Loading...
HomeMy WebLinkAbout11-10-2014 C3 Collection System Point Repairs 2015City of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl R. Grigsby, Director of Public Works Prepared By: Manny Guzman, Engineer III SUBJECT: COLLECTION SYSTEM POINT REPAIRS 2015, SPEC. NO. 91306 RECOMMENDATION 1. Approve plans and specifications for the Collection System Point Repairs 2015, Specification No. 91306. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer’s Estimate of $122,000. DISCUSSION Background The City’s wastewater collection system is comprised of 135 miles of sewer lines. Some of the pipes that make up the City’s wastewater collection system are over a century old and are in need of spot repairs to ensure proper function and to extend their useful life. Scheduled repairs to the collection system will allow the City to maintain the existing system in a preventative mode rather than an emergency mode. Project This project will complete 24 sewer main line spot repairs throughout the City. Polyvinyl chloride (PVC) pipe in conjunction with couplings will be used to replace damaged sections of sewer line. Other work included with this project includes the raising of five buried sewer cleanouts so they can be accessed for maintenance work. The cleanouts were installed years ago but were never raised to the roadway surface. Access to main lines through cleanouts or manholes is critical to perform maintenance to prevent blockages and overflows. Coordination with affected property owners has been done to minimize the impact during construction. Hours and work days have been adjusted in repairs adjacent to schools streets to eliminate traffic congestions during drop-off and pick-up hours. For certain projects only a set of special provisions with no plans is generated, such is the case for this project that because of the nature of the work, Staff determined that it was best to advertise with a set of special provisions only. The special provisions have the necessary information to complete all items of work per City Standards. 11-10-2014 C3 C3 - 1 Collection System Point Repairs 2015, Spec. No. 91306 Page 2 CONCURRENCES This project is categorically exempt from CEQA pursuant to CEQA Guidelines section 15301 (maintenance of existing facilities). A Notice of Exemption has been filed through the Community Development Department. FISCAL IMPACT This project is included in the 2013-15 Financial Plan, pages 3-157 to 3-165. The Collection System Improvements Master account (90239) currently has a balance of $1,992,431. A budget amendment request will be processed to transfer the appropriate project funding from the master account at the time of contract award. Engineer’s Estimate:$122,000 Contingencies:$18,000 Material Testing:$4,000 Printing and Misc:$500 Total Project Estimate $144,500 Collection Systems Point Repairs 2015, Spec. No. (91306) ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Special Provisions t:\council agenda reports\2014\2014-11-10 (rescheduled reg mtg)\collection systems point repairs (grigsby-guzman)\91306 car advertise.doc C3 - 2 C3 - 3 Page intentionally left blank. C3 - 4