Loading...
HomeMy WebLinkAbout09-16-2014 ph3 digangi (2)SFP 16 2114 Kremke, Kate From: Mejia, Anthony Sent: Tuesday, September 16, 2014 11:39 AM To: Kremke, Kate Subject: FW: Public Comment, 9 -16 -2014 Council Meeting re: Sensitivity Analysis Agenda Correspondence PH3 09/16/14 Anthony J. Mejia, MMC I City Clerk C.11,V Of, san Kris OMSp)O 990 Palm Street San Luis Obispo, CA 93401 tel 1805,781.7102 AGENDA CORRESPONDENCE Date - i1- � � � Item# P� --3 From: Donna [mailto:donna @digangi.net] Sent: Monday, September 15, 2014 5:29 PM To: Ashbaugh, John; Mandeville, Peggy; Murry, Kim; Johnson, Derek; Grigsby, Daryl; Bochum, Tim Cc: 'Sarah Flickinger'; 'Darrell Goo'; 'Walter Bremer'; Codron, Michael; Dietrick, Christine; Lichtig, Katie; Mejia, Anthony; Carpenter, Dan; Christianson, Carlyn; Codron, Michael; Marx, Jan; Smith, Kathy Subject: RE: Public Comment, 9 -16 -2014 Council Meeting re: Sensitivity Analysis Dear Mr. Ashbaugh et al., Thank you for your prompt response and attention to the concerns. We understand that the circulation element, itself, can still be modified. However, the issue with the Bypass does appear in the Executive Summary of the Final EIR (and, I recall, at least one other part of the FEIR). The following excerpt (from page PC2 -20 of the attached staff memo) shows what appears in the Executive Summary of the FEIR: Maximum Circulation Improvements Alternative: This alternative evaluates the environmental conditions thz result if three additional modfficationswere added to the proposed LUCE Update. These modifications includE introduction of two circulation improvements that were removed from the EIR traffic modeling (the "Vachel Ls Raaliiznment" and "Calle loactuin Connector to Dalidio Drive" improvements) and a revised version of the "Bud to Los Osos Valley I�oad Connection" improvement. The three a� street network changes added to the Circulation I mprovernents Alternative were options identified during the preliminary public review of potential system changes but were not included in the proposed Grculation Element traffic modeling.. When it says "...a revised version of the "Buckley Road to Los Osos Valley Road Connection" improvement ", it is referring to the June 29th Technical Memorandum analysis. This is the particular analysis we have brought to your attention in our comments -- the one that makes justification to exclude the Bypass, uses Chevron mitigation, etc., and also the one without the necessary time for public review and comment. So, this is the language that needs to be struck from the Final EIR before Council certification /approval, because making the Bypass a "Maximum Circulation Improvements Alternative" (a possibility) and not a recommended project would be the problem. Details on this concern are in the comment letters we wrote, and can be seen if one compares the content of the Appendix N and June 29th "Sensitivity Analyses" (Attachments B and C of the comment on sensitivity analyses). Regards, Donna Di Gangi Principal Consultant DiGangi Consulting Phone: (805) 541 --3344 Email: donna(Sdigangi.net CONFIDENTIALITY NOTICE: This e -mail and any attachments may contain confidential information intended solely for the use of the addressee. If the reader of this message is not the intended recipient, any distribution, copying, or use of this e -mail or its attachments is prohibited If you received this message in error, please notify the sender immediately by e -mail and delete this message and any copies. From: Ashbaugh, John [mailto:jashbaugh @ slocity.org] Sent: Monday, September 15, 2014 3:58 PM To: Mandeville, Peggy; Murry, Kim; Johnson, Derek; Grigsby, Daryl; Bochum, Tim Cc: 'Sarah Flickinger'; Donna; 'Darrell Goo'; 'Walter Bremer'; Codron, Michael; Dietrick, Christine; Lichtig, Katie; Mejia, Anthony Subject: RE: Public Comment, 9 -16 -2014 Council Meeting re: Sensitivity Analysis Apparently the LOVR issue will require some discussion among the Council, based on this communication from the Los Verdes Estates consultant. I just received a second, 5 -page letter from Sarah Flickinger, and in fact I just got a THIRD communication from the Los Verdes homeowners moments ago. Note to Donna and Sarah: Council members — at least THIS Councilmember — received all three letters. Your concerns with the June 29 Technical Memorandum as being considered part of the Final EIR will be addressed by staff. Please recall, however, that the action we are considering is certification of a Final EIR in which many written communications, including detailed responses to public and agency comments, have been folded into the Final EIR. We are not, however, in this action tomorrow evening, adopting the final policy language for the general plan. There is still time to work out such language in response to the full spectrum of opinion and technical analyses that appear in the Final EIR. John Ashbaugh Council Member �r T��q� f r C i 1 OF Sfln LUIS OBISPO Office of the City Council 990 Palm Street, San Luis Obispo, CA 93401 -3249 E iashbaug(a-)-slocity.org T 805.781.7122 C 805.550.7713 -,io lty.orq From: Donna [mailto:donna(Uigangi.netI Sent: Monday, September 15, 2014 1:59 PM To: Ashbaugh, John; Carpenter, Dan; Christianson, Carlyn; Codron, Michael; Dietrick, Christine; Lichtig, Katie; Marx, Jan; Smith, Kathy; Mejia, Anthony; Mandeville, Peggy; Murry, Kim Cc: 'Sarah Flickinger'; 'Darrell Goo'; 'Walter Bremer' Subject: Public Comment, 9 -16 -2014 Council Meeting re: Sensitivity Analysis Dear Council (and staff), I have attached a public comment from the Los Verdes Park 1 and 2 joint committee, for this Tuesday's City Council Meeting (September 16, 2014). Please find our 3 page public comment and its referenced attachments, in the two attached pdf files. Thank you.. Donna Di Gangi Principal Consultant DiGangi Consultinq Phone: (805) 541 -3344 Email: donnaCcD- digangi.net CONFIDENTIALITY NOTICE: This e -mail and any attachments may contain confidential information intended solely for the use of the addressee. If the reader of this message is not the intended recipient, any distribution, copying, or use of this e -mail or its attachments is prohibited. If you received this message in error, please notify the sender immediately by e -mail and delete this message and any copies