional
me
a
s
u
r
e
s
.
Op
t
i
o
n
s
fo
r
pr
e
v
e
n
t
i
n
g
cu
t
‐th
r
o
u
g
h
tr
a
f
f
i
c
:
Ha
l
f
‐st
r
e
e
t
cl
o
s
u
r
e
Fu
l
l
‐st
r
e
e
t
Me
d
i
a
n
di
v
e
r
t
e
r
Sa
f
e
t
y
en
h
a
n
c
e
m
e
n
t
fo
r
bi
k
e
s
an
d
pe
d
e
s
t
r
i
a
n
s
Co
n
t
i
n
g
e
n
t
on
co
o
p
e
r
a
t
i
o
n
wi
t
h
Ca
l
T
r
a
n
s
Ma
d
o
n
n
a
R
d
Higuera St.
Bridge St
So
u
t
h
S
t
Beebee St
Higuera St.
Br
i
d
g
e
S
t
So
u
t
h
S
t
Beebee St
Ex
a
m
p
l
e
C
u
t
T
h
r
u
P
r
e
v
e
n
t
i
o
n
M
e
a
s
u
r
e
s
Ma
d
o
n
n
a
R
d
Higuera St.
Br
i
d
g
e
S
t
So
u
t
h
S
t
Beebee St
In
s
t
a
l
l
cu
t
-
t
h
r
o
u
g
h
pr
e
v
e
n
t
i
o
n
me
a
s
u
r
e
s
Me
d
i
a
n
Re
s
t
r
i
c
t
i
o
n
Po
s
s
i
b
l
e
Ro
u
n
d
a
b
o
u
t
Po
s
s
i
b
l
e
Ro
u
n
d
a
b
o
u
t
Page N-18 Appendix N, Sensitivity Analysis
8.
H
i
g
h
& Pi
s
m
o
/ Hi
g
u
e
r
a
In
t
e
r
s
e
c
t
i
o
n
8-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
8-
2
.
E
x
a
m
p
l
e
C
o
n
v
e
r
s
i
o
n
o
f
H
i
g
h
S
t
.
t
o
O
n
e
W
a
y
Is
s
u
e
:
‐
He
a
v
y
Co
n
g
e
s
t
i
o
n
in
In
t
e
r
s
e
c
t
i
o
n
‐
Aw
k
w
a
r
d
In
t
e
r
s
e
c
t
i
o
n
al
i
g
n
m
e
n
t
af
f
e
c
t
s
sa
f
e
t
y
‐
Lo
n
g
pe
d
e
s
t
r
i
a
n
cr
o
s
s
i
n
g
s
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
8‐2:
On
e
wa
y
co
u
p
l
e
t
sy
s
t
e
m
be
t
w
e
e
n
Hi
g
h
St
.
Pi
s
m
o
& Beach St.
Im
p
a
c
t
s
Dr
u
m
Ci
r
c
u
i
t
bu
i
l
d
i
n
g
Ma
y
al
l
o
w
ad
d
i
t
i
o
n
a
l
on
‐st
r
e
e
t
pa
r
k
i
n
g
on
Hi
g
h
between Higuera and Walker
Mo
d
i
f
y
tr
u
c
k
ro
u
t
e
s
& re
d
u
c
e
s
im
p
a
c
t
on
ne
i
g
h
b
o
r
h
o
o
d
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
8‐3:
On
e
wa
y
co
u
p
l
e
t
sy
s
t
e
m
be
t
w
e
e
n
Hi
g
h
St
.
Pi
s
m
o
& Beach St.
Re
a
l
i
g
n
s
Pi
s
m
o
St
.
to
al
i
g
n
wi
t
h
Bi
a
n
c
h
i
Ln
.
Im
p
a
c
t
s
Th
e
Su
b
bu
i
l
d
i
n
g
In
t
e
r
s
e
c
t
i
o
n
co
n
t
r
o
l
ev
a
l
u
a
t
i
o
n
ne
c
e
s
s
a
r
y
Im
p
r
o
v
e
s
in
t
e
r
s
e
c
t
i
o
n
op
e
r
a
t
i
o
n
s
an
d
pe
d
e
s
t
r
i
a
n
crossings
Higuera St.
Br
i
d
g
e
S
t
So
u
t
h
S
t
8-
3
.
R
e
a
l
i
g
n
m
e
n
t
o
f
B
i
a
n
c
h
i
L
n
Hi
g
h
S
t
.
Hi
g
h
S
t
.
Hi
g
h
S
t
.
GL
A
C
I
E
R
IC
E
GL
A
C
I
E
R
IC
E
GL
A
C
I
E
R
ICE
Appendix N, Sensitivity Analysis Page N-19
Br
o
a
d
St
r
e
e
t
& Jo
h
n
s
o
n
Av
e
n
u
e
Vi
c
i
n
i
t
y
Or
c
u
t
t
R
d
.
9
10
11
12
Is
s
u
e
s
:
‐
Hi
g
h
vo
l
u
m
e
s
on
Br
o
a
d
& Johnson
‐
Ne
i
g
h
b
o
r
h
o
o
d
cu
t
th
r
u
traffic
‐
Pe
d
e
s
t
r
i
a
n
co
n
n
e
c
t
i
o
n
s
across Broad Street
‐
Vi
c
t
o
r
i
a
Av
e
n
u
e
co
n
n
e
c
t
i
o
n
s
SL
O
H
S
FR
E
N
C
H
HO
S
P
I
T
A
L
AL
B
E
R
T
S
O
N
S
SI
N
S
H
E
I
M
E
R
PA
R
K
AM
T
R
A
K
ST
A
T
I
O
N
Page N-20 Appendix N, Sensitivity Analysis
9.
Vi
c
t
o
r
i
a
Av
e
Co
n
n
e
c
t
i
o
n
9-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
9-
2
.
E
x
a
m
p
l
e
C
o
n
n
e
c
t
i
o
n
o
f
V
i
c
t
o
r
i
a
A
v
e
n
u
e
a
n
d
E
m
i
l
y
S
t
Is
s
u
e
s
:
‐
He
a
v
y
Br
o
a
d
St
r
e
e
t
Co
n
g
e
s
t
i
o
n
‐
Lo
c
a
l
Ac
c
e
s
s
li
m
i
t
a
t
i
o
n
s
‐
Pe
d
e
s
t
r
i
a
n
Co
n
n
e
c
t
i
o
n
s
Ac
r
o
s
s
Br
o
a
d
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
9‐2:
Co
m
p
l
e
t
e
Vi
c
t
o
r
i
a
Av
e
.
Co
n
n
e
c
t
i
o
n
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
9‐3:
Co
n
s
o
l
i
d
a
t
e
ac
c
e
s
s
po
i
n
t
s
in
t
o
en
h
a
n
c
e
d
cr
o
s
s
i
n
g
s
Re
c
l
a
s
s
i
f
y
Br
o
a
d
St
r
e
e
t
Fr
o
m
Hi
g
h
w
a
y
/
R
e
g
i
o
n
a
l
Route to Parkway Arterial
Mo
y
l
a
n
T
e
r
r
a
c
e
De
v
e
l
o
p
m
e
n
t
Moylan Terrace Development
In
c
o
m
p
l
e
t
e
G
r
i
d
9-
3
.
E
x
a
m
p
l
e
C
o
n
s
o
l
i
d
a
t
e
d
A
c
c
e
s
s
W
/
A
c
c
e
s
s
M
a
n
a
g
e
m
e
n
t
(
T
u
r
n
R
e
s
t
r
i
c
t
i
o
n
s
)
Mo
y
l
a
n
T
e
r
r
a
c
e
De
v
e
l
o
p
m
e
n
t
Wo
o
d
b
r
i
d
g
e
Mi
t
c
h
e
l
l
Ca
u
d
i
l
l
Wo
o
d
b
r
i
d
g
e
Mi
t
c
h
e
l
l
Ca
u
d
i
l
l
Wo
o
d
b
r
i
d
g
e
Mi
t
c
h
e
l
l
Ca
u
d
i
l
l
Appendix N, Sensitivity Analysis Page N-21
9a
.
Br
o
a
d
St
r
e
e
t
Ar
e
a
Moylan Terrace Development
Wo
o
d
b
r
i
d
g
e
Mi
t
c
h
e
l
l
Ca
u
d
i
l
l
9a
-
1
.
E
x
i
s
t
i
n
g
G
e
n
e
r
a
l
P
l
a
n
9a
-
2
.
T
a
s
k
F
o
r
c
e
I
n
p
u
t
Di
s
c
u
s
s
i
o
n
Po
i
n
t
on
9a
‐2:
No
lo
n
g
e
r
in
c
l
u
d
e
Mc
M
i
l
l
a
n
ar
e
a
in
th
e
So
u
t
h
Br
o
a
d
Street area
Page N-22 Appendix N, Sensitivity Analysis
10
.
B
i
s
h
o
p
St
Ex
t
e
n
s
i
o
n
10
-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
Is
s
u
e
:
‐
No
Ea
s
t
/
W
e
s
t
Co
n
n
e
c
t
i
o
n
s
be
t
w
e
e
n
Br
o
a
d
& Johnson
‐
He
a
v
y
Co
n
g
e
s
t
i
o
n
al
o
n
g
Br
o
a
d
& Jo
h
n
s
o
n
‐
Cu
t
Th
r
u
Im
p
a
c
t
s
to
Pi
s
m
o
/
B
u
c
h
o
n
N
e
i
g
h
b
o
r
h
o
o
d
‐
Li
m
i
t
e
d
em
e
r
g
e
n
c
y
re
s
p
o
n
s
e
ro
u
t
e
s
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
10
‐2:
Mu
s
t
co
o
r
d
i
n
a
t
e
wi
t
h
Un
i
o
n
Pa
c
i
f
i
c
Ra
i
l
r
o
a
d
Re
d
u
c
e
s
cu
t
th
r
u
tr
a
f
f
i
c
in
ot
h
e
r
ne
i
g
h
b
o
r
h
o
o
d
s
Im
p
a
c
t
s
to
ex
i
s
t
i
n
g
ne
i
g
h
b
o
r
h
o
o
d
on
Bi
s
h
o
p
Ro
u
n
d
h
o
u
s
e
S
t
10
-
2
.
P
l
a
n
n
e
d
C
r
o
s
s
i
n
g
Ro
u
n
d
h
o
u
s
e
S
t
Ov
e
r
p
a
s
s
FI
R
E
ST
A
T
I
O
N
FR
E
S
H
&
EA
S
Y
FR
E
S
H
&
EA
S
Y
FI
R
E
ST
A
T
I
O
N
Appendix N, Sensitivity Analysis Page N-23
11
.
Ma
r
s
h
/
Hi
g
u
e
r
a
& Pi
s
m
o
/ Bu
c
h
o
n
Tw
o
‐wa
y
Ro
a
d
s
an
d
Co
u
p
l
e
t
s
11
-
2
.
C
o
n
v
e
r
t
B
u
c
h
o
n
t
o
O
n
e
-
W
a
y
Is
s
u
e
:
‐
Fi
r
s
t
po
i
n
t
of
E/
W
co
n
n
e
c
t
i
o
n
is
ne
i
g
h
b
o
r
h
o
o
d
leading to cut thru traffic
‐
On
e
wa
y
st
r
e
e
t
sy
s
t
e
m
ma
k
e
ne
x
t
po
i
n
t
of
E/
W
connection further
‐
He
a
v
y
Sc
h
o
o
l
Ti
m
e
Cu
t
‐th
r
u
tr
a
f
f
i
c
on
Bu
c
h
o
n
S
t
r
e
e
t
.
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
11
‐2:
Re
d
u
c
e
s
ne
i
g
h
b
o
r
h
o
o
d
tr
a
f
f
i
c
by
el
i
m
i
n
a
t
i
n
g
SB
movements
Li
m
i
t
s
ac
c
e
s
s
fo
r
ne
i
g
h
b
o
r
h
o
o
d
re
s
i
d
e
n
t
s
.
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
11
‐3:
Re
d
u
c
e
s
ne
i
g
h
b
o
r
h
o
o
d
tr
a
f
f
i
c
by
pr
o
v
i
d
i
n
g
sh
o
r
t
e
r
routes.
Ch
a
n
g
e
s
ac
c
e
s
s
an
d
im
p
a
c
t
s
on
‐st
r
e
e
t
pa
r
k
i
n
g
for business along these
se
c
t
i
o
n
s
of
Hi
g
u
e
r
a
& Ma
r
s
h
.
11
-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
11
-
3
.
C
o
n
v
e
r
t
M
a
r
s
h
&
H
i
g
u
e
r
a
t
o
T
w
o
-
W
a
y
(
C
a
l
i
f
o
r
n
i
a
t
o
S
R
)
AL
B
E
R
T
S
O
N
S
SL
O
H
S
AL
B
E
R
T
S
O
N
S
SL
O
H
S
AL
B
E
R
T
S
O
N
S
SLOHS
Page N-24 Appendix N, Sensitivity Analysis
12
.
Or
c
u
t
t
R
d
.
Ov
e
r
p
a
s
s
Ra
i
l
r
o
a
d
Crossing
12
-
1
.
E
x
i
s
t
i
n
g
O
v
e
r
p
a
s
s
R
a
i
l
r
o
a
d
C
r
o
s
s
i
n
g
12
-
2
.
E
x
a
m
p
l
e
O
v
e
r
p
a
s
s
R
a
i
l
r
o
a
d
C
r
o
s
s
i
n
g
Is
s
u
e
:
Li
m
i
t
e
d
ea
s
t
‐we
s
t
co
n
n
e
c
t
i
v
i
t
y
ci
t
y
‐wi
d
e
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
12
‐2:
En
h
a
n
c
e
d
sa
f
e
t
y
ov
e
r
ex
i
s
t
i
n
g
ov
e
r
p
a
s
s
cr
o
s
s
i
n
g
Mu
s
t
co
o
r
d
i
n
a
t
e
wi
t
h
Un
i
o
n
Pa
c
i
f
i
c
Ra
i
l
r
o
a
d
Ot
h
e
r
lo
c
a
t
i
o
n
s
fo
r
ov
e
r
p
a
s
s
cr
o
s
s
i
n
g
s
ma
y
be
considered
Im
p
a
c
t
s
to
RR
sa
f
e
t
y
tr
a
i
l
.
Ro
u
n
d
h
o
u
s
e
S
t
Or
c
u
t
t
R
d
Ov
e
r
p
a
s
s
R
a
i
l
r
o
a
d
Cr
o
s
s
i
n
g
Ro
u
n
d
h
o
u
s
e
S
t
Or
c
u
t
t
R
d
Overpass RailroadCrossing
Ro
u
n
d
h
o
u
s
e
S
t
Or
c
u
t
t
R
d
CH
E
V
R
O
N
CH
E
V
R
O
N
CH
E
V
R
O
N
MO
R
R
I
S
&
GA
R
R
I
T
A
N
O
I
N
S
.
Ex
a
m
p
l
e
O
v
e
r
p
a
s
s
a
l
i
g
n
m
e
n
t
Appendix N, Sensitivity Analysis Page N-25
Do
w
n
t
o
w
n
15
14
13
16
IS
S
U
E
S
‐
Hw
y
10
1
Ho
o
k
Ra
m
p
s
:
Ti
g
h
t
Spacing & Neighborhoods
‐
He
a
v
y
Co
n
g
e
s
t
i
o
n
at
1 an
d
101 Interchange
‐
Do
w
n
t
o
w
n
Tr
a
n
s
i
t
Ce
n
t
e
r
‐
Mi
s
s
i
o
n
Pl
a
z
a
Do
g
l
e
g
MI
S
S
I
O
N
CO
U
R
T
H
O
U
S
E
CI
T
Y
HA
L
L
MI
S
S
I
O
N
SC
H
O
O
L
Page N-26 Appendix N, Sensitivity Analysis
13
.
Br
o
a
d
St
Do
g
Le
g
(M
i
s
s
i
o
n
Pl
a
z
a
Ex
p
a
n
s
i
o
n
)
13
-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
13
-
2
.
E
x
a
m
p
l
e
E
x
t
e
n
s
i
o
n
o
f
P
e
d
e
s
t
r
i
a
n
P
l
a
z
a
13
-
3
.
E
x
a
m
p
l
e
E
x
p
a
n
s
i
o
n
o
f
P
e
d
e
s
t
r
i
a
n
P
l
a
z
a
Is
s
u
e
:
Co
n
f
u
s
i
o
n
re
g
a
r
d
i
n
g
pa
s
s
‐th
r
o
u
g
h
al
o
n
g
Br
o
a
d
Street
Di
s
c
u
s
s
i
o
n
Po
i
n
t
on
13
‐2:
Po
t
e
n
t
i
a
l
fo
r
pe
d
e
s
t
r
i
a
n
st
r
e
e
t
s
c
a
p
e
en
h
a
n
c
e
m
e
n
t
Di
s
c
u
s
s
i
o
n
Po
i
n
t
on
13
‐3:
Be
n
e
f
i
t
s
to
an
d
im
p
a
c
t
on
Mo
n
t
e
r
e
y
St
r
e
e
t
re
s
i
d
e
n
c
e
s
west of Broad Street
Fu
l
l
Cl
o
s
u
r
e
vs
.
Wo
o
n
e
r
f
,
or
a mi
x
of
cl
o
s
u
r
e
an
d
Woonerf
MI
S
S
I
O
N
MI
S
S
I
O
N
MI
S
S
I
O
N
Appendix N, Sensitivity Analysis Page N-27
14
.
Tr
a
n
s
i
t
Ce
n
t
e
r
Re
l
o
c
a
t
i
o
n
14
-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
14
-
2
.
E
x
a
m
p
l
e
S
i
t
e
L
a
y
o
u
t
o
n
H
i
g
u
e
r
a
S
t
r
e
e
t
Is
s
u
e
:
Tr
a
n
s
i
t
ce
n
t
e
r
co
u
l
d
be
a “s
e
l
f
‐co
n
t
a
i
n
e
d
”
hub
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
14
‐2:
Pe
d
e
s
t
r
i
a
n
sa
f
e
t
y
en
h
a
n
c
e
m
e
n
t
s
at
Sa
n
t
a
Ro
s
a
Street and HigueraStreet
Ot
h
e
r
pr
o
p
o
s
e
d
al
t
e
r
n
a
t
i
v
e
s
re
q
u
i
r
e
ri
d
e
r
s
to
cross Higuera Street to access
so
m
e
bu
s
ba
y
s
Ac
q
u
i
s
i
t
i
o
n
of
pr
i
v
a
t
e
pr
o
p
e
r
t
y
Im
p
a
c
t
s
on
ad
j
a
c
e
n
t
pr
o
p
e
r
t
i
e
s
Po
t
e
n
t
i
a
l
be
n
e
f
i
t
s
to
ad
j
a
c
e
n
t
pr
o
p
e
r
t
i
e
s
Po
t
e
n
t
i
a
l
sh
i
f
t
s
in
tr
a
f
f
i
c
fl
o
w
an
d
ro
u
t
e
s
dr
i
v
e
r
s
choose
Co
o
r
d
i
n
a
t
i
o
n
wi
t
h
tr
a
n
s
i
t
ag
e
n
c
i
e
s
Po
t
e
n
t
i
a
l
co
n
v
e
r
s
i
o
n
of
Hi
g
u
e
r
a
St
.
to
Tw
o
Wa
y
.
Hi
g
u
e
r
a
S
t
r
e
e
t
A
l
t
e
r
n
a
t
i
v
e
6
,
SL
O
C
O
G
C
o
o
r
d
i
n
a
t
e
d
T
r
a
n
s
i
t
Ce
n
t
e
r
S
t
u
d
y
,
Ma
r
c
h
5
,
2
0
1
2
Pe
d
e
s
t
r
i
a
n
sa
f
e
t
y
en
h
a
n
c
e
m
e
n
t
s
Ex
a
m
p
l
e
S
i
t
e
L
a
y
o
u
t
W
/
T
w
o
-
W
a
y
T
r
a
f
f
i
c
Hi
g
u
e
r
a
S
t
r
e
e
t
A
l
t
e
r
n
a
t
i
v
e
6
,
SL
O
C
O
G
C
o
o
r
d
i
n
a
t
e
d
T
r
a
n
s
i
t
Ce
n
t
e
r
S
t
u
d
y
,
Ma
r
c
h
5
,
2
0
1
2
Pe
d
e
s
t
r
i
a
n
sa
f
e
t
y
en
h
a
n
c
e
m
e
n
t
s
BA
N
K
OF
AM
E
R
I
C
A
SH
E
L
L
GA
S
ST
A
T
I
O
N
Page N-28 Appendix N, Sensitivity Analysis
15
.
CA
‐1 & US
10
1
In
t
e
r
c
h
a
n
g
e
15
-
1
.
E
x
i
s
t
i
n
g
F
r
e
e
w
a
y
A
c
c
e
s
s
T
h
r
o
u
g
h
N
e
i
g
h
b
o
r
h
o
o
d
s
1
5
-
2
.
P
o
t
e
n
t
i
a
l
f
o
r
E
n
h
a
n
c
e
m
e
n
t
o
f
I
n
t
e
r
c
h
a
n
g
e
SB
o
n
/
o
f
f
ra
m
p
s
CR
SB
o
n
/
o
f
f
R
a
m
p
s
(O
l
i
v
e
S
t
)
NB
o
n
/
o
f
f
r
a
m
p
s
(O
s
o
s
S
t
)
NB
o
n
/
o
f
f
r
a
m
p
s
(T
o
r
o
S
t
)
Is
s
u
e
s
:
‐
Do
e
s
No
t
Me
e
t
Mo
d
e
r
n
De
s
i
g
n
St
a
n
d
a
r
d
s
‐
He
a
v
y
Co
n
g
e
s
t
i
o
n
on
Sa
n
t
a
Ro
s
a
‐
Ra
m
p
sy
s
t
e
m
ro
u
t
e
s
tr
a
f
f
i
c
th
r
u
su
r
r
o
u
n
d
i
n
g
neighborhoods
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
15
‐2:
Re
d
e
s
i
g
n
in
t
e
r
c
h
a
n
g
e
to
al
l
e
v
i
a
t
e
tr
a
f
f
i
c
on
ne
i
g
h
b
o
r
h
o
o
d
streets
Im
p
a
c
t
s
to
ad
j
a
c
e
n
t
bu
s
i
n
e
s
s
e
s
an
d
pr
o
p
e
r
t
i
e
s
Po
t
e
n
t
i
a
l
Ac
c
e
s
s
Re
s
t
r
i
c
t
i
o
n
s
at
ad
j
a
c
e
n
t
in
t
e
r
s
e
c
t
i
o
n
s
(Olive & Walnut)
Cl
o
s
u
r
e
of
ex
i
s
t
i
n
g
ra
m
p
s
to
ne
i
g
h
b
o
r
h
o
o
d
st
r
e
e
t
s
Os
o
s
St
r
e
e
t
an
d
Ol
i
v
e
St
r
e
e
t
To
r
o
St
r
e
e
t
an
d
Ol
i
v
e
St
r
e
e
t
Br
o
a
d
St
r
e
e
t
15
-
2
.
E
x
a
m
p
l
e
I
m
p
a
c
t
t
o
S
u
r
r
o
u
n
d
P
r
o
p
e
r
t
i
e
s
PO
L
I
C
E
ST
A
T
I
O
N
SH
E
L
L
GA
S
ST
A
T
I
O
N
SH
E
L
L
GA
S
ST
A
T
I
O
N
PO
L
I
C
E
ST
A
T
I
O
N
Appendix N, Sensitivity Analysis Page N-29
16
.
Br
o
a
d
St
.
& US
10
1
In
t
e
r
c
h
a
n
g
e
SB
o
n
/
o
f
f
ra
m
p
s
SB
o
n
/
o
f
f
R
a
m
p
s
(O
l
i
v
e
S
t
)
NB
o
n
/
o
f
f
r
a
m
p
s
(T
o
r
o
S
t
)
Is
s
u
e
s
:
‐
Do
e
s
No
t
Me
e
t
Mo
d
e
r
n
De
s
i
g
n
St
a
n
d
a
r
d
s
‐
Ra
m
p
sy
s
t
e
m
ro
u
t
e
s
tr
a
f
f
i
c
th
r
u
su
r
r
o
u
n
d
i
n
g
neighborhoods
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
16
‐2:
Re
d
e
s
i
g
n
in
t
e
r
c
h
a
n
g
e
to
al
l
e
v
i
a
t
e
tr
a
f
f
i
c
on
ne
i
g
h
b
o
r
h
o
o
d
streets
In
c
r
e
a
s
e
d
tr
a
f
f
i
c
vo
l
u
m
e
at
Sa
n
t
a
Ro
s
a
NB
o
n
/
o
f
f
r
a
m
p
s
(O
s
o
s
S
t
)
16
-
1
.
E
x
i
s
t
i
n
g
F
r
e
e
w
a
y
A
c
c
e
s
s
T
h
r
o
u
g
h
N
e
i
g
h
b
o
r
h
o
o
d
s
1
6
-
2
.
P
o
t
e
n
t
i
a
l
f
o
r
R
a
m
p
C
l
o
s
u
r
e
Page N-30 Appendix N, Sensitivity Analysis
Sa
n
t
a
Ro
s
a
& Fo
o
t
h
i
l
l
Vi
c
i
n
i
t
y
Fo
o
t
h
i
l
l
B
l
v
d
Broad St
Bo
y
s
e
n
A
v
e
St
e
n
n
e
r
G
l
e
n
St
u
d
e
n
t
H
o
u
s
i
n
g
Ro
u
g
e
o
t
P
l
17
18
IS
S
U
E
S
‐
Bo
y
s
e
n
A
v
e
.
Pedestrian Crossings
‐
Aw
k
w
a
r
d
Intersections
AL
B
E
R
T
S
O
N
S
FI
R
E
DE
P
T
.
CA
L
PO
L
Y
AG
FI
E
L
D
S
Appendix N, Sensitivity Analysis Page N-31
17
.
Pe
d
e
s
t
r
i
a
n
Ac
c
e
s
s
Ne
a
r
Fo
o
t
h
i
l
l
Blvd
17
-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
17
-
2
.
O
v
e
r
/
U
n
d
e
r
P
a
s
s
C
r
o
s
s
i
n
g
Fo
o
t
h
i
l
l
B
l
v
d
St
e
n
n
e
r
G
l
e
n
St
u
d
e
n
t
H
o
u
s
i
n
g
17
-
3
.
B
o
y
s
e
n
A
c
c
e
s
s
C
l
o
s
u
r
e
–
B
i
k
e
s
&
P
e
d
A
c
c
e
s
s
O
n
l
y
Is
s
u
e
s
:
‐
Pe
d
e
s
t
r
i
a
n
s
ja
y
w
a
l
k
ac
r
o
s
s
Sa
n
t
a
Ro
s
a
St
r
e
e
t
north of Foothill Blvd
‐
Fu
t
u
r
e
Ca
l
P
o
l
y
M
a
s
t
e
r
Pl
a
n
Pe
d
e
s
t
r
i
a
n
& Bi
k
e
Connections
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
17
‐2:
En
h
a
n
c
e
sa
f
e
t
y
fo
r
al
l
mo
d
e
s
Fo
l
l
o
w
s
ex
i
s
t
i
n
g
pa
t
h
w
a
y
pr
e
f
e
r
r
e
d
by
pe
d
e
s
t
r
i
a
n
s
Co
u
l
d
pr
o
v
i
d
e
na
t
u
r
a
l
da
y
l
i
g
h
t
in
tu
n
n
e
l
wi
t
h
op
e
n
i
n
g
along median
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
Si
t
e
17
‐3:
Po
t
e
n
t
i
a
l
cl
o
s
u
r
e
of
Bo
y
s
e
n
at
Sa
n
t
a
Ro
s
a
to
fu
r
t
h
e
r
enhance or provide for
ov
e
r
or
un
d
e
r
pa
s
s
cr
o
s
s
i
n
g
.
Bo
y
s
e
n
A
v
e
Fo
o
t
h
i
l
l
B
l
v
d
St
e
n
n
e
r
G
l
e
n
St
u
d
e
n
t
H
o
u
s
i
n
g
Bo
y
s
e
n
A
v
e
Fo
o
t
h
i
l
l
B
l
v
d
St
e
n
n
e
r
G
l
e
n
St
u
d
e
n
t
H
o
u
s
i
n
g
Bo
y
s
e
n
A
v
e
CL
U
B
24
GY
M
CL
U
B
24
GY
M
CL
U
B
24
GY
M
CH
E
V
R
O
N
CH
E
V
R
O
N
Page N-32 Appendix N, Sensitivity Analysis
18
-
2
.
C
h
o
r
r
o
R
e
a
l
i
g
n
m
e
n
t
18
-
3
.
B
r
o
a
d
&
B
o
y
s
e
n
R
e
a
l
i
g
n
m
e
n
t
Is
s
u
e
:
Fo
o
t
h
i
l
l
Bl
v
d
an
d
Ch
o
r
r
o
S
t
r
e
e
t
in
t
e
r
s
e
c
t
i
o
n
is skewed; volumes at
Fo
o
t
h
i
l
l
Bl
v
d
an
d
Sa
n
t
a
Ro
s
a
St
r
e
e
t
in
t
e
r
s
e
c
t
i
o
n
eventually will exceed capacity
of
cu
r
r
e
n
t
ge
o
m
e
t
r
y
Ge
n
e
r
a
l
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
:
Be
t
t
e
r
si
g
h
t
l
i
n
e
s
fo
r
dr
i
v
e
r
s
at
ri
g
h
t
in
t
e
r
s
e
c
t
i
o
n
than at skewed intersection
Re
a
l
i
g
n
m
e
n
t
of
Ch
o
r
r
o
S
t
r
e
e
t
wo
u
l
d
re
d
u
c
e
pe
d
e
s
t
r
i
a
n
crossing time along
Fo
o
t
h
i
l
l
Bl
v
d
Co
o
r
d
i
n
a
t
i
o
n
wi
t
h
Ca
l
t
r
a
n
s
at
Fo
o
t
h
i
l
l
Bl
v
d
an
d
Santa Rosa Street
In
c
r
e
a
s
e
ca
p
a
c
i
t
y
of
in
t
e
r
s
e
c
t
i
o
n
at
Fo
o
t
h
i
l
l
Bl
v
d
and Santa Rosa Street
Co
s
t
s
fo
r
in
t
e
r
s
e
c
t
i
o
n
im
p
r
o
v
e
m
e
n
t
s
an
d
ma
i
n
t
e
n
a
n
c
e
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
18
‐2:
Ro
u
n
d
a
bo
u
t
s ca
n
be
de
s
i
g
n
e
d
sa
f
e
l
y
to
ac
c
o
m
m
o
d
a
t
e
all modes, including
pe
d
e
s
t
r
i
a
n
s
an
d
bi
c
y
c
l
i
s
t
s
Ri
g
h
t
‐of
‐wa
y
ap
p
e
a
r
s
to
be
ad
e
q
u
a
t
e
fo
r
ro
u
n
d
a
b
o
u
t design
Ro
u
n
d
a
b
o
u
t pr
e
c
l
u
d
e
s
ve
h
i
c
u
l
a
r
tr
a
f
f
i
c
fr
o
m
sp
e
e
d
i
n
g
through intersection
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
18
‐3:
Im
p
a
c
t
s
to
bu
i
l
d
i
n
g
s
an
d
pr
o
p
e
r
t
i
e
s
Im
p
a
c
t
to
ad
j
a
c
e
n
t
fi
r
e
st
a
t
i
o
n
Fo
o
t
h
i
l
l
B
l
v
d
Broad St
Fo
o
t
h
i
l
l
B
l
v
d
Broad St
18
.
Ve
h
i
c
u
l
a
r
Ac
c
e
s
s
Ne
a
r
Fo
o
t
h
i
l
l
Blvd
Fo
o
t
h
i
l
l
B
l
v
d
Broad St
18
-
1
.
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
CL
U
B
24
GY
M
CH
E
V
R
O
N
CL
U
B
24
GY
M
CHEVRON
CL
U
B
24
GY
M
CH
E
V
R
O
N
Appendix N, Sensitivity Analysis Page N-33
Bi
c
y
c
l
e
Ci
r
c
u
l
a
t
i
o
n
–
B
i
c
y
c
l
e
Tr
a
n
s
p
o
r
t
a
t
i
o
n
Pl
a
n
1-
1
.
Ta
n
k
F
a
r
m
R
o
a
d
Fo
o
t
h
i
l
l
C
o
r
r
i
d
o
r
Ci
t
y
Bi
k
e
Pl
a
n
Ro
u
t
e
s
in
d
i
c
a
t
e
d
as
hi
g
h
priority at Future Fair
Is
s
u
e
:
Bi
c
y
c
l
e
co
n
n
e
c
t
i
v
i
t
y
co
u
l
d
be
im
p
r
o
v
e
d
ci
t
y
w
i
d
e
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
Bi
c
y
c
l
e
Ci
r
c
u
l
a
t
i
o
n
:
Co
n
s
i
d
e
r
an
al
t
e
r
n
a
t
i
v
e
to
co
n
v
e
r
t
on
e
la
n
e
on
Hi
g
u
e
r
a
to
a bi
k
e
la
n
e
be
t
w
e
e
n
Jo
h
n
s
o
n
an
d
Ni
p
o
m
o
.
Lo
o
k
fo
r
op
t
i
o
n
s
to
co
m
p
l
e
t
e
th
e
co
n
n
e
c
t
i
o
n
of
Ma
d
o
n
n
a
Ro
a
d
to
La
g
u
n
a
Mi
d
d
l
e
Sc
h
o
o
l
.
Page N-34 Appendix N, Sensitivity Analysis
Ci
t
y
Wi
d
e
Is
s
u
e
:
Tr
u
c
k
Ro
u
t
e
s
co
n
t
i
n
u
e
d
Is
s
u
e
:
He
a
v
y
tr
u
c
k
s
do
no
t
ke
e
p
to
id
e
n
t
i
f
i
e
d
tr
u
c
k
ro
u
t
e
s
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
Tr
u
c
k
Ro
u
t
e
s
:
So
m
e
le
g
a
l
li
m
i
t
a
t
i
o
n
s
to
ma
n
d
a
t
i
n
g
tr
u
c
k
s
us
e
on
l
y
ce
r
t
a
i
n
st
r
e
e
t
s
Tr
u
c
k
s
pa
r
k
on
lo
c
a
l
st
r
e
e
t
s
ov
e
r
n
i
g
h
t
Ci
t
y
‐ap
p
r
o
v
e
d
Tr
u
c
k
Ro
u
t
e
s
Appendix N, Sensitivity Analysis Page N-35
Ci
t
y
Wi
d
e
Is
s
u
e
:
Ga
t
e
w
a
y
s
Ga
t
e
w
a
y
s
in
t
o
th
e
Ci
t
y
Is
s
u
e
:
Ga
t
e
w
a
y
s
;
id
e
n
t
i
f
i
c
a
t
i
o
n
of
Sa
n
Lu
i
s
Ob
i
s
p
o
as
pe
o
p
l
e
en
t
e
r
th
e
ci
t
y
Di
s
c
u
s
s
i
o
n
Po
i
n
t
s
on
Ga
t
e
w
a
y
s
:
Wh
a
t
ot
h
e
r
lo
c
a
t
i
o
n
s
ar
e
ap
p
r
o
p
r
i
a
t
e
fo
r
ga
t
e
w
a
y
im
p
r
o
v
e
m
e
n
t
s
?
Ga
t
e
w
a
y
im
p
r
o
v
e
m
e
n
t
s
ma
y
in
c
l
u
d
e
:
La
n
d
s
c
a
p
e
d
me
d
i
a
n
s
Wa
y
f
i
n
d
i
n
g
s
i
g
n
a
g
e
We
l
c
o
m
e
si
g
n
a
g
e
Ar
c
h
e
s
Li
g
h
t
i
n
g
en
h
a
n
c
e
m
e
n
t
s
Pa
v
e
m
e
n
t
fe
a
t
u
r
e
s
Si
d
e
w
a
l
k
li
g
h
t
i
n
g
Di
f
f
e
r
e
n
t
ty
p
e
s
of
pa
v
e
m
e
n
t
fo
r
cr
o
s
s
w
a
l
k
s
Ex
i
s
t
i
n
g
Ga
t
e
w
a
y
Pr
o
p
o
s
e
d
Ga
t
e
w
a
y
Lo
c
a
t
i
o
n
Page N-36 Appendix N, Sensitivity Analysis
S.
Oc
e
a
n
a
i
r
e
Ne
i
g
h
b
o
r
h
o
o
d
Co
n
n
e
c
t
i
o
n
to
Fr
o
o
m
(P
r
i
o
r
lo
c
a
t
i
o
n
)
Appendix N, Sensitivity Analysis Page N-37
Page N-38 Appendix N, Sensitivity Analysis
Please see the next page.
city of san luis obispo
General plan Update
www.slo2035.com
General Plan Update Project #: 172760
June 29, 2014 Page 1
Kittelson & Associates, Inc. Sacramento, CA
TECHNICAL MEMORANDUM
City of San Luis Obispo
General Plan Update
Sensitivity Analyses of the Roadway Improvements
City of San Luis Obispo, Central Coast Transportation Consulting, Kittelson & Associates Inc.
Date: June 29, 2014 Project #: 172760
To: Jake Hudson, City of San Luis Obispo
From: Jim Damkowitch, Franklin Cai, T.E.
cc:
As shown in Section 2.0, of the DEIR Project Description (Tables 2.4‐2 and 2.5‐1, respectively), the
proposed LUCE Update includes sixteen potential development areas (including the South Broad Street
Special Planning Area) and seventeen proposed street network changes. The latter entails changes to
the physical transportation assets of the City of San Luis Obispo. This includes new roadway connections
(new centerline miles of roadway), one‐way to two‐way conversions, realignments, over‐crossings, new
interchanges and road/ramp closures. A complete listing of the candidate improvements are provided
on the following page.
All the listed improvements are reflected in the General Plan DEIR Maximum Build‐Out alternative.
Many of these improvements have been included or considered as part of past planning studies
performed for or by the City of San Luis Obispo – including the existing General Plan. The project
description adopted by Council included multiple options for various projects, therefore a circulation
network which represented the maximum build of those options was studied and a sensitivity analysis of
the various alternative options was conducted. The purpose of this memorandum is to detail the
sensitivity analysis of the individual options. Using the 2035 Maximum Build‐Out condition as the basis,
each proposed roadway improvement was analyzed in isolation to determine its operational efficiency
and impact to the surrounding street network.
The operational software SYNCHRO was used to evaluate study intersections adjacent to each
improvement. Intersection LOS, turn movement LOS and 95th percentile queues were analyzed with and
without the improvement. Segment LOS was also determined based on the City’s daily thresholds.
The results of each assessment informed the City which improvements should be advanced for inclusion
in the proposed General Plan.
General Plan Update Project #: 172760
June 29, 2014 Page 2
Kittelson & Associates, Inc. Sacramento, CA
Circulation Areas of Change Considered for Inclusion for the Proposed Project:
Prado Road (Full interchange with phased implementation)
Bishop Extension
Orcutt Overpass (not analyzed as part of this analysis)
LOVR By‐Pass
Hwy 1/Hwy 101 &Broad ramp closures
Marsh/Higuera ‐ 2 way
Mission Plaza Expansion
Madonna –Realign
Chorro & Broad – Realign
Boysen & Santa Rosa (Includes grade‐separated crossing for bike/ped. Include turn restrictions
Bianchi/Pismo/Higuera Realignment
New collector – Tank Farm to Buckley
DT Transit Center (not analyzed as part of this analysis)
Calle Joaquin connection to Dalidio Dr
Vachel Realign (not analyzed as part of this analysis)
Victoria Connection (not analyzed as part of this analysis)
Broad Street – Consolidate access
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
3
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Th
e
fo
l
l
o
w
i
n
g
pr
o
v
i
d
e
s
th
e
op
e
r
a
t
i
o
n
a
l
su
m
m
a
r
i
e
s
of
th
e
ad
j
a
c
e
n
t
fa
c
i
l
i
t
i
e
s
wh
e
n
th
e
ef
f
e
c
t
of
ea
c
h
im
p
r
o
v
e
m
e
n
t
is
te
s
t
e
d
:
A.
Bu
i
l
d
Pr
a
d
o
Rd
.
Ov
e
r
p
a
s
s
On
l
y
& El
i
m
i
n
a
t
e
Pl
a
n
n
e
d
Ra
m
p
s
WI
T
H
RA
M
P
S
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Ma
r
s
h
& Hi
g
u
e
r
a
21
0
0
17
.
9
B ‐
26
0
7
86
.
1
F
EBT,NBR,SBT
Ma
d
o
n
n
a
& Hi
g
u
e
r
a
26
3
4
33
.
8
C ‐
32
4
5
71
.
5
E
EBLT,NBLT, SBT
Ma
d
o
n
n
a
& NB
10
1
17
6
9
8.
7
A ‐
21
9
1
18
.
4
B ‐
Ma
d
o
n
n
a
& SB
10
1
19
6
5
23
.
5
C ‐
24
3
2
29
.
4
C ‐
Pr
a
d
o
& Hi
g
u
e
r
a
43
8
8
49
.
1
D
WB
L
,
N
B
L
T
R
,
S
B
L
T
48
3
9
35
.
6
D
NBL
LO
V
R
& Hi
g
u
e
r
a
24
5
1
17
.
4
B ‐
26
0
7
21
.
2
C ‐
LO
V
R
& NB
10
1
27
3
2
45
.
7
D
NB
L
37
8
1
57
.
8
E
EBT, WBL, NBL
LO
V
R
& Ca
l
l
e
Jo
a
q
u
i
n
/ SB
10
1
31
6
6
24
.
2
C ‐
44
3
3
40
.
3
D
WBT, SBL
WI
T
H
O
U
T
RA
M
P
S
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Ma
r
s
h
& Hi
g
u
e
r
a
29
3
8
64
.
8
E
EB
T
,
NB
L
,
SB
T
29
0
9
15
1
.
1
F
EBT,NBL,SBT
Ma
d
o
n
n
a
& Hi
g
u
e
r
a
34
0
0
10
4
.
3
F
EB
L
T
,
NB
L
T
,
S
B
T
33
0
7
10
4
.
3
F
EBLT,NBLT,SBT
Ma
d
o
n
n
a
& NB
10
1
24
5
4
13
.
1
B ‐
30
4
0
22
.
6
C ‐
Ma
d
o
n
n
a
& SB
10
1
27
1
5
29
.
2
C ‐
30
7
3
39
.
4
D
EBL
Pr
a
d
o
& Hi
g
u
e
r
a
36
2
9
61
.
5
E
WB
L
,
N
B
L
T
,
S
B
L
T
38
6
0
22
.
1
C
NBL
LO
V
R
& Hi
g
u
e
r
a
29
2
0
50
.
4
D
NB
L
31
0
5
44
.
1
D
SBR
LO
V
R
& NB
10
1
31
5
0
84
.
1
F
EB
T
,
WB
L
,
NB
L
43
1
0
10
1
.
0
F
EBT,WBLT,NBLR
LO
V
R
& Ca
l
l
e
Jo
a
q
u
i
n
/ SB
10
1
34
4
5
30
.
0
C
EB
L
46
9
1
75
.
2
E
EBL,WBL,NBLT,SBL
Impacted Intersections
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
4
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
Wi
t
h
o
u
t
Ra
m
p
s
:
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
Re
s
u
l
t
i
n
g
Fr
o
m
Ra
m
p
El
i
m
i
n
a
t
i
o
n
:
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
5
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Fi
n
d
i
n
g
El
i
m
i
n
a
t
i
n
g
a pl
a
n
n
e
d
fu
l
l
in
t
e
r
c
h
a
n
g
e
re
d
i
s
t
r
i
b
u
t
e
s
tr
a
f
f
i
c
to
th
e
LO
V
R
,
Ma
d
o
n
n
a
,
& Ma
r
s
h
/
H
i
g
u
e
r
a
In
t
e
r
c
h
a
n
g
e
s
ca
u
s
i
n
g
volumes at those
in
t
e
r
c
h
a
n
g
e
s
an
d
su
r
r
o
u
n
d
i
n
g
in
t
e
r
s
e
c
t
i
o
n
to
op
e
r
a
t
e
be
l
o
w
le
v
e
l
of
se
r
v
i
c
e
th
r
e
s
h
o
l
d
s
.
Du
e
to
th
e
s
e
po
t
e
n
t
i
a
l
im
p
a
c
t
s
it
’
s
recommended that
th
e
pl
a
n
n
e
d
fu
l
l
ac
c
e
s
s
In
t
e
r
c
h
a
n
g
e
at
Pr
a
d
o
Rd
.
sh
o
u
l
d
no
t
ch
a
n
g
e
at
th
i
s
ti
m
e
.
Ad
d
i
t
i
o
n
a
l
de
t
a
i
l
e
d
su
b
a
r
e
a
tr
a
f
f
i
c
an
a
l
y
s
i
s
will be conducted as
pa
r
t
of
ad
j
a
c
e
n
t
de
v
e
l
o
p
m
e
n
t
;
th
e
s
e
st
u
d
i
e
s
ma
y
id
e
n
t
i
f
y
ot
h
e
r
se
c
o
n
d
a
r
y
im
p
r
o
v
e
m
e
n
t
s
th
a
t
wo
u
l
d
al
l
o
w
fo
r
th
e
el
i
m
i
n
a
t
i
o
n
of the ramps.
B.
El
i
m
i
n
a
t
e
Pl
a
n
n
e
d
Bi
s
h
o
p
St
r
e
e
t
Ex
t
e
n
s
i
o
n
:
WI
T
H
BI
S
H
O
P
ST
R
E
E
T
EX
T
E
N
S
I
O
N
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Sa
n
Lu
i
s
Dr
i
v
e
& Jo
h
n
s
o
n
20
9
9
21
C ‐
22
6
7
18
B ‐
Br
o
a
d
& Or
c
u
t
t
31
2
7
18
B
NB
L
38
8
27
C
SBL
Br
o
a
d
& So
u
t
h
/ Sa
n
t
a
Ba
r
b
a
r
a
38
6
8
10
6
F
AL
L
39
1
8
52
D
EBT,WBL,WBT,NBL,SBL
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
Ma
x
.
Th
r
e
s
h
o
l
d
Exceeds Threshold
Pi
s
m
o
4,
0
0
0
3,
0
0
0
YES
Bu
c
h
o
n
3,
0
0
0
3,
0
0
0
NO
WI
T
H
O
U
T
BI
S
H
O
P
ST
R
E
E
T
EX
T
E
N
S
I
O
N
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Sa
n
Lu
i
s
Dr
i
v
e
& Jo
h
n
s
o
n
23
3
4
21
.
5
C ‐
22
6
7
18
B ‐
Br
o
a
d
& Or
c
u
t
t
30
3
3
19
.
7
B
NB
L
38
8
27
C
SBL
Br
o
a
d
& So
u
t
h
/ Sa
n
t
a
Ba
r
b
a
r
a
36
6
3
54
.
4
D
EB
T
,
W
B
L
T
,
N
B
L
,
B
S
L
T
39
1
8
52
D
EBT,WBL,WBT,NBL,SBL
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
Ma
x
.
Th
r
e
s
h
o
l
d
Exceeds Threshold
Pi
s
m
o
6,
0
0
0
3,
0
0
0
YES
Bu
c
h
o
n
4,
0
0
0
3,
0
0
0
YES
Im
p
a
c
t
e
d
Intersections/Segments
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
6
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
Re
s
u
l
t
i
n
g
Fr
o
m
El
i
m
i
n
a
t
i
o
n
of
Ex
t
e
n
s
i
o
n
:
Fi
n
d
i
n
g
El
i
m
i
n
a
t
i
o
n
of
th
e
pl
a
n
n
e
d
Bi
s
h
o
p
St
r
e
e
t
Co
n
n
e
c
t
i
o
n
wo
u
l
d
re
d
u
c
e
pr
o
j
e
c
t
e
d
tr
a
f
f
i
c
co
n
g
e
s
t
i
o
n
at
Br
o
a
d
& So
u
t
h
/
S
a
n
t
a
Barbara to acceptable
le
v
e
l
s
.
Ho
w
e
v
e
r
,
El
i
m
i
n
a
t
i
o
n
of
th
e
ex
t
e
n
s
i
o
n
wo
u
l
d
al
s
o
pu
s
h
ad
d
i
t
i
o
n
a
l
tr
a
f
f
i
c
in
t
o
th
e
Pi
s
m
o
& Bu
c
h
o
n
ne
i
g
h
b
o
r
h
o
o
d
s
such that volumes
wo
u
l
d
ex
c
e
e
d
ac
c
e
p
t
a
b
l
e
le
v
e
l
s
.
Th
e
r
e
f
o
r
e
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
e
pl
a
n
n
e
d
Bi
s
h
o
p
St
r
e
e
t
ex
t
e
n
s
i
o
n
no
t
be
ch
a
n
g
e
d
at
this time. Given the
co
s
t
,
de
s
i
g
n
di
f
f
i
c
u
l
t
i
e
s
,
an
d
ot
h
e
r
op
e
r
a
t
i
o
n
a
l
im
p
r
o
v
e
m
e
n
t
s
it
’
s
al
s
o
su
g
g
e
s
t
e
d
th
a
t
th
e
fo
l
l
o
w
i
n
g
po
l
i
c
y
be
ad
d
e
d
:
“T
h
e
Ci
t
y
sh
a
l
l
co
n
d
u
c
t
a de
t
a
i
l
e
d
su
b
a
r
e
a
tr
a
f
f
i
c
an
a
l
y
s
i
s
to
de
t
e
r
m
i
n
e
if
se
c
o
n
d
a
r
y
me
a
s
u
r
e
s
ca
n
be
ma
d
e
to
al
l
o
w
fo
r
el
i
m
i
n
a
t
i
o
n
of the Bishop
St
r
e
e
t
Ex
t
e
n
s
i
o
n
an
d
pr
o
t
e
c
t
i
o
n
of
ne
i
g
h
b
o
r
h
o
o
d
tr
a
f
f
i
c
le
v
e
l
s
.
”
So
u
t
h
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
7
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
C.
El
i
m
i
n
a
t
e
Pl
a
n
n
e
d
Or
c
u
t
t
Ra
i
l
r
o
a
d
Ov
e
r
p
a
s
s
Fi
n
d
i
n
g
Th
e
Or
c
u
t
t
Ra
i
l
r
o
a
d
Ov
e
r
p
a
s
s
wa
s
in
i
t
i
a
l
l
y
pl
a
n
n
e
d
in
or
d
e
r
to
ad
d
r
e
s
s
de
l
a
y
s
re
s
u
l
t
i
n
g
fo
r
tr
a
i
n
s
st
o
p
p
e
d
on
th
e
tr
a
c
k
s
bl
o
c
k
i
n
g
traffic. Since this
pl
a
n
wa
s
ad
o
p
t
e
d
ra
i
l
tr
a
f
f
i
c
ha
s
ch
a
n
g
e
d
an
d
th
e
s
e
ty
p
e
s
of
oc
c
u
r
r
e
n
c
e
s
ar
e
no
w
ra
r
e
.
Al
s
o
in
t
e
r
i
m
im
p
r
o
v
e
m
e
n
t
s
ha
v
e
been implemented that
fu
l
l
y
ad
d
r
e
s
s
al
l
cu
r
r
e
n
t
an
d
fo
r
e
c
a
s
t
e
d
op
e
r
a
t
i
o
n
s
.
Ho
w
e
v
e
r
,
be
c
a
u
s
e
ra
i
l
tr
a
f
f
i
c
is
ou
t
s
i
d
e
th
e
Ci
t
y
'
s
co
n
t
r
o
l
an
d
co
u
l
d
re
s
u
m
e
to prior
co
n
d
i
t
i
o
n
s
,
ch
a
n
g
i
n
g
th
e
cu
r
r
e
n
t
pl
a
n
n
e
d
ov
e
r
p
a
s
s
is
no
t
re
c
o
m
m
e
n
d
e
d
at
th
i
s
ti
m
e
.
D.
Ad
d
Lo
s
Os
o
s
Va
l
l
e
y
Ro
a
d
By
p
a
s
s
WI
T
H
O
U
T
LO
V
R
BY
P
A
S
S
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Bu
c
k
l
e
y
& By
p
a
s
s
‐
LO
V
R
& Hi
g
u
e
r
a
25
4
9
20
C
No
n
e
36
5
8
87
F
NBL,SBTR
By
p
a
s
s
& LO
V
R
‐
WI
T
H
LO
V
R
BY
P
A
S
S
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Bu
c
k
l
e
y
& By
p
a
s
s
13
7
0
14
B ‐
21
8
0
18
B ‐
LO
V
R
& Hi
g
u
e
r
a
22
2
9
13
B ‐
26
2
7
21
C ‐
By
p
a
s
s
& LO
V
R
18
6
0
11
B ‐
27
7
0
29
C
NBL
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
8
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
Re
s
u
l
t
i
n
g
Fr
o
m
Ad
d
i
t
i
o
n
of
By
p
a
s
s
:
Fi
n
d
i
n
g
Ad
d
i
t
i
o
n
of
th
e
LO
V
R
By
p
a
s
s
im
p
r
o
v
e
s
th
e
in
t
e
r
s
e
c
t
i
o
n
op
e
r
a
t
i
o
n
s
of
LO
V
R
& Hi
g
u
e
r
a
,
ho
w
e
v
e
r
ot
h
e
r
sm
a
l
l
e
r
sc
a
l
e
me
a
s
u
r
e
s
already identified
as
pa
r
t
of
th
e
Ch
e
v
r
o
n
dr
a
f
t
EI
R
ac
c
o
m
p
l
i
s
h
a si
m
i
l
a
r
im
p
r
o
v
e
m
e
n
t
.
A by
p
a
s
s
wo
u
l
d
re
d
u
c
e
de
l
a
y
s
fo
r
re
s
i
d
e
n
t
s
ex
i
t
i
n
g
Lo
s
Verdes and a roadway
in
th
i
s
ar
e
a
wo
u
l
d
be
ne
e
d
e
d
to
pr
o
v
i
d
e
ac
c
e
s
s
to
de
v
e
l
o
p
m
e
n
t
al
o
n
g
th
i
s
co
r
r
i
d
o
r
.
Ho
w
e
v
e
r
,
th
e
by
p
a
s
s
wo
u
l
d
ha
v
e
po
t
e
n
t
i
a
l
creek, noise, and
fa
r
m
l
a
n
d
im
p
a
c
t
s
.
Al
s
o
th
e
By
p
a
s
s
wo
u
l
d
be
an
ov
e
r
a
l
l
ne
t
ne
u
t
r
a
l
ci
r
c
u
l
a
t
i
o
n
pr
o
j
e
c
t
wi
t
h
a lo
w
co
s
t
/
b
e
n
e
f
i
t
ra
t
i
o
.
Th
e
r
e
f
o
r
e
based on the
po
t
e
n
t
i
a
l
im
p
a
c
t
s
an
d
lo
c
a
l
i
z
e
d
be
n
e
f
i
t
it
’
s
no
t
re
c
o
m
m
e
n
d
e
d
th
a
t
a ro
a
d
w
a
y
be
si
t
e
pl
a
n
n
e
d
an
d
ap
p
r
o
v
e
d
as
a ca
p
i
t
a
l
project at this point.
Ra
t
h
e
r
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
e
fo
l
l
o
w
i
n
g
po
l
i
c
y
be
ad
d
e
d
to
al
l
o
w
fo
r
pl
a
n
n
i
n
g
an
d
im
p
l
e
m
e
n
t
a
t
i
o
n
of
a ro
a
d
w
a
y
as
part of adjacent
de
v
e
l
o
p
m
e
n
t
:
"D
e
v
e
l
o
p
m
e
n
t
wi
t
h
i
n
th
e
ar
e
a
bo
u
n
d
by
Hw
y
10
1
,
Lo
s
Os
o
s
Va
l
l
e
y
Ro
a
d
,
& Hi
g
u
e
r
a
st
r
e
e
t
sh
a
l
l
in
c
o
r
p
o
r
a
t
e
a ne
w
ro
a
d
w
a
y
connection in some
fo
r
m
fr
o
m
Lo
s
Os
o
s
Va
l
l
e
y
Ro
a
d
to
Hi
g
u
e
r
a
.
"
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
9
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
E.
Ad
d
In
t
e
r
c
h
a
n
g
e
Up
g
r
a
d
e
s
at
SR
‐1 an
d
SR
‐10
1
:
1
WI
T
H
O
U
T
IN
T
E
R
C
H
A
N
G
E
UP
G
R
A
D
E
S
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Sa
n
t
a
Ro
s
a
& Ol
i
v
e
31
6
2
20
.
9
C
SB
L
37
0
5
15
.
4
B ‐
Sa
n
t
a
Ro
s
a
& Wa
l
n
u
t
26
2
2
42
.
1
D
WB
R
28
9
1
43
.
8
D
WBR,SBL
Hw
y
1 & 10
1
‐
Lo
c
a
l
/
C
o
l
l
e
c
t
o
r
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
Ma
x
.
Th
r
e
s
h
o
l
d
Exceeds Threshold
Wa
l
n
u
t
E/
Sa
n
t
a
Ro
s
a
9,
0
0
0
3,
0
0
0
YES
Ol
i
v
e
E/
Sa
n
t
a
Ro
s
a
4,
0
0
0
5,
0
0
0
YES
Wa
l
n
u
t
W/
Sa
n
t
a
Ro
s
a
10
,
1
0
0
3,
0
0
0
YES
Ar
t
e
r
i
a
l
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
LO
S
Exceeds Threshold
Ol
i
v
e
W/
Sa
n
t
a
Ro
s
a
10
,
2
0
0
C
NO
Sa
n
t
a
Ro
s
a
N/
10
1
44
,
0
0
0
F
YES
Sa
n
t
a
Ro
s
a
S/
10
1
23
,
0
0
0
D
NO
WI
T
H
IN
T
E
R
C
H
A
N
G
E
UP
G
R
A
D
E
S
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Sa
n
t
a
Ro
s
a
& Ol
i
v
e
32
8
2
14
.
3
B ‐
41
8
6
2.
3
C
NBL
Sa
n
t
a
Ro
s
a
& Wa
l
n
u
t
22
0
0
15
B ‐
24
3
4
15
.
6
B ‐
Hw
y
1 & 10
1
56
6
7
34
.
1
C
SB
L
,
NB
L
56
5
5
45
.
9
D
SBL, NBL
Lo
c
a
l
/
C
o
l
l
e
c
t
o
r
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
Ma
x
.
Th
r
e
s
h
o
l
d
Exceeds Threshold
Wa
l
n
u
t
E/
Sa
n
t
a
Ro
s
a
5,
2
0
0
3,
0
0
0
YES
Ol
i
v
e
E/
Sa
n
t
a
Ro
s
a
2,
0
0
0
5,
0
0
0
NO
Wa
l
n
u
t
W/
Sa
n
t
a
Ro
s
a
7,
6
0
0
3,
0
0
0
YES
Ar
t
e
r
i
a
l
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
LO
S
Exceeds Threshold
Ol
i
v
e
W/
Sa
n
t
a
Ro
s
a
2,
2
0
0
A
NO
Sa
n
t
a
Ro
s
a
N/
10
1
48
,
0
0
0
F
YES
Sa
n
t
a
Ro
s
a
S/
10
1
30
,
0
0
0
D
NO
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
10
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
wi
t
h
In
t
e
r
c
h
a
n
g
e
Up
g
r
a
d
e
s
:
Fi
n
d
i
n
g
Th
e
cu
r
r
e
n
t
in
t
e
r
c
h
a
n
g
e
is
pr
o
j
e
c
t
e
d
to
ha
v
e
ma
n
y
op
e
r
a
t
i
o
n
a
l
is
s
u
e
s
an
d
ne
i
g
h
b
o
r
h
o
o
d
im
p
a
c
t
s
by
20
3
5
,
up
g
r
a
d
e
s
to
th
e
interchange such as
co
n
v
e
r
s
i
o
n
to
a si
g
n
a
l
po
i
n
t
ur
b
a
n
in
t
e
r
c
h
a
n
g
e
le
s
s
e
n
th
e
s
e
im
p
a
c
t
s
an
d
op
e
r
a
t
i
o
n
a
l
is
s
u
e
s
.
Th
e
r
e
f
o
r
e
it
’
s
re
c
o
m
m
e
n
d
e
d
that this be added as a
pr
o
j
e
c
t
.
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
11
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
F.
Co
n
v
e
r
t
Hi
g
u
e
r
a
St
r
e
e
t
an
d
Ma
r
s
h
St
r
e
e
t
be
t
w
e
e
n
Sa
n
t
a
Ro
s
a
St
r
e
e
t
an
d
Jo
h
n
s
o
n
Av
e
:
WI
T
H
O
U
T
TW
O
WA
Y
CO
N
V
E
R
S
I
O
N
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Jo
h
n
s
o
n
& Ma
r
s
h
84
9
27
.
1
C ‐
13
3
7
44
.
6
D ‐
Jo
h
n
s
o
n
& Hi
g
u
e
r
a
91
4
14
.
6
B ‐
10
3
0
17
.
5
C ‐
Sa
n
t
a
Ro
s
a
& Ma
r
s
h
11
9
2
10
.
7
B ‐
20
6
2
10
.
6
B ‐
Sa
n
t
a
Ro
s
a
& Hi
g
u
e
r
a
18
0
7
5.
2
A ‐
23
8
2
6.
7
A ‐
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
LO
S
Exceeds Threshold
Ma
r
s
h
5,
0
0
0
A
NO
Hi
g
u
e
r
a
2,
8
0
0
A
NO
Fi
n
d
i
n
g
Cu
r
r
e
n
t
l
y
Ma
r
s
h
& Hi
g
u
e
r
a
st
r
e
e
t
s
be
t
w
e
e
n
Jo
h
n
s
o
n
& Sa
n
t
a
Ro
s
a
ar
e
un
d
e
r
u
t
i
l
i
z
e
d
an
d
un
d
e
r
de
v
e
l
o
p
e
d
wh
i
l
e
pa
r
a
l
l
e
l
neighborhood streets
ar
e
ex
c
e
e
d
i
n
g
vo
l
u
m
e
th
r
e
s
h
o
l
d
s
.
Co
n
v
e
r
s
i
o
n
of
th
e
s
e
st
r
e
e
t
s
fr
o
m
on
e
‐wa
y
to
tw
o
‐wa
y
wi
l
l
im
p
r
o
v
e
th
e
i
r
ut
i
l
i
z
a
t
i
o
n
an
d
draw some traffic from
pa
r
a
l
l
e
l
ne
i
g
h
b
o
r
h
o
o
d
st
r
e
e
t
s
.
In
t
e
r
s
e
c
t
i
o
n
s
an
d
se
g
m
e
n
t
s
ca
n
op
e
r
a
t
i
o
n
a
l
l
y
ac
c
o
m
m
o
d
a
t
e
th
e
co
n
v
e
r
s
i
o
n
.
Th
e
r
e
f
o
r
e
it
’
s
recommended that
th
i
s
be
ad
d
e
d
as
a pr
o
j
e
c
t
.
WI
T
H
TW
O
WA
Y
CO
N
V
E
R
S
I
O
N
In
t
e
r
s
e
c
t
i
o
n
s
AM
Vo
l
u
m
e
AM
De
l
a
y
AM
LO
S
Mo
v
.
Fa
i
l
u
r
e
s
PM
Vo
l
u
m
e
PM
De
l
a
y
PM
LO
S
Mov. Failures
Jo
h
n
s
o
n
& Ma
r
s
h
83
1
6.
8
A ‐
13
6
0
16
.
6
B ‐
Jo
h
n
s
o
n
& Hi
g
u
e
r
a
84
4
19
.
7
C ‐
10
6
3
32
.
3
D ‐
Sa
n
t
a
Ro
s
a
& Ma
r
s
h
13
4
3
12
.
3
B ‐
22
8
9
10
.
8
B ‐
Sa
n
t
a
Ro
s
a
& Hi
g
u
e
r
a
83
1
5.
1
A ‐
26
3
6
8.
1
A ‐
Se
g
m
e
n
t
s
Av
e
r
a
g
e
Da
i
l
y
Tr
a
f
f
i
c
LO
S
Exceeds Threshold
Ma
r
s
h
10
,
0
0
0
C
NO
Hi
g
u
e
r
a
4,
0
0
0
B
NO
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
12
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
G.
Ex
p
a
n
d
Mi
s
s
i
o
n
Pl
a
z
a
:
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
Wi
t
h
Mi
s
s
i
o
n
Pl
a
z
a
Ex
p
a
n
s
i
o
n
:
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
13
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
wi
t
h
Mi
s
s
i
o
n
Pl
a
z
a
ex
p
a
n
s
i
o
n
:
Fi
n
d
i
n
g
Ex
p
a
n
s
i
o
n
of
th
e
Mi
s
s
i
o
n
Pl
a
z
a
ca
u
s
e
s
mi
n
o
r
to
mo
d
e
r
a
t
e
re
d
i
s
t
r
i
b
u
t
i
o
n
s
of
tr
a
f
f
i
c
wi
t
h
i
n
th
e
do
w
n
t
o
w
n
.
Ni
p
o
m
o
St
.
ex
c
e
e
d
s
it level of service
th
r
e
s
h
o
l
d
on
is
o
l
a
t
e
d
bl
o
c
k
s
;
ho
w
e
v
e
r
th
e
ex
p
a
n
s
i
o
n
im
p
r
o
v
e
s
pe
d
e
s
t
r
i
a
n
ac
c
e
s
s
& sa
f
e
t
y
an
d
en
h
a
n
c
e
s
th
e
do
w
n
t
o
w
n
atmosphere. Overall the
ex
p
a
n
s
i
o
n
of
mi
s
s
i
o
n
pl
a
z
a
ca
n
be
ac
c
o
m
m
o
d
a
t
e
d
wi
t
h
th
e
cu
r
r
e
n
t
st
r
e
e
t
ne
t
w
o
r
k
.
Th
e
r
e
f
o
r
e
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
i
s
be added as a project.
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
14
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
H.
Re
a
l
i
g
n
Ma
d
o
n
n
a
at
Hi
g
u
e
r
a
:
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
wi
t
h
Re
a
l
i
g
n
m
e
n
t
:
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
15
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
wi
t
h
Re
a
l
i
g
n
m
e
n
t
:
Fi
n
d
i
n
g
Re
a
l
i
g
n
m
e
n
t
of
Ma
d
o
n
n
a
at
Hi
g
u
e
r
a
is
pr
i
m
a
r
i
l
y
ju
s
t
a ge
o
m
e
t
r
i
c
mo
d
i
f
i
c
a
t
i
o
n
re
s
u
l
t
i
n
g
in
an
ov
e
r
a
l
l
ne
t
ne
u
t
r
a
l
ci
r
c
u
l
a
t
i
o
n
change and a low
co
s
t
/
b
e
n
e
f
i
t
ra
t
i
o
.
Ho
w
e
v
e
r
,
th
e
pr
o
j
e
c
t
wo
u
l
d
im
p
r
o
v
e
in
t
e
r
s
e
c
t
i
o
n
al
i
g
n
m
e
n
t
,
sa
f
e
t
y
,
an
d
op
e
r
a
t
i
o
n
s
.
Al
s
o
th
e
re
a
l
i
g
n
m
e
n
t
could facilitate
gr
e
a
t
e
r
de
v
e
l
o
p
m
e
n
t
of
th
e
tw
o
ad
j
a
c
e
n
t
pr
o
p
e
r
t
i
e
s
.
Th
e
r
e
f
o
r
e
ba
s
e
d
on
th
e
lo
c
a
l
i
z
e
d
be
n
e
f
i
t
it
’
s
no
t
re
c
o
m
m
e
n
d
e
d
th
a
t
realignment be site
pl
a
n
n
e
d
an
d
ap
p
r
o
v
e
d
as
a ca
p
i
t
a
l
pr
o
j
e
c
t
at
th
i
s
po
i
n
t
.
Ra
t
h
e
r
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
e
fo
l
l
o
w
i
n
g
po
l
i
c
y
be
ad
d
e
d
to
al
l
o
w
for planning and
im
p
l
e
m
e
n
t
a
t
i
o
n
as
pa
r
t
of
ad
j
a
c
e
n
t
de
v
e
l
o
p
m
e
n
t
:
"D
e
v
e
l
o
p
m
e
n
t
of
th
e
pr
o
p
e
r
t
i
e
s
No
r
t
h
an
d
So
u
t
h
of
Ma
d
o
n
n
a
Rd
.
We
s
t
of
Hi
g
u
e
r
a
sh
a
l
l
in
c
o
r
p
o
r
a
t
e
a de
t
a
i
l
e
d
ge
o
m
e
t
r
i
c
analysis and associated
im
p
r
o
v
e
m
e
n
t
s
fo
r
Ma
d
o
n
n
a
Ro
a
d
we
s
t
of
Hi
g
u
e
r
a
an
d
th
e
in
t
e
r
s
e
c
t
i
o
n
of
Hi
g
u
e
r
a
an
d
Ma
d
o
n
n
a
"
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
16
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
I.
Re
a
l
i
g
n
Br
o
a
d
,
Ch
o
r
r
o
,
& Bo
y
s
e
n
at
Fo
o
t
h
i
l
l
:
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
Wi
t
h
Re
a
l
i
g
n
m
e
n
t
s
:
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
17
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
wi
t
h
Re
a
l
i
g
n
m
e
n
t
s
:
Fi
n
d
i
n
g
Re
a
l
i
g
n
m
e
n
t
ca
u
s
e
s
vo
l
u
m
e
s
to
de
c
r
e
a
s
e
on
Br
o
a
d
& Sa
n
t
a
Ro
s
a
bu
t
in
c
r
e
a
s
e
on
Ch
o
r
r
o
St
r
e
e
t
su
c
h
th
a
t
Ch
o
r
r
o
St
r
e
e
t
ex
c
e
e
d
s
Neighborhood
vo
l
u
m
e
th
r
e
s
h
o
l
d
s
.
So
m
e
fo
r
m
of
re
a
l
i
g
n
m
e
n
t
of
Br
o
a
d
& Ch
o
r
r
o
wo
u
l
d
im
p
r
o
v
e
in
t
e
r
s
e
c
t
i
o
n
op
e
r
a
t
i
o
n
s
an
d
sa
f
e
t
y
.
Al
s
o
the grade separated
pe
d
e
s
t
r
i
a
n
cr
o
s
s
i
n
g
wo
u
l
d
pr
o
v
i
d
e
im
p
r
o
v
e
d
ac
c
e
s
s
to
& fr
o
m
re
s
i
d
e
n
t
i
a
l
ne
i
g
h
b
o
r
h
o
o
d
s
an
d
th
e
co
m
m
e
r
c
i
a
l
ce
n
t
e
r
to
Ca
l
P
o
l
y
.
The grade
se
p
a
r
a
t
e
d
pe
d
e
s
t
r
i
a
n
is
re
c
o
m
m
e
n
d
e
d
to
be
in
c
l
u
d
e
d
as
a pr
o
e
c
t
,
ho
w
e
v
e
r
du
e
to
th
e
po
t
e
n
t
i
a
l
ne
i
g
h
b
o
r
h
o
o
d
im
p
a
c
t
s
it
’
s
not recommended
th
a
t
re
a
l
i
g
n
m
e
n
t
s
be
si
t
e
pl
a
n
n
e
d
an
d
ap
p
r
o
v
e
d
as
a ca
p
i
t
a
l
pr
o
j
e
c
t
at
th
i
s
po
i
n
t
.
Ra
t
h
e
r
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
e
fo
l
l
o
w
i
n
g
policy be added to
gu
i
d
e
ad
j
a
c
e
n
t
de
v
e
l
o
p
m
e
n
t
:
"D
e
v
e
l
o
p
m
e
n
t
of
Un
i
v
e
r
s
i
t
y
Sq
u
a
r
e
sh
a
l
l
in
c
o
r
p
o
r
a
t
e
a de
t
a
i
l
e
d
ge
o
m
e
t
r
i
c
an
a
l
y
s
i
s
an
d
as
s
o
c
i
a
t
e
d
im
p
r
o
v
e
m
e
n
t
s
fo
r
th
e
intersections of Boysen
& Sa
n
t
a
Ro
s
a
,
Fo
o
t
h
i
l
l
& Ch
o
r
r
o
,
an
d
Fo
o
t
h
i
l
l
&B
r
o
a
d
in
ad
d
i
t
i
o
n
to
an
y
dr
i
v
e
w
a
y
ac
c
e
s
s
po
i
n
t
s
al
o
n
g
Fo
o
t
h
i
l
l
Bl
v
d
.
"
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
18
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
J.
Re
a
l
i
g
n
Hi
g
h
& Pi
s
m
o
at
Hi
g
u
e
r
a
:
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
Wi
t
h
Re
a
l
i
g
n
m
e
n
t
s
:
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
19
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
wi
t
h
Re
a
l
i
g
n
m
e
n
t
s
:
Fi
n
d
i
n
g
Re
a
l
i
g
n
m
e
n
t
of
Hi
g
h
& Pi
s
m
o
at
Hi
g
u
e
r
a
is
pr
i
m
a
r
i
l
y
a lo
c
a
l
i
z
e
d
ge
o
m
e
t
r
i
c
mo
d
i
f
i
c
a
t
i
o
n
re
s
u
l
t
i
n
g
in
an
ov
e
r
a
l
l
ne
t
ne
u
t
r
a
l
circulation change and
a lo
w
pu
b
l
i
c
co
s
t
/
b
e
n
e
f
i
t
ra
t
i
o
.
Ho
w
e
v
e
r
,
th
e
pr
o
j
e
c
t
wo
u
l
d
im
p
r
o
v
e
in
t
e
r
s
e
c
t
i
o
n
al
i
g
n
m
e
n
t
,
sa
f
e
t
y
,
an
d
op
e
r
a
t
i
o
n
s
.
Th
e
r
e
f
o
r
e
based on the
lo
c
a
l
i
z
e
d
be
n
e
f
i
t
an
d
pr
o
p
e
r
t
y
im
p
a
c
t
s
it
’
s
no
t
re
c
o
m
m
e
n
d
e
d
th
a
t
re
a
l
i
g
n
m
e
n
t
be
si
t
e
pl
a
n
n
e
d
an
d
ap
p
r
o
v
e
d
as
a ca
p
i
t
a
l
project at this point.
Ra
t
h
e
r
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
e
fo
l
l
o
w
i
n
g
po
l
i
c
y
be
ad
d
e
d
to
al
l
o
w
fo
r
pl
a
n
n
i
n
g
an
d
im
p
l
e
m
e
n
t
a
t
i
o
n
of
a ro
a
d
w
a
y
as
pa
r
t
of adjacent
de
v
e
l
o
p
m
e
n
t
:
"R
e
‐De
v
e
l
o
p
m
e
n
t
of
pr
o
p
e
r
t
i
e
s
at
th
e
in
t
e
r
s
e
c
t
i
o
n
of
Hi
g
h
& Pi
s
m
o
at
Hi
g
u
e
r
a
sh
a
l
l
in
c
o
r
p
o
r
a
t
e
a de
t
a
i
l
e
d
ge
o
m
e
t
r
i
c
an
a
l
y
s
i
s
and associated
im
p
r
o
v
e
m
e
n
t
s
”
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
20
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
K.
Ad
d
Ne
w
No
r
t
h
/
S
o
u
t
h
Co
l
l
e
c
t
o
r
Be
t
w
e
e
n
Ta
n
k
Fa
r
m
& Bu
c
k
l
e
y
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
wi
t
h
Ne
w
Co
n
n
e
c
t
i
o
n
:
Bu
c
k
l
e
y
Ta
n
k
Fa
r
m
Pr
a
d
o
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
21
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Tr
a
f
f
i
c
Re
d
i
s
t
r
i
b
u
t
i
o
n
wi
t
h
Ne
w
Co
n
n
e
c
t
i
o
n
:
Fi
n
d
i
n
g
A ne
w
No
r
t
h
/
S
o
u
t
h
co
l
l
e
c
t
o
r
be
t
w
e
e
n
Bu
c
k
l
e
y
an
d
Ta
n
k
Fa
r
m
pr
o
v
i
d
e
s
ad
d
i
t
i
o
n
a
l
ac
c
e
s
s
to
Av
i
l
a
Ra
n
c
h
an
d
ad
j
a
c
e
n
t
pr
o
p
e
r
t
i
e
s
and reliefs
tr
a
f
f
i
c
co
n
g
e
s
t
i
o
n
al
o
n
g
S.
Hi
g
u
e
r
a
St
r
e
e
t
.
Th
e
r
e
f
o
r
e
it
’
s
re
c
o
m
m
e
n
d
e
d
th
a
t
th
i
s
be
ad
d
e
d
as
a pr
o
j
e
c
t
.
Th
e
r
e
ma
y
be
po
r
t
i
o
n
s
of this road that
wi
l
l
be
pl
a
n
n
e
d
an
d
co
n
s
t
r
u
c
t
e
d
as
pa
r
t
of
ne
w
de
v
e
l
o
p
m
e
n
t
in
th
e
ar
e
a
.
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
22
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
L.
DT
Tr
a
n
s
i
t
Ce
n
t
e
r
Pr
e
l
i
m
i
n
a
r
y
mo
d
e
l
i
n
g
of
th
e
tr
a
n
s
i
t
ce
n
t
e
r
sh
o
w
e
d
th
a
t
th
e
r
e
wa
s
ne
g
l
i
g
i
b
l
e
im
p
a
c
t
on
ov
e
r
a
l
l
tr
a
n
s
i
t
fo
r
e
c
a
s
t
s
as
a re
s
u
l
t
of relocation or
co
n
s
o
l
i
d
a
t
i
o
n
.
Ho
w
e
v
e
r
co
n
s
o
l
i
d
a
t
i
o
n
of
th
e
tr
a
n
s
i
t
ce
n
t
e
r
is
pr
e
d
i
c
t
e
d
to
ha
v
e
si
g
n
i
f
i
c
a
n
t
op
e
r
a
t
i
o
n
a
l
be
n
e
f
i
t
s
.
Th
e
r
e
f
o
r
e
it’s recommended
th
a
t
th
i
s
be
ad
d
e
d
as
a pr
o
j
e
c
t
th
a
t
wi
l
l
oc
c
u
r
in
co
o
p
e
r
a
t
i
o
n
wi
t
h
SL
O
C
O
G
an
d
RT
A
.
M.
Ex
t
e
n
d
Ca
l
l
e
Jo
a
q
u
i
n
to
Fr
o
o
m
or
Pr
a
d
o
Rd
.
LO
S
& Da
i
l
y
Vo
l
u
m
e
s
wi
t
h
Ne
w
Co
n
n
e
c
t
i
o
n
:
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
23
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
Fi
n
d
i
n
g
Th
e
Ca
l
l
e
Jo
a
q
u
i
n
ex
t
e
n
s
i
o
n
to
Fr
o
o
m
Ra
n
c
h
Wa
y
do
e
s
no
t
dr
a
w
en
o
u
g
h
tr
a
f
f
i
c
to
wa
r
r
a
n
t
th
i
s
ne
w
co
n
n
e
c
t
i
o
n
.
It
’
s
no
t
re
c
o
m
m
e
n
d
e
d
that this
be
in
c
l
u
d
e
d
as
a pr
o
j
e
c
t
or
po
l
i
c
y
.
Ge
n
e
r
a
l
Pl
a
n
Up
d
a
t
e
Pr
o
j
e
c
t
#:
17
2
7
6
0
Ju
n
e
29
,
20
1
4
Pa
g
e
24
Ki
t
t
e
l
s
o
n
& As
s
o
c
i
a
t
e
s
,
In
c
.
Sa
c
r
a
m
e
n
t
o
,
CA
N.
Va
c
h
e
l
Re
a
l
i
g
n
m
e
n
t
Th
i
s
op
t
i
o
n
is
pr
i
m
a
r
i
l
y
a lo
c
a
l
i
z
e
d
ge
o
m
e
t
r
i
c
mo
d
i
f
i
c
a
t
i
o
n
an
d
wh
e
n
co
u
p
l
e
d
wi
t
h
th
e
Bu
c
k
l
e
y
ro
a
d
co
n
n
e
c
t
i
o
n
wo
u
l
d
have negligible impact
on
ov
e
r
a
l
l
ci
r
c
u
l
a
t
i
o
n
.
Th
e
r
e
f
o
r
e
it
’
s
no
t
re
c
o
m
m
e
n
d
e
d
th
a
t
th
i
s
be
in
c
l
u
d
e
d
as
a pr
o
j
e
c
t
or
po
l
i
c
y
.
O.
Vi
c
t
o
r
i
a
Av
e
n
u
e
Co
n
n
e
c
t
i
o
n
Th
e
tr
a
f
f
i
c
an
a
l
y
s
i
s
fr
o
m
th
e
pr
i
o
r
Br
o
a
d
St
.
Co
r
r
i
d
o
r
Pl
a
n
dr
a
f
t
EI
R
re
m
a
i
n
s
va
l
i
d
in
re
g
a
r
d
s
to
th
e
Vi
c
t
o
r
i
a
Av
e
.
ex
t
e
n
s
i
o
n
.
The extension
pr
o
v
i
d
e
s
an
d
al
t
e
r
n
a
t
e
NB
ro
u
t
e
to
Br
o
a
d
St
r
e
e
t
th
e
r
e
b
y
re
d
u
c
i
n
g
Br
o
a
d
St
r
e
e
t
co
n
g
e
s
t
i
o
n
an
d
im
p
r
o
v
i
n
g
lo
c
a
l
ac
c
e
s
s
.
It’s recommended that
th
i
s
im
p
r
o
v
e
m
e
n
t
be
ca
r
r
i
e
d
fo
r
w
a
r
d
in
th
e
Ge
n
e
r
a
l
Pl
a
n
.
1
Memo
To: San Luis Obispo City Council
From: Los Verdes Parks 1 & 2 Homeowners Associations' Collaborative Committee
(prepared by Donna Di Gangi, resident Los Verdes Park 1, on behalf of the
committee)
CC: Kim Murry, Peggy Mandeville
Date: September 14, 2014
Re: Public Comment, September 16, 2014 Council Meeting Agenda Item for LUCE
FEIR: Sensitivity Analyses
Two distinctly different "sensitivity analyses" appear on the slo2035 website. (See
Attachment A to view how these two items appear on the slo2035 website.)
1. Volume V, Appendix N of the LUCE EIR contains the "Sensitivity Analysis", prepared
June 4, 2014. (See Attachment B.)
2. Below the Draft EIR body, analysis of sensitivity appears in the form of a technical
memorandum (see Attachment C), dated June 29, 2014, and posted sometime thereafter.
The sensitivity analysis in Volume V, Appendix N appears as the official version, since it is a
part of the Draft EIR document. The June 29, 2014 memo appears to be excludable (and we
believe it should be excluded) from the Final EIR.
The State Clearinghouse indicates that the Draft EIR was made available for public review
on June 13, 2014. This coincides with the City's statement: "The public review period for the
Draft EIR ran from Friday, June 13, 2014 to Monday, July 28, 2014."
The State Clearinghouse does not indicate any updates to the Draft EIR, since the June 13,
2014 notification date. If the June 29th technical memorandum was intended to be officially
included as part of the Draft EIR public comment process, it seems to have missed this
opportunity. A commenter cannot be expected to notice (seek out) additional documents for
public review, after the official notice date of June 13, 2014. All applicable documents must
have had at least 30 days of availability for public review, if not required to have the full,
stated 45 day review period from June 13 to July 28, 2014.
Additionally, we find that analysis in the June 29th memo references project mitigation
measures that do not exist -- namely, mitigation measures from the Chevron EIR. In
particular, pages 7 and 8 of the June 29, 2014 memo discuss the LOVR Bypass. The first
sentence of the LOVR Bypass "Finding" (see page 8, June 29th memo) references the draft
Chevron EIR:
Addition of the LOVR Bypass improves the intersection operations of LOVR &
Higuera, however other smaller scale measures already identified as part of the
Chevron draft EIR accomplish a similar improvement. [Emphasis added]
Page 2
Furthermore, the final (and draft) Chevron EIR does not specify the mitigation measure(s)
that will be used. Instead the Chevron EIR offers possible options that have differing effects.
Therefore, the LUCE should exclude analyses involving mitigation measures from the
Chevron EIR, as they do not yet exist. In other words, the LOVR Bypass analysis/findings
should be limited to projects and mitigation measures already adopted at the time of analysis.
The inclusion of LOVR Bypass, as a project to move forward, provides significant
improvement to the LOVR/Higuera intersection, one of the three busiest intersections in the
City. The following table, whose traffic was analyzed assuming a full interchange at Prado
Road, indicates the delay and LOS with and without this Bypass.
Source: Page 7 of June 29, 2014 memo and also Page 6 of Volume V, Attachment N, LUCE EIR
Note that the without the Bypass, PM LOS degrades from C to F (AM LOS degrades from B
to C).
The LOVR Bypass needs to move forward, in order to manage city traffic. The Bypass
benefits all traffic traveling in and through the area, improves the perception of the City's
gateway, and is integral to accommodating developments from Madonna to Broad.
Overall, we urge the Council only adopt the "Appendix N, Sensitivity Analysis", as part of
the FEIR for the LUCE, and specifically exclude the June 29, 2014 technical memorandum
from LUCE FEIR documents, while moving plans for the LOVR Bypass and its funding
forward, including:
1. Analysis of the Bypass without any presumed Chevron mitigation measures,
2. Analysis of the Bypass for its merits, without a full Prado Road interchange (with and
without an overpass at Prado). This should also help provide analyses, in support of the
first and second points made by Caltrans in response to the LUCE EIR, which are:
1. Making local circulation changes only
2. Establishing only an overpass at Prado
3. Modifying access at the LOVR and Madonna interchanges
4. Full or partial interchange connection at Prado Road
Page 3
3. Advancing the project into TIF funding, as recommended by the Planning Commission
(see Table 8 of Staff Memo for September 17 and 18, 2014 meetings),
4. Evaluating the overall situation to determine what other development areas should
contribute to funding, aside from the potential residential developments (LOVR
Creekside) just east of 101/LOVR.
Alternatively, we urge the Council to accept the FEIR with the conditions of a) striking the
LOVR Bypass analysis and findings from pages 7 and 8 of the June 29th technical
memorandum, b) utilizing only the LOVR Bypass analysis and findings from Volume V,
Appendix N of the LUCE FEIR, and c) moving plans for the LOVR Bypass and its funding
forward, as discussed in the four points above.
Thank you.