Loading...
HomeMy WebLinkAbout12-16-2014 C5 Sinsheimer Stadium Stairs ReplacementCity of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl R. Grigsby, Director of Public Works Prepared By: Michael J. McGuire, Engineer III SUBJECT: SINSHEIMER STADIUM STAIRS REPLACEMENT, SPECIFICATION NO. 91255 RECOMMENDATIONS 1. Approve plans and specifications for “Sinsheimer Stadium Stairs Replacement, Specification No. 91255”. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bidder is within the Engineer’s Estimate of $109,000. 3. Approve the transfer of $7,732 from the project’s design account and $15,000 from the construction management account to the construction account at the time of bid award. DISCUSSION The easterly stairs leading to the field at Sinsheimer Baseball Stadium was built in the mid- 1970’s. These stairs have primarily served as access to the field area for the players and occasionally for the public during special events. Unlike the concrete stairs on the north side of the stadium, this stairway is of steel fabrication with concrete treads. Over forty years of use have left the stairs in a poor condition. Most of the concrete treads are missing portions of concrete or have been patched. The steel nosings on the treads have worn smooth from use and create a slippery condition on the stairs. The ground at the top landing to the stairs has sunk, resulting in a wide gap and vertical displacement between the landing and the stairs. This gap has been patched over but requires constant maintenance. This project will replace the existing steel staircase with a cast-in-place concrete stairs that is fully compliant with the Americans with Disabilities Act (ADA). The treads and nosings will be entirely covered with a metal plate embedded with slip-resistant material to handle the cleats of the baseball player’s shoes. The railing will be replaced with new steel railing compliant with current building codes. Also, the design will provide for level and connected landings at the top and bottom of the staircase. CONCURRENCES This project has the concurrence of the Community Development Department with building permits pending approval. Construction of an ADA ramp was not required due to this project being an ADA upgrade to existing facilities. 12/16/2014 C5 C5-1 Sinsheimer Stadium Stairs Replacement (91255) Page 2 FISCAL IMPACT The 2013-15 Financial Plan, Appendix B, pages 3-390 to 3-392, identifies $20,000 for design, $105,000 for construction, along with $15,000 for construction management. The current construction schedule allows for staff inspection and negates the need for consultant services for construction management. A transfer of the $15,000 from construction management and the current amount of $7,732 from design into the construction account phase will provide funds to fully support construction. This will provide a total construction budget of $127,732. ALTERNATIVE Deny approval to advertise. The Council could choose to deny or defer the approval for advertising of this project. Staff does not recommend this option. Should this be denied or deferred, replacement of the stairs will be delayed. The existing steel staircase will continue to deteriorate with the possibility of the stairs being closed for use. Since the stadium is a facility that the City charges a fee for use, the facility should be maintained in a reasonable state of usability. ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Special Provisions t:\council agenda reports\2014\2014-12-16\sinsheimer stadium stairs replacement (grigsby-mcguire).docx Fiscal Impact Summary 2014-15 Available Project Budget:127,732$ Engineer's Estimate Construction:109,000$ Construction Contingencies:11,000$ Total for Construction:120,000$ Testing/Inspection:5,500$ Printing & Advertising:500$ Total Cost of Project:126,000$ C5-2 CA P I T A L I M P R O V E M E N T P L A N - L E I S UR E , C U L T U R A L & S O C I A L S E R V I C E S SI N S H E I M E R S T A D I U M S T A I R R E P L A C E M E N T Pr o j e c t I n s p e c t i o n En g i n e e r i n g I n s p e c t i o n 80 Pr o j e c t A d m i n i s t r a t i o n C I P E n g i n e e r i n g - A d m i n i s t r a t i o n 60 Pr o j e c t P r o p o n e n t La n d s c a p e & P a r k M a i n t e n a n c e 8 En v i r o n m e n t a l R e v i e w P l a n n i n g 4 Lo c a t i o n M a p     Attachment 1 C5-3 Page intentionally left blank.