RECOMMENDATION
Adopt a resolution approving the Final Map for Tract 2560-Phase 2 at 215 Bridge Street and
authorizing the Mayor to execute the Subdivision Agreement and Biological Open Space Easement
Agreement on behalf of the City.
DISCUSSION
Background
Tract 2560 (TR 64-03) is located at 215 Bridge Street (Attachment 1). A vesting tentative map for
Tract 2560 (Attachment 2) was originally approved by the City Council on December 7, 2004, by
Resolution No. 9638 (2004 Series) (Attachment 3). The vesting tentative map authorized
creation of 18 single family residential lots, one condominium lot for eight commercial
condominium units, and one lot for an existing homestead site. Phase 1 of the map, which was
approved by Council on May 1, 2007, and recorded on May 4, 2007, created two lots, a
Remainder lot for the existing homestead and Lot A, which was intended for future subdivision.
Phase 2 is a subdivision of Lot A of Phase 1 and will create the remaining lots approved with the
Tract 2560 tentative map; those lots being the 18 single family residential lots and one
condominium lot for the purposes of creating eight live/work condominium units.
Conditions of Approval
All of the conditions of approval for Tract 2560 were deferred to the Phase 2 map, so the
developers of Phase 2 are required to not only complete the typical frontage and subdivision
improvements associated with their phase of the map, but also to complete any conditions that
were deferred with the Phase 1 map. The deferred conditions include:
1. Reserving private open space on the Phase 1 Remainder lot with the intent of preventing
development above a certain elevation on the hill, and
2. Reserving a similar private open space on the Phase 2 lots, and
3. Dedicating an easement for public pedestrian access through the tract to access the South
Hills Natural Reserve, and
4. Dedicating a private utilities and access easement and installing a water service, a sewer
lateral, and a vehicular access to serve the Phase 1 homestead lot, and
10/21/2014
C4
C4 - 1
APPROVAL OF THE FINAL MAP FOR TRACT 2560-PHASE 2,
215 BRIDGE STREET (TR 64-03)
Page 2
5. Dedicating a public Biological Open Space easement (Attachment 4) along the creek to
preserve biological resources including the blackberry brambles.
Improvement Securities
As specified in the Subdivision Agreement (Attachment 5), the Subdivider is required to submit
a faithful performance security to guarantee completion of the subdivision improvements. In lieu
of providing a bond, the Subdivider has elected to submit multiple Certificates of Deposit in
favor of the City in the total security amount. Because the Certificates of Deposit will tie up a
substantial amount of the Subdivider’s cash reserves, the Subdivider has requested that the City
Council authorize partial releases of the Certificates of Deposit as the work progresses. Section
66499.7 et seq of the Subdivision Map Act provides for the partial release of improvement
securities and allows the Council to appoint any of its employees to authorize release or
reduction of the securities. The resolution approving the final map (Attachment 6) grants the
Public Works Director the authority to process partial releases of the improvement securities.
Any partial releases authorized by the Public Works Director will not constitute acceptance of the
subdivision improvements. Acceptance of the subdivision improvements will remain the authority
of the City Council.
Approving the Final Map
The tentative map has an initial two-year life per Municipal Code Section 16.10.150. With two
City-approved one-year extensions back in 2006 and 2007 and the automatic extensions granted
by the State Legislature per Sections 66452.21, 66452.22, 66452.23, and 66452.24 of the
Subdivision Map Act, this vesting tentative map now has an expiration date of
December 7, 2015. The filing of multiple final maps does not extend the life of a tentative map
unless off-site improvements of a certain value are constructed in accordance with
Section 66452.6 of the Subdivision Map Act. Since there are no off-site improvements required
with Tract 2560, all phases of the final map must be filed by the current map expiration date of
December 7, 2015, unless additional time extensions are granted by the City pursuant to
Municipal Code Section 16.10.155 and the Subdivision Map Act. Otherwise a new tentative map
will need to be processed by the subdivider.
The conditions for Tract 2560 have been met and the final map for Tract 2560-Phase 2 is ready
to be approved and recorded. Pursuant to Section 16.14.080 of the Municipal Code, the Public
Works Director has determined that the final map is in substantial compliance with the tentative
map. Section 66474.1 of the Subdivision Map Act states that “a Legislative body shall not deny
approval of a final or parcel map if it has previously approved a tentative map for the proposed
subdivision and if it finds that the final or parcel map is in substantial compliance with the
previously approved tentative map.” The approval of a final map is considered a ministerial
action.
Appropriate securities will be submitted to guarantee completion of the required subdivision
improvements as shown in the Subdivision Agreement. The resolution approving the final map
also authorizes the Mayor to sign the Subdivision Agreement requiring the Subdivider to
complete the subdivision improvements and the Biological Open Space Easement Agreement.
C4 - 2
APPROVAL OF THE FINAL MAP FOR TRACT 2560-PHASE 2,
215 BRIDGE STREET (TR 64-03)
Page 3
CONCURRENCES
The Public Works Department and the Natural Resources Manager concur with the
recommended action.
ENVIRONMENTAL REVIEW
Approval of the final map is statutorily exempt under the California Environmental Quality Act
(CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision
maps), of Title 14 of the California Code of Regulations (State CEQA Guidelines). Therefore, no
further environmental review is required.
FISCAL IMPACT
There is no significant financial impact to the City associated with approving the final map for
Tract 2560-Phase 2. However, the public improvements that will be constructed with this phase will
result in a minor increase in maintenance costs for the utilities serving these lots. The modest staff
time necessary to monitor the Biological Open Space Easement is supported by the Natural
Resources Program’s operating budget.
ALTERNATIVES
Deny approval of the final map. Denying approval of the final map can apply if findings are
made that the requirements or conditions of the tentative map have not been met or performed
(Section 66473 of the Subdivision Map Act) or if findings are made that the final map is not in
substantial compliance with the previously approved tentative map (Section 66474.1 of the
Subdivision Map Act). Because the final map is in substantial compliance with the tentative map
and all of the conditions of the map will be met or securities deposited prior to map recordation,
Sections 66474.1 and 66473 of the Subdivision Map Act require that City Council approve the
map. Therefore, denying approval of the final map is not a recommended alternative unless the
required findings are made.
ATTACHMENTS
1. Vicinity Map
2. Vesting Tentative Map
3. Resolution No. 9638 (2004 Series)
4. Biological Open Space Easement Agreement
5. Subdivision Agreement
6. Draft Resolution Approving the Final Map
T:\Council Agenda Reports\2014\2014-10-21\Final Map Approval Tract 2560 Phase 2, 215 Bridge\Council Agenda Report.docx
C4 - 3
C4 - 4
C4 - 5
C4 - 6
C4 - 7
C4 - 8
C4 - 9
C4 - 10
C4 - 11
C4 - 12
C4 - 13
C4 - 14
C4 - 15
C4 - 16
C4 - 17
C4 - 18
C4 - 19
C4 - 20
C4 - 21
C4 - 22
C4 - 23
C4 - 24
1
ATTACHMENT 5
SUBDIVISION AGREEMENT
THIS AGREEMENT is dated this ______ day of ___________201___ by and
between 215 Bridge Street, LLC, herein referred to as "Subdivider," and the CITY OF SAN
LUIS OBISPO, herein referred to as the "City."
RECITALS
REFERENCE IS HEREBY MADE to that certain proposed subdivision of real
property in the City of San Luis Obispo, County of San Luis Obispo, State of California, a
description of which is shown on the Final Map of Tract 2560-Phase 2, City of San Luis
Obispo, California, as approved by the City Council on the ____ day of ___________,
201___.
The Subdivider desires that said Tract No. 2560-Phase 2 be accepted and
approved as a Final Map pursuant to the Subdivision Regulations of the City of San Luis
Obispo (Title 16 of the San Luis Obispo Municipal Code), and
It is a condition of said regulations that the Subdivider agree to install the
improvements as set forth on the plans therefore.
TERMS AN D CONDITIONS:
In consideration of the foregoing, the Subdivider does hereby agree to construct
and install the following subdivision improvements in accordance with said subdivision
regulations, and in accordance with approved plans and specifications on file in the office
of the City Engineer, City of San Luis Obispo, to wit:
1. CURB, GUTTERS AND SIDEWALKS
2. STREET BASE AND SURFACING
3. WATER MAINS and SEWER MAINS, including sewer laterals to the property line
and water services to the curb stop.
C4 - 25
2
ATTACHMENT 5
4. LANDSCAPING
5. DRAINAGE STRUCTURES, including bridge
6. STREET LIGHTS
7. ELECTRIC, GAS, TELEPHONE AND CABLE TELEVISION: In addition to the
inspection and approval of such facilities by the City, each public utility shall be
required to file a letter stating that the developer has properly installed all facilities to
be provided by him, and that the said utility is prepared to provide service to
residents upon request.
8. ANY & ALL OTHER IMPROVEMENTS shown on plans or required by project
approvals.
All of the above facilities shall be installed in the locations designated and to the plans and
specifications on file and approved by said City Engineer.
The lines and grades for all of said improvements shall be established by the
Subdivider in accordance with said approved plans and specifications.
The Subdivider agrees that the work of installing the above improvements shall
begin within thirty (30) days from the date of recording of the final map, and that the work
shall be completed within twelve (12) months of said recording date, unless an extension
has been granted by the City, provided that if completion of said work is delayed by acts of
God or labor disputes resulting in strike action, the Subdivider shall have an additional
period of time equivalent to such period of delay in which to complete such work. Any
extension of time hereunder shall not operate to release the surety on the Improvement
Security filed pursuant to this agreement. In this connection, the surety waives the
provisions of Section 2819 of the Civil Code of the State of California.
C4 - 26
3
ATTACHMENT 5
No building permits will be issued nor occupancy granted after the expiration date
of the agreement until completion and acceptance of all subdivision improvements unless
specifically approved by the City.
The Subdivider does also agree to comply with the conditions established by the
Planning Commission and/or the City Council and has paid the necessary fees as
indicated on the attached Exhibits 1 and 2.
The restoration of lost section corners and retracement of section lines within the
Subdivision shall be in accordance with Article 5, paragraph 8771 et seq., of the
Professional Land Surveyors Act, Chapter 15 of the Business and Professions Code of the
State of California.
The Subdivider attaches hereto, as an integral part hereof, and as security for the
performance of this agreement, instrument(s) of credit or bond approved by and in favor of
the City of San Luis Obispo, and conditional upon the faithful performance of this
agreement. The amount of said instrument(s) of credit or bond total $857,000 which is the
amount of the estimated cost of said improvements.
Subdivider agrees to remedy any defects in the improvements arising from faulty
workmanship or materials or defective construction of said improvements occurring within
twelve (12) months after acceptance thereof. In accordance with Sections 66499.7 and
66499.9 of the Government Code of the State of California, upon final completion and
acceptance of the work, City will release all but 10% of the improvement security, that
amount being deemed sufficient to guarantee faithful performance by the Subdivider of his
obligation to remedy any defects in the improvements arising within a period of one year
following the completion and acceptance thereof.
C4 - 27
4
ATTACHMENT 5
Completion of the work shall be deemed to have occurred on the date which the
City Council shall, by resolution duly passed and adopted, accept said improvements
according to said plans and specifications, and any approved modifications thereto.
Neither periodic nor progress inspections, approvals, or partial releases of securities shall
bind the City to accept said improvements or waive any defects in the same or any breach
of this agreement.
“AS-BUILT” record drawings are to be submitted within four weeks of completion of
construction and prior to City acceptance of the public improvements.
If the Subdivider fails to complete the work within the prescribed time, the
Subdivider agrees that City may, at its option, declare the instrument(s) of credit or bond
which has been posted by Subdivider to guarantee faithful performance, forfeited and
utilize the proceeds to complete said improvements, or city may complete said
improvements and recover the full cost and expense thereof from the Subdivider or his
surety.
The Subdivider has deposited with the City labor and materials securities totaling
$428,500, which is 50% of the above described subdivision improvements, in accordance
with State law.
Said Subdivider shall pay an inspection fee for City to inspect the installation of said
subdivision improvements, and to verify that they have been completed in accordance with
the plans and specifications.
Title 16 of the San Luis Obispo Municipal Code, entitled "Subdivision," all plans and
specifications on file with said City Engineer as a part of said Subdivision Map, and all
other documents filed with the City by the Subdivider and approved by the City Engineer
C4 - 28
5
ATTACHMENT 5
are hereby referred to for further particulars in interpreting and defining the obligations of
the Subdivider under this agreement.
Pursuant to Government Code Section 66474.9(b), the subdivider shall defend,
indemnify and hold harmless the City and/or its agents, officers and employees from any
claim, action or proceeding against the City and/or its agents, officers or employees to
attack, set aside, void or annul, the approval by the City of this subdivision, and all actions
relating thereto, including but not limited to environmental review (“Indemnified Claims”).
The City shall promptly notify the subdivider of any Indemnified Claim upon being
presented with the Indemnified Claim and City shall fully cooperate in the defense against
an Indemnified Claim.
It is understood and agreed by and between the Subdivider and the City hereto that
this agreement shall bind the heirs, executors, administrators, successors and assigns of
the respective Parties to this agreement.
It is agreed that the Subdivider will furnish copies of the successful bidder's contract
unit prices and total bid prices for all of the improvements herein referred to.
IN WITNESS WHEREOF, this agreement has been executed by:
CITY OF SAN LUIS OBISPO SUBDIVIDER
215 Bridge Street, LLC
MAYOR Jan Marx
Seth McCormick, Manager
ATTEST:
Justin Slade, Manager
CITY CLERK Anthony Mejia
C4 - 29
6
ATTACHMENT 5
EXHIBIT 1
TRACT 2560-PHASE 2
SUBDIVISION AGREEMENT
1. The Subdivider has deposited a monumentation guarantee in the amount of $2,000 to cover
the installation of survey monuments in accordance with the approved map and payment for
same. Said guarantee will be released to the Subdivider upon receipt by the City of a letter
from the Engineer indicating that they have completed the work and have been paid.
2. Park-in-lieu fees have been paid, as listed in the attached EXHIBIT 2.
3. Water and sewer impact fees shall be paid at time of building permits through the
Community Development Department per the fee schedule in effect at that time.
4. Transportation impact fees shall be paid at time of building permits through the Community
Development Department per the fee schedule in effect at that time.
5. The subdivider shall comply with all requirements of Council Resolution No. 9638 (2004
Series) approving the tentative map.
C4 - 30
7
ATTACHMENT 5
EXHIBIT 2
TRACT 2560-PHASE 2 - FEE AND BOND LIST
Amount Form Date Received
Bonds and Guarantees:
Partial guarantee
Partial guarantee
Partial guarantee
Partial guarantee
Partial guarantee
Partial guarantee (10% of total)
Total Faithful Performance
$175,000
$100,000
$200,000
$200,000
$ 96,300
$ 85,700
$857,000
CD
CD
CD
CD
CD
CD
Xxx
Xxx
Xxx
Xxx
Xxx
xxx
Partial guarantee
Partial guarantee
Partial guarantee
Partial guarantee
Partial guarantee
Total Labor & Materials
$ 87,500
$ 50,000
$100,000
$100,000
$ 91,000
$428,500
CD
CD
CD
CD
CD
Xxx
Xxx
Xxx
xxx
xxx
Monument Guarantee $2,000 CD xxx
Fees:
Total Map Check Fee $13,748 Check 4/23/14
Deposit
Payment
Payment
Total Plan Check Fee
$ 2,150
$31,866
$ 7,345
$41,361
Check
Check
Check
12/20/13
1/28/14
9/15/14
Improvement Plan Inspection $93,124 Check 9/15/14
Park In-Lieu Fee1 $107,856 Check xxx
Affordable Housing Requirements
Water Impact Fee1 To be collected with building permit
Wastewater Impact Fee1 To be collected with building permit
Transportation Impact Fee1 To be collected with building permit
1 All Impact Fees are adjusted annually (July 1) based on CPI. Credit given for demolished units.
C4 - 31
R _____
RESOLUTION NO. (2014 Series)
A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO
APPROVING THE FINAL MAP FOR TRACT 2560-PHASE 2
(215 BRIDGE STREET, TR 64-03)
WHEREAS, the City Council made certain findings concerning the vesting tentative
map for Tract 2560, as prescribed in Resolution No. 9638 (2004 Series); and
WHEREAS, the subdivider has completed all required subdivision improvements or will
submit appropriate securities to guarantee installation of the required subdivision improvements
as shown on the approved plans prior to map recordation, and all fees have been received or will
be received prior to map recordation, as prescribed in the Subdivision Agreement; and
WHEREAS, all conditions required per Resolution No. 9638 (2004 Series) will be met
prior to final recordation of the map; and
WHEREAS, approval of a final map is statutorily exempt under the California
Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects
(approval of final subdivision maps), of Title 14 of the California Code of Regulations (State
CEQA Guidelines).
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
as follows:
SECTION 1. The final map for Tract 2560-Phase 2 as shown on the attached Exhibit is
found to be in substantial compliance with the tentative map.
SECTION 2. The Subdivision Agreement and Biological Open Space Easement
Agreement for Tract 2560-Phase 2 are hereby approved.
SECTION 3. Approval of the final map for Tract 2560-Phase 2 is hereby granted.
SECTION 4. The Mayor and City staff are hereby authorized to take action necessary to
carry out the intent of this resolution.
SECTION 5. In accordance with Government Code section 66499.7 et seq, the Public
Works Director is authorized to perform partial releases of the improvement securities as the work
progresses, provided that sufficient securities are retained to guarantee completion of any remaining
improvements, payment to contractors, and warranty of work. Any partial releases authorized by the
Public Works Director do not constitute acceptance of the subdivision improvements, which
remains the authority of the City Council.
Upon motion of _______________________, seconded by ________________________,
and on the following roll call vote:
AYES:
NOES:
ABSENT:
ATTACHMENT 6
C4 - 32
Resolution No. (2014 Series)
Page 2 ATTACHMENT 6
The foregoing resolution was adopted this ______ day of _______________ 2014.
________________________________
Mayor Jan Marx
ATTEST:
______________________________
Anthony Mejia
City Clerk
APPROVED AS TO FORM:
________________________________
J. Christine Dietrick
City Attorney
C4 - 33
C4 - 34
C4 - 35
C4 - 36
C4 - 37
C4 - 38
C4 - 39
Page intentionally left
blank.
C4 - 40