HomeMy WebLinkAbout01-12-2015 ARC Item 1 - 1101 Monterey StreetsMeeting Date: January 12, 2014 Item Number: #1 ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT SUBJECT: Review of two new one-story 5,000 square foot commercial buildings, including a request for an exception to allow a sign type not identified in the Sign Regulations, with a categorical exemption from environmental review. PROJECT ADDRESS: 1101 Monterey Street BY: Kyle Bell, Planning Technician Phone Number: 781-7524 e-mail: kbell@slocity.org FILE NUMBER: ARCH-0150-2014 FROM: Phil Dunsmore, Senior Planner RECOMMENDATION: Adopt the Draft Resolution (Attachment 1) which approves the project, based on findings, and subject to conditions. SITE DATA Applicant PEDP, Inc. Representative Carol Florence Oasis Associates, Inc. Zoning C-R (Commercial Retail) zone General Plan General Retail Site Area 30,412 sq. ft. (0.70 Acres) Environmental Status Categorically exempt under Class 32, In-Fill Development Projects; Section 15332 of the CEQA Guidelines. SUMMARY The proposed project is a redevelopment of the subject location with two single-story 5,000 square foot commercial buildings with an archway feature that identifies the property. The project meets all property development standards of the Zoning Regulations, with an exception from the Sign Regulations to allow for a property location sign attached to the archway feature. Staff finds the scale, massing, articulation, color/materials, and commercial vernacular design of the proposed buildings to be compatible with the project site, the downtown core, the adjacent buildings, and the Community Design Guidelines. Staff finds the proposed archway sign to be consistent with the intent of the City’s Sign Regulations to allow a sign type not defined in the Sign Regulations. ARC1 - 1 ARCH-0150-2014 (1101 Monterey Street) Page 2 1.0 COMMISSION’S PURVIEW The ARC’s role is to review the project in terms of its consistency with the Community Design Guidelines, Sign Regulations and applicable City standards. 2.0 PROJECT INFORMATION 2.1 Site Information/Setting The project site consists of approximately 0.7 acres of land in the Commercial Retail (C-R) zone. The project site is currently developed with a Shell service station with access to Monterey Street, Santa Rosa Street, and Higuera Street. The project site location is considered a prominent gateway to the entrance of Downtown San Luis Obispo for visitors travelling from Highway 101 and Highway 1. The project site is surrounded by Commercial Retail (C-R) zoned land (north, east, and west) with Commercial Downtown (C-D) located south of the project site across Santa Rosa Street (Attachment 2, Vicinity Map). Table 2.1: Background 2.2 Project Description A summary of significant project features includes the following (Attachment 3, Project Plans): 1. Redevelopment of the subject location with two new 5,000 square foot commercial buildings including parking, landscaping, and a small plaza. a. Two one-story buildings; one on the corner of Monterey Street and Santa Rosa Street, and one on the corner of Santa Rosa Street and Higuera Street. b. Demolition of existing Shell Service Station including removal of underground petroleum storage tanks. c. Tree removals. The City Arborist has reviewed the removals and concurred that the proposed landscape plan with new street trees provides adequate mitigation. d. Sign Regulations exception request to allow for an archway sign identifying the property that is not a sign type identified in the Sign Regulations (Attachment 4, Project Plans, Sheet 11). Site Size 0.70 acres Present Use & Development Shell Service Station (gas service station) Land Use Designation Commercial Retail (C-R) Access Monterey Street, Santa Rosa Street, and Higuera Street Surrounding Use/Zoning North: Auto Services and Offices (C-R Zoning) South: County Government Center (C-D Zoning) East: Financial Services (C-R Zoning) West: Offices (C-R Zoning) ARC1 - 2 ARCH-0150-2014 (1101 Monterey Street) Page 3 2. Commercial Vernacular design incorporating a primarily brick façade with alternating brick color and detailing between buildings, the design also includes decorative detailing, parapet roofs, and the use of contemporary forms such as steel retrofitted support on the raised entry features. Table 2.2: Project Statistics Item Proposed 1 Ordinance Standard 2 Street Yard setback 0 feet 0 feet Side Yard Setbacks 0 feet 0 feet Max. Height of Structure(s) 29.5 feet 45 feet Coverage (buildings & paving) 33% 100% Floor Area Ratio (FAR) .33 3.0 Parking Spaces Vehicle Motorcycle Bicycle 40 4 6 33 4 5 Notes: 1. Applicant’s project plans 2. City Zoning Regulations 3.0 PROJECT ANALYSIS 3.1 Site Plan: The building envelope is established by the Zoning Regulations’ property development standards relative to height, setbacks, parking, coverage and floor area ratio (see Table 2.2 above). The project complies with the property development standards of the Zoning Regulations and no exceptions are requested (see Attachment 3, Project Plans). The proposed buildings are oriented facing the intersections along Santa Rosa Street consistent with the Conceptual Physical Plan for the City’s Center, and are located along the front of the property with direct pedestrian access from the sidewalk. The buildings are linked together through a proposed archway that provides pedestrian areas and between the two buildings. Parking is shared between on-site uses, and is located interior to the site to minimize visual impact from the street with the majority of the parking spaces shielded by the structures. Access to the parking lot is provided along three of the properties street frontages away from street intersections to the furthest extent possible. Although this site could benefit from a more substantial development with two and three story buildings similar to the downtown core, the site is severely constrained due to parking. This site is unusual in that it is part of the downtown core as noted in the General Plan; however it is outside of the parking district which currently terminates at Santa Rosa Street. Inclusion in the parking district would allow some or all of the parking to be eliminated in exchange for in-lieu fees similar to development south of Santa Rosa Street. This constraint limits design flexibility and additional density. In the future, the Monterey Street corridor may be included in a parking district, allowing additional flexibility for off-site parking or in-lieu fees. 3.2 Design: Neighborhood Compatibility. The proposed commercial buildings will be located at the gateway to the City’s downtown area. Buildings in the area range from one to four stories in height, and are of an eclectic mix of architectural styles. The project takes ARC1 - 3 ARCH-0150-2014 (1101 Monterey Street) Page 4 into consideration the design of brick buildings found throughout the Downtown Core. The proposed one story commercial buildings are a modest transition from the adjacent two to four story buildings that mark the entrance to the downtown corridor. The proposed façade articulation for the commercial buildings fits appropriately with the scale and design of the adjacent buildings. The entrances to the buildings are designed to create an architectural focal point 1 with obvious elements oriented at each intersection to provide access from each street frontage. Material, Articulation, Massing. The design incorporates a brick exterior façade with steel framed openings and support features, compatible in style with other brick buildings located throughout the Downtown Core. The project makes use of articulation2, and material change throughout all elevations 3 in a manner appropriate for single story construction, consistent with the Community Design Guidelines. Each building is designed with a different brick color and detailing to emulate traditional brick buildings found throughout the City. The two buildings are linked together through an archway feature that acts as a gateway that identifies the transition between the Downtown corridor and the Monterey corridor. The brick material and color changes between the two buildings and the archway feature are compatible with the project site and the existing colors found in the surrounding area 4 (Note: a color board will be provided at the ARC hearing). 3.3 Signage: The proposed project includes an entry archway feature over the Santa Rosa Street vehicle entrance that identifies the property. The archway sign is proposed to be non-illuminated free standing letters with an approximately area of 65 square feet, elevated 20’ 6” above the ground allowing vehicle access. This archway sign feature is not a sign type that is identified in the City’s Sign Regulations; the applicant is requesting an exception from the sign regulations to allow the archway sign 5. 1 Community Design Guidelines Chapter 3.1.B8: Entries. Building entries should be important and obvious elements in the design of a façade. 3.1.B8a: Each entry should be protected from the elements and should create an architectural focal point for the building. 2 Community Design Guidelines Chapter 3.1.B4: Form and mass. Horizontal and vertical wall articulation should be expressed through the use of wall offsets, recessed windows and entries, awnings, full roofs with overhangs, second floor setbacks, or covered arcades. 3 Community Design Guidelines Chapter 3.1.B3: Design consistency. Designs should demonstrate a consistent use of colors, materials, and detailing throughout all elevations of the building. Elevations which do not directly face a street should not be ignored or receive only minimal architectural treatment. Each building should look like the same building from all sides. 4 Community Design Guidelines Chapter 3.1.B12: Colors. …Colors should be compatible with the existing colors of the surrounding area but need not duplicate existing colors. 5 Sign Regulations Article VI: Exceptions to Sign Standards. C: The exception is consistent with the intent and purpose of the sign regulations (see Section 15.40.110) and will not constitute a grant of special privilege or entitlement inconsistent with limitations applied to other properties in the vicinity with the same zoning. D: The sign exception is for superior design will not result in visual clutter and is consistent with the intent and purpose of theses Sign Regulations. ARC1 - 4 ARCH-0150-2014 (1101 Monterey Street) Page 5 The proposed sign is consistent with the findings to allow an exception from the sign standards; C: The exception is consistent with the intent and purpose of the sign regulations (see Section 15.40.110) and will not constitute a grant of special privilege or entitlement inconsistent with limitations applied to other properties in the vicinity with the same zoning. D: The sign exception is for superior design will not result in visual clutter and is consistent with the intent and purpose of theses Sign Regulations. The proposed sign acts as a neighborhood landmark and is of a superior design that will enhance views from the street toward the property that will not result in visual clutter. The Sign Regulations are intended to protect and enhance the character of the community and its various neighborhoods and districts against visual blight. The exception is consistent with the intent and purpose of the sign regulations and will not constitute a grant of special privilege toward the property, because the sign is architecturally compatible with affected structures and the character of surrounding development, the sign is designed to assist with way finding rather than advertisement space for a business. 4.0 ENVIRONMENTAL REVIEW The project is categorically exempt under Class 32, In-Fill Development Projects; Section 15332 of the CEQA Guidelines, because the project site is surrounded by urban uses and is consistent with the general plan land use designation. The approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. 5.0 OTHER DEPARTMENT COMMENTS Comments from the other departments have been incorporated into the recommended resolution as conditions of approval and/or code requirements. 6.0 ALTERNATIVES 6.1. Deny the project based on findings of inconsistency with the Community Design Guidelines. 6.2. Continue the project with direction to the applicant and staff on pertinent issues. 7.0 ATTACHMENTS 1. Draft Resolution 2. Vicinity map 3. Project Statement 4. Project Plans Included in Committee member portfolio: Project Plans Available at ARC Hearing: Colors and Materials Board ARC1 - 5 RESOLUTION NO. ####-15 A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL REVIEW COMMISSION APPROVING TWO NEW ONE-STORY 5,000 SQUARE FOOT COMMERCIAL BUILDINGS, INCLUDING AN EXCEPTION TO ALLOW A SIGN TYPE NOT IDENTIFIED IN THE SIGN REGULATIONS (ARCHWAY SIGN) AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED JANUARY 12, 2015 (1101 MONTEREY STREET, C-R ZONE; ARCH-0150-2014) WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis Obispo, California, on January 12, 2014, pursuant to a proceeding instituted under ARCH-0150- 2014, PEDP Inc., applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by the staff at said hearings. WHEREAS, notices of said public hearings were made at the time and in the manner required by law; and NOW, THEREFORE, BE IT RESOLVED by the Architectural Review Commission of the City of San Luis Obispo as follows: SECTION 1. Findings. The Architectural Review Commission hereby grants final approval to the project (ARCH-0150-2014), based on the following findings: 1. The project will not be detrimental to the health, safety, or welfare of those working or residing in the vicinity since the proposed project is consistent with the site’s zoning designation, and will be subject to conformance with all applicable building, fire, and safety codes. 2. Consistent with the City’s Community Design Guidelines, the project incorporates articulation, massing, and a mix of color/finish materials that are compatible with the neighborhood and complementary to other development in the downtown core. 3. The proposed project is consistent with the Land Use Element policy for walking environments near the Downtown core, due to the orientation of the proposed buildings facing the intersections and the proposed pedestrian midblock walkways. 4. The proposed archway sign is consistent with the findings for approval of an exception from the Sign Regulation to permit a sign type that is not identified in the Sign Regulations. a. Finding C: The exception is consistent with the intent and purpose of the sign regulations (see Section 15.40.110) and will not constitute a grant of special Attachment 1 ARC1 - 6 Resolution No. ARC-####-15 Page 2 1101 Monterey Street, ARCH-0150-2014 privilege or entitlement inconsistent with limitations applied to other properties in the vicinity with the same zoning. b. Finding D: The sign exception is for superior design will not result in visual clutter and is consistent with the intent and purpose of theses Sign Regulations. SECTION 2. Environmental Review. The project is categorically exempt under Class 32, In-Fill Development Projects; Section 15332 of the CEQA Guidelines, because the project site is surrounded by urban uses and is consistent with the general plan land use designation. The approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. SECTION 3. Action. The Architectural Review Commission hereby grants final approval to the project with incorporation of the following conditions: Planning Department 1. Final project design and construction drawings shall be in substantial compliance with the project plans approved by the ARC. A separate full-size sheet shall be included in working drawings submitted for a building permit that list all conditions, and code requirements of project approval as Sheet No. 2. Reference should be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping or other conditions of approval must be approved by the Director or Architectural Review Commission, as deemed appropriate. 2. Plans submitted for a building permit shall call out the colors and materials of all proposed building surfaces and other improvements on elevation drawings. 3. Plans submitted for a building permit shall include window details indicating the type of materials for the window frames and mullions, their dimensions, and colors. Plans shall include the materials and dimensions of all lintels, sills, surrounds recesses and other related window features. 4. The locations of all lighting, including bollard style landscaping or path lighting, shall be included in plans submitted for a building permit. All wall-mounted lighting fixtures shall be clearly called out on building elevations included as part of working drawings. All wall- mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures and cut- sheets on the submitted building plans. The selected fixture(s) shall be shielded to insure that light is directed downward consistent with the requirements of the City’s Night Sky Preservation standards contained in Chapter 17.23 of the Zoning Regulations. 5. Mechanical and electrical equipment shall be located internally to the building. With submittal of working drawings, the applicant shall include sectional views of the building, which clearly show the sizes of any proposed condensers and other mechanical equipment. If any condensers or other mechanical equipment are to be placed on the roof, plans submitted for a building permit shall confirm that parapets and other roof features will adequately Attachment 1 ARC1 - 7 Resolution No. ARC-####-15 Page 3 1101 Monterey Street, ARCH-0150-2014 screen them. A line-of-sight diagram shall be included to confirm that proposed screening will be adequate. This condition applies to initial construction and later improvements. 6. A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings. The legend for the landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. a. Any proposed landscape lighting shall be shown on plans submitted for a building permit and plans shall clearly indicate lighting to utilize a narrow cone of light (no brighter than approximately 15 watts) for the purpose of confining the light to the object of interest. 7. The location of any required backflow preventer and double-check assembly shall be shown on all site plans submitted for a building permit, including the landscaping plan. Construction plans shall also include a scaled diagram of the equipment proposed. Where possible, as determined by the Utilities Director, equipment shall be located inside the building within 20 feet of the front property line. Where this is not possible, as determined by the Utilities Director, the back flow preventer and double-check assembly shall be located in the street yard and screened using a combination of paint color, landscaping and, if deemed appropriate by the Community Development Director, a low wall. The size and configuration of such equipment shall be subject to review and approval by the Utilities and Community Development Directors. 8. The proposed archway sign shall be limited to a total area of 65 square feet, and shall be strictly used to identify the property. The archway sign shall not be used as advertisement space for any future tenants. 9. Any proposed signs are subject to review and approval of the Community Development Department and subject to a sign permit. The Community Development Department may approve proposed signs if found consistent with applicable sections of the sign regulations and provided signs are in keeping with the character and context of the building. The Community Development Director may refer signage to the ARC if signs appear to be excessive in size or out of character with the project. Engineering Division 10. Traffic impact fees shall be paid for this development prior to building permit issuance. Credit for removal of the existing buildings/pumps will be applied based on the use and/or areas of the existing development. 11. Projects involving the construction of new structures requires that complete frontage improvements be installed or that existing improvements be upgraded per city standards. MC 12.16.050 Attachment 1 ARC1 - 8 Resolution No. ARC-####-15 Page 4 1101 Monterey Street, ARCH-0150-2014 12. This project is located in the Mission Style Sidewalk District of downtown. All street frontages shall be upgraded to the Mission Style per City Standard #4220 due to the substantial amount of frontage replacement necessary for the project. 13. The building plan submittal shall correctly reflect the right-of-way width, location of frontage improvements, front property line locations, and all easements. All existing frontage improvements, street furniture, signage, vaults, and street trees shall be shown for reference. 14. Development of the driveway and parking areas shall comply with the Parking and Driveway Standards for dimension, maneuverability, slopes, drainage, and materials. Alternative paving materials are recommended for water quality and/or quality control purposes and in the area of existing or proposed trees and where the driveway or parking area may occur within the dripline of any tree. Alternative paving material shall be approved to the satisfaction of the Planning Division. 15. Provisions for trash, recycle, and green waste containment, screening, and collection shall be approved to the satisfaction of the City and San Luis Obispo Garbage Company. The respective refuse storage area and on-site conveyance shall consider convenience, aesthetics, safety, and functionality. Ownership boundaries and/or easements shall be considered in the final design. 16. Drainage from the trash enclosure shall comply with the city’s design guidelines and policies regarding water quality treatment prior to discharge to the storm drain system or gutter. 17. The building plan submittal shall include a complete site utility plan. All existing and proposed utilities along with utility company meters shall be shown. Existing underground and overhead services shall be shown along with any proposed alterations or upgrades. Unless otherwise accepted, services to the new structure shall be underground. All work in the public right-of-way shall be shown or noted. 18. The building plan submittal shall show protection of the existing 48” public storm drain pipe running from Monterey Street to Santa Rosa Street and the two existing 27” x 60” box culverts running through the middle of the property into Santa Rosa Street. New easements shall be recorded that show metes and bounds that reflect the actual locations of the 48” public storm drain pipe and the two 27” x 60” box culverts for the protection of these public utilities running through the property. The new easements shall supersede the 1970 document, but may contain the same language as the 1970 document which allows for construction over the easements. Amended easement agreement(s) shall be recorded prior to building permit issuance. 19. The applicant shall provide an inspection report from a licensed engineer on the condition of the existing 48” public storm drain and the two existing 27” x 60” box culverts located under the existing and proposed structures prior to demolition/construction permit issuance. A final inspection report shall be provided at the completion of construction. Any damage to the Attachment 1 ARC1 - 9 Resolution No. ARC-####-15 Page 5 1101 Monterey Street, ARCH-0150-2014 structure caused by construction activities shall be repaired by the owner/contractor to the satisfaction of the City. 20. The demolition and building plans in conjunction with the proposed construction methods shall be reviewed by the project soils engineer and project engineer of record regarding impacts to the existing storm drain structures. Pertinent recommendations shall be incorporated into the plan details, plan notes, and special inspection/structural observation requirements for the project. 21. The project is located within a mapped flood zone. The project is therefore subject to showing compliance with the Waterway Management Plan Drainage Manual. Provide a complete drainage report. The drainage report shall consider historic offsite drainage that may need to be conveyed on the property. 22. The property is located in an AO (2’ depth) Flood Zone as shown on the Flood Insurance Rate Map (FIRM) for the City of San Luis Obispo. The water surface or base flood elevation (BFE) of a 100-yr storm is 2’ above adjacent grade. The structure must be raised and/or floodproofed to an elevation that is at least one foot above the BFE or 3’ above the highest adjacent grade. Additional freeboard to 2’ above the BFE may result in additional structure protection and savings on flood insurance and is strongly encouraged. 23. The project shall comply with Post Construction Stormwater Requirements as regulated by the Regional Water Quality Control Board for redeveloped sites. 24. An operations and maintenance manual will be required for the post-construction stormwater improvements. A private stormwater conveyance agreement will be required and shall be recorded prior to final inspection approvals. If a direct connection to the public storm drain is proposed, an annual and recurring inspection fee will be required in accordance with the storm drain connection fee schedule in effect at the time of the permit approvals/connection. 25. One 15-gallon street tree shall be required for each 25 linear feet of frontage. The City Arborist shall approve tree species. New street tree plantings located in a sidewalk area shall be in tree wells in accordance with City Engineering Standard #8130 which includes a decorative metal tree grate and tree guard. 26. The two existing trees located in the existing and proposed planter areas along the northeasterly property line shall be retained unless otherwise approved for removal by the City Arborist and ARC. Tree protection measures shall be implemented to the satisfaction of the City Arborist. The City Arborist shall approve the proposed tree protection measures prior to commencing with any demolition, grading, or construction. The City arborist shall approve any safety pruning, the cutting of substantial roots or grading within the dripline of trees. A city approved arborist shall complete safety pruning. Any required tree protection measures shall be shown or noted on the building plans. Attachment 1 ARC1 - 10 Resolution No. ARC-####-15 Page 6 1101 Monterey Street, ARCH-0150-2014 Urban Forest Services (City Arborist) 27. All existing Street Trees must be protected in place. Tree Protection Measures shall adhere to the City of San Luis Obispo’s Standard Specifications 77-1.03A(2) Tree Protection (a) through (j). A Tree Protection Plan approved by the City Arborist will be required. The Tree Protection Fencing shall be installed before any grading, trenching or excavation begins. 28. The proposed removal of existing shrubs on the Northeast property line of the project and three carrotwoods behind the sidewalk along the Santa Rosa street frontage is approved. There is an existing Magnolia tree and other vegetation on the northeast property line that should be considered for retention however not required. 29. The landscape plan, tree planting proposal of 20 Parking Lot/Street Trees, is adequate mitigation for the proposed tree removals. Due to the tendency of the Pyrus calleryana to split apart and alternative tree species chosen from the Master Street Tree List is required. All other proposed tree species and placements are approved. Transportation 30. The applicant shall continue to work with City staff on minor revisions of the site layout so as to not preclude the future two-way conversion of Higuera St. also considering potential options on the south side of Higuera for achieving the necessary future cross-section. Utilities Department 31. The property’s existing sewer lateral to the point of connection at the City main must pass a video inspection, including repair or replacement, as part of the project. The CCTV inspection shall be submitted during the Building Permit Review Process for review and approval by the Utilities Department prior to issuance of a Building Permit. 32. Any existing water service or sewer lateral that will not be reused, shall be abandoned at the City main, consistent with City standards. 33. If commercial uses in the project include food preparation, provisions for grease interceptors and FOG (fats, oils, and grease) storage within solid waste enclosure(s) shall be provided with the design. These types of facilities shall also provide an area inside to wash floor mats, equipment, and trash cans. The wash area shall be drained to the sanitary sewer. Fire Department 34. All underground fuel storage tanks and associated piping shall be removed under a permit from the San Luis Obispo City Fire Department CUPA Participating Agency. Any contamination shall be remediated to the satisfaction of the CUPA and Regional Water Quality Control Board. Attachment 1 ARC1 - 11 Resolution No. ARC-####-15 Page 7 1101 Monterey Street, ARCH-0150-2014 35. Residual soil and groundwater contamination remains at the site and may be exposed during site redevelopment activities. Accordingly, the Central Coast Regional Water Quality Control board recommends the project proponent develop a hazardous substance mitigation plan prior to initiation of grading and construction activities. The plan shall provide an overview/background of the property, and describe the methodologies proposed for the identification, proper handing, on-site management, and disposal of petroleum hydrocarbon- contaminated soil and groundwater that will be generated during construction and dewatering activities. 36. Fire Department Access: Access shall be in accordance with Chapter 5 and Appendix D of the 2013 California Fire Code (CFC). Access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of 13’ 6”. Access roads shall be designed and maintained to support the imposed loads of a 60,000 pound fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. The all- weather access road(s) shall be installed prior to the start of combustible construction. Dead end roads in excess of 300 feet in length shall terminate in a cul-de-sac turnaround with a minimum unobstructed turning radius of 35 feet (70 foot diameter). At least 2 points of access are required where a roadway serves greater than 30 residential units. The maximum road grade for fire department access is 15%, with a maximum cross slope of 5%. The maximum angle of approach and angle of departure is 10%. 37. Address Numbers: Approved address numbers shall be placed on all new buildings in such a position to be plainly visible and legible from the street fronting the property. Numbers shall be a minimum of 5" high x 1/2" stroke and be on a contrasting background. 38. Water Supplies: Water Supplies shall be in accordance with Sections 507 of the CFC. An approved water supply capable of providing the required fire flow for fire protection is required. The fire flow shall be determined using Appendix B of the CFC. 39. Fire Department Access to Equipment: Rooms or areas containing controls for air-handling systems, automatic fire-protection systems, or other diction, suppression or control elements shall be identified for use by the fire department and shall be located in the same area. A sign shall be provided on the door to the room or area stating “Fire Sprinkler Riser” and “Fire Alarm Control Panel”. Fire sprinkler risers shall be located in a room with exterior door access. This requirement applies to all commercial buildings, including multi-family residential buildings. 40. Knox Box: A Knox Box shall be provided on the outside of the Fire Sprinkler Riser Room with a key to the room. 41. Fire Protection Systems and Equipment: Fire protection systems shall be installed in accordance with the California Fire Code and the California Building Code. An approved NFPA 13 fire sprinkler system and an NFPA 72 fire sprinkler monitoring system will be required. Shop Drawings and Specifications shall be submitted for review and approval prior to installation. Attachment 1 ARC1 - 12 Resolution No. ARC-####-15 Page 8 1101 Monterey Street, ARCH-0150-2014 42. Fire Main and all associated control valves shall be installed per NFPA 24 Standards and City Engineering standards. 43. Fire Safety During Construction: Buildings undergoing construction, alteration or demolition shall be in accordance with Chapter 34 of the CFC. 44. Chapter 7A Partial Requirements. This project will required the following requirements of the 2013 California Building Code, Chapter 7A, Materials and Construction Methods for Exterior Wildfire Exposure, to include a Class A fire rated roof assembly, ignition resistant vents (roof, attic, eve, and underfloor vents), and noncombustible siding. On motion by Commissioner ___________, seconded by Commissioner _____________, and on the following roll call vote: AYES: NOES: REFRAIN: ABSENT: The foregoing resolution was passed and adopted this 5th day of January, 2015. _____________________________ Phil Dunsmore, Secretary Architectural Review Commission Attachment 1 ARC1 - 13 O C-R C-R OC-D PF C-R O C-D C-D-H C-R O C-RO O C-D PF-H C-D-H C-D-H-PD HIGUE R A T O R O MONTE R E Y S A N T A R O S A MARSH PALM VICINITY MAP File No. 0150-20141101 Monterey ¯ Attachment 2 ARC1 - 14 project statement/ supplement to the application for the proposed SANTA ROSA STREET DEVELOPMENT 1101 Monterey Street San Luis Obispo, CA 93401 Prepared on behalf of PEDP, INC. 684 Higuera Street, Suite B San Luis Obispo, Ca 93401 by Oasis Associates, Inc. 3427 Miguelito Court San Luis Obispo, Ca 93401 805.541-4509 05 September 2014 Attachment 3 ARC1 - 15 Santa rosa street development PEDP, Inc. Oasis Associates, Inc. 05 September 2014 Table of Contents I. INTRODUCTION ............................................................................................................ 1 B. Existing Conditions & Demolition .............................................................................. 1 II. PROJECT DESIGN ......................................................................................................... 2 A. Architecture ................................................................................................................. 2 B. Civil/Stormwater Compliance ..................................................................................... 2 C. Landscape Architecture ............................................................................................... 3 III. CONFORMANCE TO ZONING REGULATIONS ........................................................ 3 A. Use (§17.22.010) ......................................................................................................... 3 B. Lot Coverage/ Floor Area Ratio (§17.40.020) ............................................................ 3 C. Yards/Setbacks (§17.16.020) ...................................................................................... 4 D. Height (§17.40.020) .................................................................................................... 4 E. Parking & Access (§17.16.060) .................................................................................. 4 F. Public Art (§17.98) ...................................................................................................... 4 G. Signage (§15.40) ......................................................................................................... 4 IV. COMMUNITY DESIGN GUIDELINES ......................................................................... 5 A. Neighborhood Compatibility, Architecture & Design Consistency (§§3.1.A, 3.1.B) . 6 B. Building Materials (§3.1.B.10).................................................................................... 6 C. Entries Building & Parking Location (§§3.1.B.8; 3.1.C.2) ......................................... 7 D. Lighting (§§3.1.C.4, 6.1.C) ......................................................................................... 7 E. Refuse, Storage, & Equipment Areas (§3.1.C.6) ........................................................ 7 V. LAND USE AND CIRCULATION ELEMENT UPDATE ............................................ 7 VI. PROJECT TEAM ............................................................................................................. 8 Attachment 3 ARC1 - 16 Santa rosa street development PEDP, Inc. Oasis Associates, Inc. 05 September 2014 Appendices Appendix A Preliminary Title Report Fidelity National Title Company April 23, 2013 Appendix B ALTA Land Survey (11” x 17” reduction) MBS Land Surveyors July 08, 2013 Appendix C Design Schematic (11” x 17”) RRM Design Group, et al September 4, 2014 Appendix D Preliminary Hydrology Report and Post Construction Stormwater Control Plan & Post-Construction Stormwater Checklist Ashley & Vance Engineering, Inc. August 4, 2014 Appendix E Soils Engineering Report Update GeoSolutions, Inc. August 19, 2014 Appendix F Review of Proposed Stormwater Infiltration System GeoSolutions, Inc. August 8, 2014 Appendix G Notice of Technical Infeasibility for Post-Construction Stormwater Management Requirement Ella Foley Gannon, Esq. August 29, 2014 Attachment 3 ARC1 - 17 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 1 of 8 Project Statement / Supplement to the application for the proposed SANTA ROSA STREET DEVELOPMENT 1101 Monterey Street San Luis Obispo, CA 93401 APN 002-436-011 05 September 2014 I. INTRODUCTION Historically, the development on the corner of Monterey Street and Santa Rosa Street has reflected the vehicle-centric requirement to maintain gas stations on prominent corners in most USA cities. With a shift toward walkable communities and alternative modes of transportation, underutilized properties are being afforded a critical eye toward redevelopment scenarios that better represent where a cit y aspires to be in the context of “liveable” communities. The proposed Santa Rosa Street Development is located at one of San Luis Obispo’s most prominent gateways – Santa Rosa Street & Monterey Street. The proposed development is designed to reflect the new urban character and quality design that is characteristic of contemporary development in the City. A. Project area & Context The proposed development is a new 10,000 square feet (SF) of commercial buildings located at 1101 Monterey Street (APN 002-436-011). The subject property is 30,412 SF (.70 acres) and zoned Commercial Retail (C-R). The proposed development includes two (2) 5,000 SF one-story buildings, a small plaza, landscaping, on-site parking, and associated site improvements. The project is located on the northerly side of Santa Rosa Street, which is commonly considered the boundary between the Downtown Core and Upper Monterey District. The surrounding zoning and uses include:  Westerly: Commercial Retail / Medical Office  Easterly: Commercial Retail / Bank  Northerly: Commercial Retail / Office and car dealership  Southerly: Downtown Commercial / County Government Building B. Existing Conditions & Demolition The subject property is currently an operating gas and service station. The proposed development will require demolition of the existing structures and related amenities. The requisite special considerations for demolition of the existing buildings, underground storage tanks, and associated elements will be in accordance with applicable building and safety code requirements, including coordination with the San Luis Obispo County Air Pollution Control District and San Luis Obispo City Fire Department. The proposed development requires removal of the existing on-site trees; three (3) carrotwood trees of medium height and one (1) magnolia tree. The two (2) street trees adjacent to the property will remain in place. The proposed development includes new site trees, as well as additional street trees. Attachment 3 ARC1 - 18 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 2 of 8 II. PROJECT DESIGN A. Architecture The inspiration for the design of the Santa Rosa Street Development came from the “commercial vernacular” style that is a large part of the character of Downtown San Luis Obispo. This style consists of unpretentious commercial structures with restrained decorative ornamentation, that are representative of buildings that were often constructed during the late 19th and early 20th centuries. Due to the presence of local brick production at the Brickyard on Broad Street during the turn of the 20th century, brick buildings are found throughout the downtown area. Historical buildings such as the “Big Sky” restaurant and the J.P. Andrews Building provided inspiration for the Santa Rosa Street Development. Character-defining features of this style include: • Square and rectangular forms; • Flat roofs with flat and stepped parapets; • Primarily brick exterior wall surfaces and façades; • First-story storefronts with transom windows above; and • Decorative detailing including cornices and stringcourses of brick. Traditionally, buildings of this style did not span an entire city block. Therefore, the project was designed in third – two (2) corner buildings and a center void filled with a brick façade and steel archway feature, connecting the two buildings. Through time, historic brick buildings have been retrofitted with steel structural supports and expressive awning features. To reference this, steel is used to frame openings, support entry features, and as awning construction. Each building is differentiated by its brick color and detailing. The buildings are, however, linked with the overall minimal detailing style, parapet roofs, and use of steel retrofit support. While the overall style of the buildings references a historic style, use of contemporary forms at the raised entry features at the Higuera Street and Monterey Street corners truthfully place the buildings in today’s era. The reference to history with contemporary honesty contextually aligns this project with the character of San Luis Obispo. B. Civil/Stormwater Compliance The subject property contains on-site slopes that are less than 2%, while existing surfacing is mostly impervious asphalt concrete. The site mostly slopes to the south east, towards Santa Rosa Street. There are six (6) existing driveway entrances to the site, two (2) on Monterey, two (2) on Santa Rosa and two (2) on Higuera. The northern portion of the site slopes out to the gutter in Monterey and flows toward the northwest and enters the public storm drain system via an existing catch basin downstream on Monterey Street. The runoff from the balance of the site slopes to Higuera Street and Santa Rosa Street, and enters the public storm drain system at an existing catch basin on Santa Rosa Street near the intersection of Higuera Street. The stormwater leaves the catch basin via an existing 18-inch storm drain and enters a 6 foot x 8 foot box culvert, located at the south side of Santa Rosa Street. The site literally sits atop a 48-inch RCP storm drain and two (2) 27-inch x 60-inch box culverts that converge into one (1) 6 foot x 8 foot box culvert located approximately mid-block of Santa Rosa Street. This box culvert traverses Santa Rosa Street and continues around the corner down Higuera Street. The box culvert outlets underground to San Luis Creek below Higuera Street, midway between Santa Rosa Street and Osos Street. Attachment 3 ARC1 - 19 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 3 of 8 The proposed project consists of two (2) commercial buildings, relocation of three (3) driveways, and associated on-site parking and landscaping. Runoff from the site will be directed to pervious areas. Treatment for the on-site runoff will be provided prior to discharge into the public right of way. The proposed project utilities will be served predominantly from existing infrastructure. A transformer upgrade will be required for the electrical service. Water will be supplied by an existing 10-inch water main in Monterey and an 8-inch main in Higuera Street. New sewer tie-ins are proposed in both Monterey Street and Higuera Street. See Appendix D – Preliminary Hydrology Report and Post Construction Stormwater Control Plan & Post-Construction Stormwater Checklist. C. Landscape Architecture The landscape architecture design intent is to temper the areas of hardscape, screen utility equipment, and accent architectural features. As importantly, plant material and the irrigation system have been designed to conserve water! The landscape design complies with the City of San Luis Obispo Uniform Design Criteria. All plant material was selected for its compatibility to climatic conditions, specific site locations, and for drought tolerance. All plant material selected has low water requirements per WUCOLS. The water calculation for the Santa Rosa Development shows the estimated water use (ETWU) will be 36% less than the maximum applied water allowance (MAWA). The irrigation system will be a fully automatic system utilizing in-line drip irrigation. Irrigation hydrozones shall be separated with control valves and controller stations, and all valves will have pressure regulators and filters. In addition, all plant beds shall have a minimum of a 2-inch layer of organic mulch throughout to minimize soil moisture evaporation and improve water retention. III. CONFORMANCE TO ZONING REGULATIONS The Santa Rosa Street Development is located in the Commercial Retail (C-R) zone and complies with all the applicable zoning regulations, as noted below. No exceptions to the zoning regulations are requested. Please see “Signs” below for a request for exception to the sign regulations for review and approval by the Architectural Review Commission. A. Use (§17.22.010) The currently anticipated tenants of the proposed development include a bank and general retail establishment, and are allowed per the Zoning Regulations without the need for a use permit. The ultimate tenant mix may be modified as market forces dictate. If a tenant use comes forward that requires a use permit, the entitlement application will be submitted separately and independently from the overall site development. B. Lot Coverage/ Floor Area Ratio (§17.40.020) The proposed lot coverage of 33% and floor area ratio (FAR) of .33 are well below the maximum 100% lot coverage and 3.0 FAR allowed by the Zoning Regulations. Attachment 3 ARC1 - 20 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 4 of 8 C. Yards/Setbacks (§17.16.020) The subject property is zoned C-R and adjacent to C-R, therefore no street yard or side yards are required. The proposed buildings are located at the property line along Santa Rosa, Monterey and Higuera Streets. This provides a strong street-front presence, while providing on-site parking at the interior and “back” of the property. D. Height (§17.40.020) The proposed building height of 30 feet is well below the maximum allowed height of 45 feet. E. Parking & Access (§17.16.060) Vehicle access to the site has been reduced from the current six (6) access points to three (3). This allows one ingress/egress along each street frontage (Monterey Street, Santa Rosa Street, and Higuera Street). The access points provide efficient use and internal circulation of the on-site parking. The anticipated uses of a bank and general retail require 33 parking spaces. (Bank and general retail require 1 space per 300 SF of floor area; or 10,000 SF/ 300 SF = 33 spaces). The proposed project provides 40 parking spaces including four (4) accessible spaces, plus an additional two (2) motorcycle parking spaces. The provided parking allows flexibility for potential future changes in tenant use. For example, the parking provided could also accommodate tenant uses such as personal service or a small café in a portion of one of the buildings. Bicycle parking is provided at the rate of 15% of required vehicle parking spaces and distributed between short-term and long-term parking. Bicycle racks provide four (4) short-term spaces and a bicycle locker provides two (2) long-term spaces. F. Public Art (§17.98) In lieu of on- or off-site placement of approved public art, the applicant will voluntarily pay the alternative in-lieu fee equal to ½ of 1% of the total construction cost prior to the issuance of building permits. G. Signage (§15.40) The sign regulations for the C-R zone allows up to four (4) signs per tenant with a maximum cumulative sign area of 200 square feet per tenant. All sign types are allowed in the C-R zoning. The proposed project includes tenant wall signs, awning/ledge signs, and a projecting blade sign. The design also includes an entry archway over the Santa Rosa Street vehicle entrance identifying the property. This archway “feature” is not a sign type detailed in the regulations, but Article VI – “Exceptions to Sign Standards” has been created to provide for signage alternatives and stipulates findings to approve an exception including: B. The sign for which an exception is requested is a nonconforming sign that acts as a neighborhood landmark or focal point while not disrupting views of prominent community landscape features. When granting an exception, the ARC or the director shall require that as many nonconforming elements of the sign as possible be eliminated while allowing its basic form and character to remain. Attachment 3 ARC1 - 21 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 5 of 8 C. The exception is consistent with the intent and purpose of the sign regulations (see Section 15.40.110) and will not constitute a grant of special privilege or entitlement inconsistent with limitations applied to other properties in the vicinity with the same zoning. D. The sign exception is for superior design, will not result in visual clutter and is consistent with the intent and purpose of these sign regulations. (Ord. 1455 § 2 (part), 2004) As measured per the regulations, the archway “feature” sign area is 65 SF. The proposed cut metal lettering attached to an open steel trellis will not disrupt or clutter public views. The quality and design of the feature is intended to act as an identifying landmark and will not be used to identify specific tenants or businesses in the development. Tenant signage for each building is proposed as follows: MONTEREY STREET BUILDING TENANT SIGNS Sign Location Sign Type Size (SF) Monterey Street Wall 20 Monterey Street Awning/Ledge 16 Santa Rosa Street Projecting/Blade 4 Rear Awning/Ledge 12 Interior Side (none) TOTAL 4 Signs 52 HIGUERA STREET BUILDING TENANT SIGNS Sign Location Sign Type Size (SF) Higuera Street Wall 24 Santa Rosa Street Awning/Ledge 16 Santa Rosa Street Wall 24 Rear (none) Interior Side Awning/Ledge 12 TOTAL 4 Signs 76 The total aggregate building signage for both buildings is 128 SF. The project signage meets the “Sign Standards by District” requirements (§15.40460) for C-R zoning with a total of 4 signs per tenant and well under the 200 SF allowed per tenant. The proposed signage was judicially located and designed for efficient visibility for both vehicle and pedestrian traffic while minimizing the total amount of site signage; the total aggregate site signage, including the entry feature sign, is 193 SF. See Appendix C – Design Schematic for signage details. IV. COMMUNITY DESIGN GUIDELINES The Community Design Guidelines were carefully considered during the design process. The Commercial Project Design Guidelines (Chapter 3.1) have been fully integrated into the Santa Rosa Street Development. Attachment 3 ARC1 - 22 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 6 of 8 A. Neighborhood Compatibility, Architecture & Design Consistency (§§3.1.A, 3.1.B) The proposed building design is a contemporary distillation and configuration of the surrounding eclectic design elements familiar to and endeared by the community and visitors alike, creating an attractive and distinct development that suits the City’s ever emerging urban character. The project is located at the gateway to the Upper Monterey area and adjacent to the Downtown Core (C-D district). The Downtown Core is characterized by multi-story buildings with consistent street front presence. Upper Monterey is characterized by less intense development of mostly one- and two- story buildings with periodic street front “voids” due to on-site surface parking. The development is designed as both a gateway to Downtown and the westerly bookend to the Upper Monterey area. The existing developments directly adjacent to the subject property vary in size and style as follows:  Northerly: One-story mid-20th century modern buildings  Westerly: One-story bank building  Easterly: Two-story mission-style medical diagnostic center  Southerly: Four-story modern contemporary style building (County Government Administration Building), one of the taller buildings in the Downtown. The buildings have been purposely designed as “tall” one-story buildings to act as a transition step between the lower-height structures of the Upper Monterey area and the taller buildings of Downtown. The buildings are designed with varied roof heights and horizontal articulation to provide visual interest. The parapets and varied roof lines effectively screen mechanical equipment from public view. Locating the building at the corners of the property and at back of sidewalk was purposeful to provide a strong street-front presence. Ample street level windows on all sides enhance the pedestrian experience and interaction with the buildings, while providing daylighting. Deliberate “four sided” design has been used to eliminate any mundane or “neglected” façades. The similar style and design elements are used for each of the proposed buildings in order to create a cohesive architectural design. The buildings relate to each other while allowing each building to maintain an individual character. The proposed archway feature over the Santa Rosa Street entry strengthens the link and cohesion between the buildings and pays homage to the traditional rural entry features of local ranches. B. Building Materials (§3.1.B.10) Building materials were carefully selected for authenticity and honesty and use, accordingly. The materials were chosen to enhance the consistency of the architectural design. The material palette includes simple and clean elements of brick, steel, aluminum, and concrete. The tonal brown brick and warm grey colors complement the material selection to create handsome and formal buildings with straight forward form and detailing. The buildings’ brick walls are grounded by a concrete wainscot base. Brick soldier course banding provides horizontal rhythm breaks to the upper wall sections. The buildings are capped with additional soldier and rowlock course brick banding. Attachment 3 ARC1 - 23 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 7 of 8 C. Entries Building & Parking Location (§§3.1.B.8; 3.1.C.2) The overall building massing is oriented parallel to the streets with strong corner features to emphasize the building entries and provide a strong street and pedestrian presence. Corner entries maximize the human-scale dynamic of the buildings with defined and visible approaches/entries to the buildings. The presence of the on-site parking has been minimized by locating the parking field to the interior of the property, as much as possible. Landscaping is incorporated in and around the parking area to provide shade and also soften and screen the area. D. Lighting (§§3.1.C.4, 6.1.C) The proposed project site lighting fixtures have been selected to be compatible with the overall architectural design of the building. Site lighting is designed to provide security and safety lighting for the parking area. A photometric plan has been completed to ensure compliance with the City’s Night Sky Preservation regulations. The 16 foot tall fixtures in the parking area have been designed to the lowest height possible while still providing adequate safety lighting. Building lighting will provide pedestrian lighting for safety and also highlight and enhance the buildings architectural design. See Appendix C – Design Schematic for lighting details. E. Refuse, Storage, & Equipment Areas (§3.1.C.6) A City standard D-4 trash enclosure is located on the east side of the parking area and intended to service both buildings. The style of the enclosure will complement the overall building design and materials. A transformer and back flow prevention valve are located at the northeast and southeast corners of the subject property and landscaped areas; plantings will visually screen the equipment to the fullest extent possible, while maintaining adequate service access. The buildings’ mechanical equipment will be screened by roof parapets. V. LAND USE AND CIRCULATION ELEMENT UPDATE The City is currently in the process of updating the City’s General Plan Land Use and Circulation Elements (“LUCE”). The goals, vision, and programs contained in the LUCE are intended to direct the regulatory framework for future development in the City. The draft LUCE update identifies the subject property to be located within the Upper Monterey Special Planning Area. While the LUCE proposes no physical land use change for the area, there are several action items proposed for the Planning Area including:  Development of an area master plan and design guidelines;  Consideration to include the area in the Downtown Parking District, thus allowing in-lieu payment towards common parking facilities;  Integration of a new Downtown Transit center and greater connectivity including hotel shuttles; and  Promotion of restaurant development. As the LUCE update has not been promulgated, is does not have any direct authority in the review of the proposed project. However, the action items proposed have potential future impact to the subject property. The most significant action item would likely be inclusion in the Downtown Parking District which would provide an increased flexibility for potential tenant uses, including restaurant use, as promoted in the draft LUCE. Attachment 3 ARC1 - 24 SANTA ROSA STREET DEVELOPMENT PEDP, Inc. Oasis Associates, Inc. 05 September 2014 8 of 8 VI. PROJECT TEAM A. Applicant/Property Owner PEDP, Inc Mr. Nick Tompkins 684 Higuera Street, Suite B San Luis Obispo, CA 93401 805.541.9004 nick@nktcommercial.com B. Applicant’s Agent Oasis Associates, Inc. C.M. Florence, AICP 3427 Miguelito Court San Luis Obispo, CA 93401 805.541.4509 cmf@oasisassoc.com C. Project Architect RRM Design Group Mr. Michael Scott 3765 South Higuera Street, Suite 102 San Luis Obispo, CA 93401 805.543.1794 mlscott@rrmdesign.com D. Project Civil Engineer Ashley & Vance Engineering Mr. Truitt Vance, P.E. 1413 Monterey Street San Luis Obispo, CA 93401 805.545.0010 truitt@ashleyvance.com E. Landscape Architect Firma Landscape Architects Mr. David Foote, ASLA 187 Tank Farm Road, Suite 230 San Luis Obispo, CA 93401 805.781.9800 david@firmaconsultants.com Attachment 3 ARC1 - 25 1 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 TI T L E S H E E T PR O J E C T S T A T I S T I C S PA R K I N G PR O J E C T D I R E C T O R Y PR O J E C T D E S C R I P T I O N SU S T A I N A B L E S T R A T E G I E S VI C I N I T Y M A P ZO N I N G M A P SH E E T I N D E X OW N E R : PE D P , I N C . N I C K T O M P K I N S 68 4 H I G U E R A S T R E E T , S U I T E B S A N L U I S O B I S P O , C A 9 3 4 0 1 AR C H I T E C T : RR M D E S I G N G R O U P 3 7 6 5 S . H I G U E R A S T R E E T , S U I T E 1 0 2 S A N L U I S O B I S P O , C A 9 3 4 0 1 C O N T A C T : M I K E S C O T T P H O N E : ( 8 0 5 ) - 5 4 3 - 1 7 9 4 E M A I L : M L S C O T T @ R R M D E S I G N . C O M PR O J E C T A D D R E S S : 11 0 1 M O N T E R E Y S T R E E T S A N L U I S O B I S P O , C A 9 3 4 0 1 AP N N U M B E R S : 00 2 - 4 3 6 - 0 1 1 EX I S T I N G S T R U C T U R E S T O B E D E M O L I S H E D . N E W DE V E L O P M E N T T O I N C L U D E T W O S I N G L E - S T O R Y 5 0 0 0 SQ U A R E F O O T B U I L D I N G S , R E L A T E D P A R K I N G , P L A Z A , AN D L A N D S C A P E I M P R O V E M E N T S . O N E B U I L D I N G I S AN T I C I P A T E D T O H O U S E A B A N K T E N A N T W H I L E T H E O T H E R BU I L D I N G I S A N T I C I P A T E D T O H O U S E A R E T A I L T E N A N T . ZO N I N G : C- R MA X H E I G H T A L L O W E D : 4 5 F T . MA X . P R O P O S E D H E I G H T : 2 9 . 5 F T . MA X . L O T C O V E R A G E : 1 0 0 % ( 3 0 , 4 1 2 S F ) PR O P O S E D C O V E R A G E . : 3 3 % ( 1 0 , 0 0 0 S F ) MA X . F . A . R : 3. 0 ( 9 1 , 2 3 6 S F ) PR O P O S E D F . A . R : .3 3 ( 1 0 , 0 0 0 S F ) LA N D S C A P E A R E A : 2 , 4 2 6 S F IM P E R V I O U S S U R F A C E : 1 6 , 7 3 9 S F AU T O P A R K I N G PA R K I N G R E Q U I R E D : 3 3 S P A C E S (G E N E R A L R E T A I L M O R E T H A N 2 0 0 0 SF U P T O 1 5 , 0 0 0 S F @ 1 / 3 0 0 S F ) SP A C E S P R O V I D E D : 4 0 S P A C E S MO T O R C Y C L E P A R K I N G MO T O R C Y C L E P A R K I N G R E Q U I R E D : 2 S P A C E S (1 / 2 0 S P A C E S ) MO T O R C Y C L E P A R K I N G P R O V I D E D : 2 S P A C E S BI C Y C L E P A R K I N G BI C Y C L E S P A C E S R E Q U I R E D : 5 S P A C E S (C - R Z O N E - 1 5 % O F A U T O S P A C E S ) SH O R T T E R M S P A C E S P R O V I D E D : 4 S P A C E S (M I N S H O R T T E R M S P A C E - 5 0 % ) LO N G T E R M S P A C E S P R O V I D E D : 2 S P A C E S (M I N L O N G T E R M S P A C E - 4 0 % ) TO T A L P R O V I D E D : 6 S P A C E S 1 T I T L E S H E E T 2 C O N T E X T A N D I N S P I R A T I O N 3 E X I S T I N G S I T E S U R V E Y 4 P R O P O S E D S I T E P L A N 5 P E R S P E C T I V E V I E W 6 E L E V A T I O N S 7 E L E V A T I O N S 8 E L E V A T I O N S 9 S I T E S E C T I O N S 10 C O L O R A N D M A T E R I A L S B O A R D 11 S I T E W A L L A T E N T R Y 12 D E T A I L S 13 T R A S H E N C L O S U R E 14 F R O N T S I G N 15 R E A R S I G N 16 S I T E L I G H T I N G A N D P H O T O M E T R I C S 17 S I T E L I G H T I N G A N D S I G N D E T A I L S 18 C I V I L D E M O P L A N 19 C I V I L G R A D I N G A N D D R A I N A G E P L A N 20 C I V I L G R A D I N G A N D D R A I N A G E D E T A I L S 21 C I V I L U T I L I T Y P L A N 22 L A N D S C A P E P L A N SI T E PE R S P E C T I V E V I E W - S A N T A R O S A A N D M O N T E R E Y - B I O S W A L E S T O R E C E I V E P A R K I N G L O T R U N O F F - L I D S T O R M W A T E R S T O R A G E + M E T E R I N G - D I S C O N N E C T E D R O O F D R A I N A G E P A T H T H R O U G H LA N D S C A P I N G - S H I E L D E D S I T E L I G H T I N G - C O O L R O O F A T B U I L D I N G - D A Y L I G H T H A R V E S T I N G - E X T E R I O R S U N C O N T R O L D E V I C E S - R E C Y C L A B L E S T E E L S T R U C T U R E M A T E R I A L - W A T E R R E D U C I N G F I X T U R E S - H I G H A L B E D O C O N C R E T E A T W A L K W A Y S - S O L A R R E A D Y Attachment 4 ARC1 - 26 2 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 CO N T E X T A N D I N S P I R A T I O N Attachment 4 ARC1 - 27 3 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 EX I S T I N G S I T E S U R V E Y 0 SC A L E 1 ” = 2 0 ’ 20 4 0 6 0 10 SC A L E : 1 ” = 4 0 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) Attachment 4 ARC1 - 28 4 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 PR O P O S E D S I T E P L A N 0 SC A L E 1 ” = 8 ’ 81 624 4 NE W S I D E W A L K CU R B A N D G U T T E R EX T E R I O R L I G H T S CU R B R A M P P E R CI T Y S T A N D A R D S CU R B R A M P P E R CI T Y S T A N D A R D S EX I S T I N G F I R E HY D R A N T EX T E R I O R L I G H T S S E E SH E E T 1 7 F O R A D D I T I O N A L IN F O R M A T I O N . NE W S I D E W A L K AN D C U R B PA R K I N G A R E A NE W ST R E E T T R E E S LA N D S C A P E LA N D S C A P E SI T E W A L L NE W ST R E E T T R E E S NE W ST R E E T T R E E NE W ST R E E T T R E E EX I S T I N G ST R E E T T R E E EX I S T I N G ST R E E T T R E E EX I S T I N G FI R E H Y D R A N T EX I S T I N G FI R E H Y D R A N T 22 3 . 0 6 ’ 22 5 . 0 0 ’ SE E S H E E T 1 7 F O R A D D I T I O N A L L I G H T I N G I N F O R M A T I O N 136.00’ 135.99’ EX I S T I N G ST R E E T T R E E (2 4 ” X 3 6 ” ) SC A L E 1 ” = 1 6 ’ ( 1 2 ” X 1 8 ” ) Attachment 4 ARC1 - 29 5 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 PE R S P E C T I V E V I E W PE R S P E C T I V E V I E W - S A N T A R O S A A N D H I G U E R A Attachment 4 ARC1 - 30 ME T A L F A S C I A ST E E L A R C H ME T A L P A N E L ST E E L M E M B E R FL A S H I N G RU N N I N G B O N D BR I C K BR I C K S O L D E R CO U R S E B A N D I N G ME T A L P A N E L RA I S E D L E T T E R I N G BR I C K S O L D I E R C O U R S E BR I C K P I L A S T E R AW N I N G CO N C R E T E B A S E SI D E W I N D O W BR I C K C O L U M N AW N I N G AW N I N G RU N N I N G B O N D BR I C K ME T A L P A N E L 6 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 EL E V A T I O N S SA N T A R O S A E L E V A T I O N RE A R E L E V A T I O N 0 SC A L E 1 ” = 8 ’ 81 624 4 SC A L E 1 ” = 1 6 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) Attachment 4 ARC1 - 31 ME T A L F A S C I A SI D E W I N D O W S FL A S H I N G ME T A L P A N E L FL A S H I N G RU N N I N G B O N D BR I C K RU N N I N G B O N D BR I C K AT M MA C H I N E BR I C K S O L D E R CO U R S E B A N D I N G BR I C K S O L D E R CO U R S E B A N D I N G ME T A L P A N E L AW N I N G CO N C R E T E B A S E 7 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 EL E V A T I O N S SO U T H S I D E E L E V A T I O N MO N T E R E Y E L E V A T I O N 29 ’ - 6 ” T . O . R . 29 ’ - 6 ” T . O . R . 25 ’ - 0 ” T . O . P . 25 ’ - 0 ” T . O . P . 19 ’ - 0 ” T . O . S . 19 ’ - 0 ” T . O . S . 15 ’ - 0 ” C L G . 15 ’ - 0 ” C L G . 0’ - 0 ” F . F . 0’ - 0 ” F . F . 0 SC A L E 1 ” = 8 ’ 81 624 4 SC A L E 1 ” = 1 6 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) Attachment 4 ARC1 - 32 ME T A L P A N E L ST E E L H E A D E R BR I C K S O L D I E R C O U R S E B R I C K P I L A S T E R AW N I N G A W N I N G RU N N I N G B O N D BR I C K 0 SC A L E 1 ” = 8 ’ 81 624 4 SC A L E 1 ” = 1 6 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) 8 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 29 ’ - 6 ” T . O . R . 29 ’ - 6 ” T . O . R . 25 ’ - 0 ” T . O . P . 25 ’ - 0 ” T . O . P . 19 ’ - 0 ” T . O . S . 19 ’ - 0 ” T . O . S . 15 ’ - 0 ” C L G . 15 ’ - 0 ” C L G . 0’ - 0 ” F . F . 0’ - 0 ” F . F . HI G U E R A E L E V A T I O N NO R T H S I D E E L E V A T I O N Attachment 4 ARC1 - 33 0 SC A L E 1 ” = 1 0 ’ 10 2 0 3 0 5 SC A L E : 1 ” = 2 0 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) 9 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 SI T E S E C T I O N S 25 ’ - 0 ” T . O . P . 25 ’ - 0 ” T . O . P . 19 ’ - 0 ” T . O . S . 19 ’ - 0 ” T . O . S . 15 ’ - 0 ” C L G . 15 ’ - 0 ” C L G . 0’ - 0 ” F . F . 0’ - 0 ” F . F . SE C T I O N 2 SE C T I O N 1 RE T A I L S P A C E 5 , 0 0 0 S F EX I S T I N G BU I L D I N G (N . I . C . ) EX I S T I N G BU I L D I N G (N . I . C . ) PA R K I N G AR E A SA N T A R O S A ST R E E T HI G U E R A ST R E E T MO N T E R E Y ST R E E T RE T A I L S P A C E 5 , 0 0 0 S F PA R K I N G AR E A RE T A I L S P A C E 5 , 0 0 0 S F HV A C U N I T S HV A C U N I T S HV A C U N I T Attachment 4 ARC1 - 34 BR I C K MI S S I O N A U T U M N G O L D AL U M I N U M A W N I N G & ME T A L W A L L P A N E L PW E T E R AL U M I N U M A W N I N G PO R T L A N D S T O N E CO N C R E T E B A S E BR I C K WI L L I A M S B U R G ST E E L AL U M I N U M A W N I N G & ME T A L P A N E L PW E T E R CO N C R E T E B A S E 10 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 CO L O R A N D M A T E R I A L S B O A R D PE R S P E C T I V E V I E W - S A N T A R O S A A N D M O N T E R E Y PE R S P E C T I V E V I E W - S A N T A R O S A A N D H I G U E R A Attachment 4 ARC1 - 35 ME T A L ME T A L L E T T E R S BR I C K M O N O B U C K PR E C A S T C O N C R E T E 11 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 SI T E W A L L A T E N T R Y D E T A I L 3’ - 2 ” T . O . B A S E 12 ’ - 0 ” T . O . B E A M 20 ’ - 6 ” T . O . C O L U M N 1/ 2 ” = 1 ’ - 0 ” 1/ 4 ” = 1 ’ - 0 ” ( 1 2 ” X 1 8 ” ) 1/ 8 ” = 1 ’ - 0 ” ( 1 2 ” X 1 8 ” ) 1/ 4 ” = 1 ’ - 0 ” ST E E L H E A D E R ST E E L C O N N E C T I O N ST E E L T R U S S A R C H RU N N I N G B O N D B R I C K BR I C K D E T A I L I N G RA I S E D L E T T E R S 20’-6” SO L D I E R C O U R S E B R I C K LI G H T CO N C R E T E C A P RO W L O C K BR I C K S I L L SI T E W A L L A T E N T R Y E L E V A T I O N SC A L E : 1 / 4 ” = 1 ’ - 0 ” SC A L E : 1 / 8 ” = 1 ’ - 0 ” ( 1 2 ” X 1 8 ” ) PL A N V I E W CO L U M N D E T A I L Attachment 4 ARC1 - 36 12 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 SI T E D E T A I L S HI G U E R A B U I L D I N G -1 HI G U E R A A N D M O N T E R E Y B U I L D I N G HI G U E R A A N D M O N T E R E Y B U I L D I N G -2 -3 -4 Attachment 4 ARC1 - 37 CO N C R E T E PR E C A S T C O N C R E T E CA P 13 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 TR A S H E N C L O S U R E ST A N D I N G S E A M R O O F ST E E L B E A M , T Y P ST E E L C O L U M N , T Y P CI T Y O F S A N L U I S O B I S P O S T A N D A R D - SC A L E 1 / 4 ” = 1 ’ ( 1 2 ” X 1 8 ” ) SC A L E 1 / 2 ” = 1 ’ ( 2 4 ” X 3 6 ” ) 0 1 2 4 6 PA I N T E D P L A S T E R CO P P E R K E T T L E PA I N T E D S T E E L M A T C H AW N I N G - P W E T E R PE R F O R A T E D S H E E T ME T A L ST A N D I N G S E A M R O O F AE P S P A N - Z I N C G R E Y PA I N T E D S T E E L M A T C H AW N I N G - P O R T L A N D S T . Attachment 4 ARC1 - 38 19’-0”19’-0” 12’-0” 14 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 FR O N T S I G N S WA L L M O U N T E D S I G N RA I S E D C H A N N E L L E T T E R S AR E A ( 8 ’ X 3 ’ ) 2 4 S F - T Y P E 4 ( S H E E T 1 7 ) WA L L M O U N T E D S I G N RA I S E D C H A N N E L L E T T E R S AR E A ( 8 ’ X 3 ’ ) 2 4 S F - T Y P E 4 (S H E E T 1 7 ) FR E E S T A N D I N G M E T A L L E T T E R S AR E A ( 2 6 ’ X 2 . 5 ’ ) 6 5 S F - T Y P E 1 N O T IL L U M I N A T E D ( S H E E T 1 7 ) AW N I N G S I G N FR E E S T A N D I N G C H A N N E L L E T T E R S A N D L O G O S I G N AR E A ( 8 ’ X 2 ’ ) 1 6 S F - T Y P E 2 ( S H E E T 1 7 ) WA L L M O U N T E D S I G N RA I S E D C H A N N E L L E T T E R S A N D L O G O S I G N AR E A ( 4 ’ X 5 ’ ) 2 0 S F - T Y P E 5 ( S H E E T 1 7 ) HA N G I N G B L A D E S I G N BO A R D W I T H R A I S E D L E T T E R S AR E A ( 4 ’ X 1 ’ ) 4 S F - T Y P E 4 MO U N T E D O N B L A D E ( S H E E T 1 7 ) 24’-0” 8’-3” AW N I N G S I G N FR E E S T A N D I N G C H A N N E L L E T T E R S AR E A ( 8 ’ X 2 ’ ) 1 6 S F - T Y P E 2 ( S H E E T 1 7 ) AL L O W A B L E S I G N S T A T I S T I C S PR O P O S E D S I G N S T A T I S T I C S ZO N I N G : C- R SI G N T Y P E A L L O W E D : A L L T Y P E S TO T A L N U M B E R A L L O W E D : 4 / T E N A N T S P . MA X C U M U L A T I V E S I G N A R E A : 2 0 0 S F / T E N A N T SP E C I A L I L L U M I N A T I O N R E S T R I C T I O N S : NO N E TE N A N T 2 WA L L S I G N S : 2 = 4 8 S F AW N I N G S I G N S : 2 = 1 8 S F CU M U L A T I V E A R E A O F S I G N : 64 S F < 2 0 0 S F TE N A N T 1 WA L L S I G N S : 1 = 2 0 S F HA N G I N G S I G N S : 1 = 4 S F AW N I N G S I G N S : 2 = 2 8 S F CU M U L A T I V E A R E A O F S I G N : 52 S F < 2 0 0 S F SA N T A R O S A E L E V A T I O N MO N T E R E Y E L E V A T I O N HI G U E R A E L E V A T I O N 0 SC A L E 1 ” = 8 ’ 81 624 4 SC A L E 1 ” = 1 6 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) Attachment 4 ARC1 - 39 12’-0” 12’-0” 15 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 RE A R S I G N S AW N I N G S I G N FR E E S T A N D I N G C H A N N E L L E T T E R S AR E A ( 8 ’ X 1 . 5 ’ ) 1 2 S F - T Y P E 2 (S H E E T 1 7 ) AW N I N G S I G N FR E E S T A N D I N G C H A N N E L L E T T E R S AR E A ( 8 ’ X 1 . 5 ’ ) 1 2 S F - T Y P E 2 (S H E E T 1 7 ) RE A R E L E V A T I O N SO U T H E A S T E L E V A T I O N NO R T H W E S T E L E V A T I O N 0 SC A L E 1 ” = 8 ’ 81 624 4 SC A L E 1 ” = 1 6 ’ ( 1 2 ” X 1 8 ” ) (2 4 ” X 3 6 ” ) Attachment 4 ARC1 - 40 16 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 SI T E L I G H T I N G A N D P H O T O M E T R I C S 7. 5 9. 7 17 . 9 10 . 7 8. 2 10 . 4 12 . 9 13 . 0 12 . 0 6. 4 9. 1 10 . 0 10 . 4 11 . 0 4. 6 5. 9 6. 0 6. 6 7. 5 3. 4 3. 7 3. 6 4. 0 4. 2 4. 6 5. 0 4. 6 4. 9 2. 6 21 . 7 3. 8 2. 1 7. 4 2. 3 6. 3 5. 9 7. 8 2. 6 5. 2 5. 2 5. 7 3. 2 3. 1 2. 4 8. 1 3. 9 1. 6 0. 9 4. 6 3. 2 2. 2 6. 5 4. 7 2. 8 5. 2 5. 9 4. 8 3. 9 5. 6 6. 4 3. 5 3. 4 6. 5 6. 1 2. 8 5. 2 5. 8 4. 3 4. 1 5. 3 5. 8 2. 0 2. 1 4. 5 5. 5 0. 5 1. 3 1. 8 1. 9 2. 0 2. 0 1. 9 1. 8 1. 6 1. 1 1. 3 2. 2 1. 8 0. 7 1. 3 1. 6 1. 7 1. 6 0. 9 0. 6 0. 6 0. 7 1. 2 1. 9 1. 6 1. 0 2. 9 4. 4 4. 6 3. 4 1. 5 1. 1 1. 7 3. 9 4. 9 0. 9 3. 5 5. 5 5. 8 4. 4 1. 9 5. 1 4. 0 1. 7 1. 8 5. 4 5. 9 6. 1 5. 7 1. 8 1. 7 4. 7 5. 2 5. 3 4. 8 1. 8 1. 3 2. 5 2. 5 2. 6 1. 3 0. 9 0. 9 0. 9 1. 2 2. 0 2. 3 1. 2 1. 8 4. 4 5. 4 5. 4 4. 4 1. 8 1. 9 5. 9 6. 0 6. 0 5. 6 1. 8 1. 8 4. 5 5. 4 5. 5 4. 2 1. 7 1. 1 2. 1 0. 9 0. 5 0. 3 8. 5 S2 - 1 S2 - 2 S1 - 1 S1 - 2 S2 - 3 S2 - 4 S2 - 5 S2 - 6 S2 - 7 S2 - 8 S2 - 9 S2 - 1 0 Pl a n V i e w Sc a l e - 1 " = 1 0 ' SC A L E 1 ” = 2 0 ’ ( 1 2 ” X 1 8 ” ) S- 4 l S- 4 l S- 4 l S-4l S-4l S- 4 l S- 4 l S- 4 l S- 4 l S- 4 l S- 4 l S- 4 l S- 4 l S-4l S-4l S- 3 l S- 3 l S-4l S-4l S-4l S-4l S-3l S-3l Attachment 4 ARC1 - 41 17 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 SI T E L I G H T I N G A N D S I G N D E T A I L S LI G H T I N G T Y P E S LI G H T I N G S C H E D U L E S SI G N T Y P E S Lu m i n a i r e S c h e d u l e Sy m b o l L a b e l Q T Y C a t a l o g N u m b e r D e s c r i p t i o n La m p Nu m b e r La m p s Lu m e n s pe r L a m p LL F W a t t a g e S2 10 E H 1 6 L 6 3 L E D 3 5 0 m A 40 K R 4 M V O L T 1 D S AN W H EU R O T I Q U E H A N O V E R S E R I E S W I T H DE C O R A T I V E S K I R T , H L M M O D U L E T Y P E 4 LE N S , S I N G L E D R I V E R . T E M P 5 0 . 3 C ON E 7 1 . 6 - W A T T L E D , AI M E D D O W N P O S . 1 6 2 7 8 . 7 2 7 0 . 9 5 7 1 . 6 S1 2 C S X W L E D 3 0 C 7 0 0 4 0 K T4 M CO N T O U R S E R I E S L E D W A L L - M O U N T W I T H 30 4 0 0 0 K L E D S O P E R A T E D A T 7 0 0 m A A N D PR E C I S I O N M O L D E D A C R Y L I C T Y P E I V LE N S LE D 1 7 0 1 6 . 1 2 0 . 9 5 6 9 Lu m i n a i r e L o c a t i o n s No . L a b e l X Y Z Lo c a t i o n MH O r i e n t a t i o n T i l t X Y Ai m Z 1 S 1 5 8 2 2 . 3 5 5 6 5 4 . 3 5 1 0 . 0 0 1 0 . 0 0 8 8 .5 1 0 . 0 0 5 8 2 2 . 3 5 5 6 5 4 . 3 5 0 . 0 0 2 S 1 5 7 9 8 . 9 1 5 6 6 1 . 6 5 1 0 . 0 0 1 0 . 0 0 - 0 .2 0 0 . 0 0 5 7 9 8 . 9 1 5 6 6 1 . 6 5 0 . 0 0 1 S 2 5 9 6 4 . 6 9 5 7 0 8 . 1 6 1 6 . 0 0 1 6 . 0 0 1 8 0 .0 0 0 . 0 0 5 9 6 4 . 6 9 5 7 0 6 . 9 1 0 . 0 0 2 S 2 5 9 0 6 . 5 6 5 7 0 8 . 6 3 1 6 . 0 0 1 6 . 0 0 1 80 . 0 0 0 . 0 0 5 9 0 6 . 5 6 5 7 0 7 . 3 8 0 . 0 0 3 S 2 5 8 5 3 . 6 3 5 7 0 8 . 1 5 1 6 . 0 0 1 6 . 0 0 1 80 . 0 0 0 . 0 0 5 8 5 3 . 63 5 7 0 6 . 9 0 0 . 0 0 4 S 2 5 7 9 6 . 1 6 5 7 0 7 . 8 0 1 6 . 0 0 1 6 . 0 0 1 8 0 . 0 0 0 . 0 0 5 7 9 6 . 1 6 5 7 0 6 . 5 5 0 . 0 0 5 S 2 5 8 5 0 . 6 2 5 6 1 1 . 0 3 1 6 . 0 0 1 6 . 0 0 89 . 5 4 0 . 0 0 5 8 5 1 . 8 7 5 6 1 1 . 0 4 0 . 0 0 6 S 2 5 8 5 0 . 4 5 5 6 5 1 . 3 8 1 6 . 0 0 1 6 . 0 0 89 . 5 4 0 . 0 0 5 8 5 1 . 7 0 5 6 5 1 . 3 9 0 . 0 0 7 S 2 5 8 3 4 . 5 8 5 6 6 6 . 0 0 1 6 . 0 0 1 6 . 0 0 -0 . 4 6 0 . 0 0 5 8 3 4 . 5 7 5 6 6 7 . 2 5 0 . 0 0 8 S 2 5 9 0 9 . 8 5 5 6 1 9 . 6 9 1 6 . 0 0 1 6 . 0 0 - 9 0 . 0 0 0 . 0 0 5 9 0 8 . 6 0 5 6 1 9 . 6 9 0 . 0 0 9 S 2 5 9 1 6 . 3 5 5 6 5 0 . 3 6 1 6 . 0 0 1 6 . 0 0 0 . 00 0 . 0 0 5 9 1 6 . 3 5 5 6 5 1 . 6 1 0 . 0 0 10 S 2 5 9 7 3 . 8 8 5 6 5 0 . 2 8 1 6 . 0 0 1 6 . 0 0 0 . 00 0 . 0 0 5 9 7 3 . 8 8 5 6 5 1 . 5 3 0 . 0 0 St a t i s t i c s De s c r i p t i o n Sy m b o l A v g M a x M i n M a x / M i n A v g / M i n A v g / M a x PA R K I N G L O T 3. 3 f c 8 . 5 f c 0 . 3 f c 2 8 . 3 : 1 1 1 . 0 : 1 0 . 4 : 1 PL A Z A 8. 1 f c 2 1 . 7 f c 2 . 6 f c 8 . 3 : 1 3 . 1 : 1 0 . 4 : 1 TY P E S - 2 PA R K I N G L O T P O L E L I G H T MA K E : AN T I Q U E S T R E E T L A M P S MO D E L : HA N O V E R P E N D A N T EH L 1 6 L CO L O R : BL A C K TY P E S - 1 WA L L M O U N T E D L I G H T MA K E : LI T H O N I A MO D E L : CS X W L E D WA L L L U M I N A I R CO L O R : BL A C K TY P E S - 3 DE C O R A T I V E W A L L M O U N T E D L I G H T MA K E : TM S L I G H T I N G MO D E L : SI G N 1 F L O O D L I G H T CO L O R : BL A C K TY P E S - 4 WA L L M O U N T E D L I G H T MO D I F I E D T O B E D A R K S K Y C O M P L I A N T MA K E : EV E R G R E E N L I G H T I N G MO D E L : SE R I E S 8 0 L A N T E R N S E R I E S 15 ” H X 1 1 ” W X 6 ” D CO L O R : BL A C K TY P E S - 2 TY P E S - 1 T Y P E S - 3 T Y P E S - 4 BL A D E S I G N FO R S I T E L I G H T I N G P H O T O M E T R I C ( D E C O R A T I V E L I G H T I N G N O T R E Q U I R E D F O R P H O T O M E T R I C ) NO T E S : 1. F O R T Y P E S S 1 A N D S 2 R E F E R A L S O T O L U M I N A I R E S C H E D U L E F O R P H O T O M E T R I C I N F O R M A T I O N 2. R E F E R T O S I T E P L A N F O R L O C A T I O N S SI G N T Y P E 1 SI G N T Y P E 2 SI G N T Y P E 4 SI G N T Y P E 5 4’ - 0 ” 1’-0” Attachment 4 ARC1 - 42 18 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 CI V I L D E M O P L A N SC A L E 1 ” = 4 0 ’ ( 1 2 ” X 1 8 ” ) Attachment 4 ARC1 - 43 19 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 GR A D I N G / D R A I N A G E P L A N SC A L E 1 ” = 2 0 ’ ( 1 2 ” X 1 8 ” ) Attachment 4 ARC1 - 44 20 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 CI V I L D R A I N A G E D E T A I L S SC A L E 1 ” = 8 ’ ( 1 2 ” X 1 8 ” ) SC A L E 1 ” = 8 ’ ( 1 2 ” X 1 8 ” ) SC A L E 1 ” = 8 ’ ( 1 2 ” X 1 8 ” ) SC A L E 1 ” = 8 ’ ( 1 2 ” X 1 8 ” ) Attachment 4 ARC1 - 45 21 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 CI V I L U T I L I T Y P L A N SC A L E 1 ” = 2 0 ’ ( 1 2 ” X 1 8 ” ) Attachment 4 ARC1 - 46 22 SA N T A R O S A S T R E E T DE V E L O P M E N T DA T E : J U L Y 4 , 2 0 1 4 LA N D S C A P E P L A N Da v i d F o o t e , P r i n c i p a l 8 0 5 . 7 8 1 . 9 8 0 0 18 7 T a n k F a r m R o a d # 2 3 0 , S a n L u i s O b i s p o , C A 9 3 4 0 1 Ka r y l H D : U s e r s : K a r y l : D e s k t o p : s r l n d s c p c a l c . x l s 7/ 2 9 / 1 4 Ca l c u l a t e M a x A n n u a l A p p l i e d W a t e r A l l o w a n c e ( M A W A ) a n d E s t i m a t e d T o t a l W a t e r U s e ( E T W U ) : C i t y St a t e Z i p To d e t e r m i n e i f p l a n t i n g s a r e L o w , M o d e r a t e o r H i g h w a t e r r e q u i r e m e n t p l a n t s , s e e C A D e p t o f W a t e r Re s o u r c e s S p e c i e s E v a l u a t i o n L i s t : ht t p : / / w w w . s l o c i t y . o r g / u t i l i t i e s / d o w n l o a d / o u t d o o r c o n En t e r v a l u e s f o r y o u r p r o j e c t i n s q u a r e f e e t : MA W A G a l l o n s 4 8 , 5 3 2 . 9 6 To t a l L a n d s c a p e A r e a 2 2 6 6 M A W A U n i t s 6 4 . 8 8 Tu r f 0 Lo w ( D r o u g h t T o l e r a n t ) 2 2 6 6 E T W U G a l l o n s 1 7 , 3 3 3 . 2 0 Mo d e r a t e 0 E T W U U n i t s 2 3 . 1 7 Hi g h ( T h i r s t y ) 0 Sp o r t s F i e l d 0 Ve g e t a b l e s 0 [c h e c k t o t a l ] 2 2 6 6 Av e r a g e E t o f o r S a n L u i s O b i s p o C i t y ( 2 0 0 0 - 2 0 0 9 ) = 4 9 . 3 5 i n c h e s / y e a r Ma n d a t e d E T a d j u s t m e n t f a c t o r = 0 . 7 0 Co n v e r s i o n f a c t o r ( g a l l o n s t o s q u a r e f e e t ) = 0 . 6 2 LA = L a n d s c a p e A r e a SL A = S p e c i a l L a n d s c a p e A r e a ( s p o r t s f i e l d , v e g e t a b l e g a r d e n ) SL A a d j u s t m e n t f a c t o r = 0 . 3 0 PF = P l a n t F a c t o r f r o m W U C O L S I I I HA = H y d r o z o n e A r e a s q u a r e f e e t I E = I r r i g a t i o n E f f i c i e n c y ( 8 0 % ) Un i t s = B i l l i n g U n i t s o r 7 4 8 g a l l o n s MA W A = ( E t o ) ( 0 . 6 2 ) [ 0 . 7 * L A + 0 . 3 * S L A ] ET W U = ( E t o ) ( . 0 6 2 ) ( ( P F * H A ) / I E + S L A ) Sa n L u i s O b i s poC A Sa n t a R o s a S t r e e t C o m m e r c i a l Le n n y G r a n t 80 5 . 5 4 7 . 1 7 9 4 RR M D e s i gn 37 6 5 S o u t h H i gue r a S t r e e t , S u i t e 1 0 2 Co m p a n y St r e e t A d d r e s s Pr o jec t N a m e Na m e o f P r o jec t A p p l i c a n t Ti t l e Te l e p h o n e N o . Fa x N o . Em a i l A d d r e s s No r t h 0 16 ' 32 ' Sc a l e : 1 / 1 6 " = 1 ' - 0 " 4' 8 ' 16 ' 1 2 ' Pr e l i m i n a r y P l a n t M a t e r i a l s L i s t St r e e t T r e e s (1 5 g a l l o n m i n i m u m s i z e , C i t y o f S a n L u i s O b i s p o A p p r o v e d S t r e e t T r e e Li s t ) Gl e d i t s i a t r i a c a n t h o s H o n e y L o c u s t Ma g n o l i a ' M a j e s t i c B e a u t y ' S o u t h e r n M a g n o l i a Py r u s c a l l e r y a n a F l o w e r i n g P e a r Pa r k i n g L o t T r e e s - l o w w a t e r u s e (1 5 g a l l o n m i n i m u m s i z e ) Ar b u t u s ' M a r i n a ' St r a w b e r r y T r e e Ge i j e r a p a r v i f l o r a A u s t r i a l i a n W i l l o w Ev e r g r e e n S h r u b s - l o w w a t e r u s e (5 g a l l o n m i n i m u m s i z e ) Be r b e r i s ' C h e r r y B o m b ' C h e r r y B o m b B a r b e r r y Ch o n d r o p e t u l u m t e c t o r u m C a p e R u s h Pi t t o s p o r u m c r a s s i f o l i u m ' N a n a " P i t t o s p o r u m Gr o u n d C o v e r s – l o w w a t e r u s e (1 g a l l o n m i n i m u m s i z e ) Co t o n e a s t e r d a m m e r i Co t o n e a s t e r A p t e n i a c o r d i f o l i a Re d A p p l e Na s e l l a t e n u i s s i m a Ne e d l e G r a s s Se n e c i o m a n d r a l i s c a e NC N Vi n e s (5 g a l l o n m i n i m u m s i z e , a t t a c h t o w a l l ) Cl y t o s t o m a c a l l i s t e g i o i d e s Vi o l e t T r u m p e t Di s t i c t i s b u c i n n a t o r i a Bl o o d - r e d T r u m p e t V i n e Mu l c h Mu l c h a l l g r o u n d c o v e r a n d p l a n t e r a r e a s w i t h 2” m i n i m u m l a y e r ‘ w a l k - o n ’ b a r k . A r e a s a d j a c e n t to b u i l d i n g e n t r i e s m a y r e c e i v e d e c o r a t i v e g r a v e l m u l c h f o r a c c e n t . . Ev e r g r e e n P a r k i n g L o t T r e e s e. g . A r b u t u s ' M a r i n a ', Ge i j e r a p a r v i f l o r a De c i d u o u s S t r e e t T r e e s To c o n f o r m w i t h t h e C i t y o f S a n L u i s O b i s p o S t a n d a r d s ( e. g . G l e d i t s i a t r i a c a n t h o s ) HIGUERA STREET Sh r u b s a n d G r o u n d c o v e r s La r g e m a s s i n g s o f g r a s s e s a n d g r o u n d c o v e r s wi t h a c c e n t s h r u b s a n d p e r e n n i a l s . Fl o w e r i n g S t r e e t T r e e s e.g . M a g n o l i a ' M a j e s t i c B e a u t y ' Sc r e e n w i t h V i n e s e. g . Di s t i c t i s b u c i n n a t o r i a SA N T A R O S A S T R E E T MONTEREY STREET Pl a n t i n g D e s i g n N o t e s La n d s c a p e d e s i g n s h a l l c o m p l y w i t h t h e C i t y o f S a n L u i s O b i s p o Un i f o r m D e s i g n C r i t e r i a . Al l P l a n t m a t e r i a l s e l e c t e d s h a l l h a v e l o w w a t e r r e q u i r e m e n t s pe r W U C O L S . T h e m a x i m u m a p p l i e d w a t e r a l l o w a n c e ( M A W A ) a n d es t i m a t e d w a t e r u s e ( E T W U ) h a v e b e e n c a l c u l a t e d . Th e E T W U i s 3 7 % l e s s t h a n t h e M A W A , s e e w a t e r c a l c u l a t i o n s . Al l p l a n t i n g b e d s s h a l l h a v e a m i n i m u m 2 " l a y e r o f o r g a n i c m u l c h t h r o u g h o u t to i m p o r v e w a t e r r e t e n t i o n i n s o i l . Ir r i g a t i o n D e s i g n N o t e s Ir r i g a t i o n d e s i g n s h a l l c o m p l y w i t h t h e C i t y o f S a n L u i s O b i s p o Un i f o r m D e s i g n C r i t e r i a . Wa t e r s o u r c e s h a l l b e C i t y o d S a n L u i s M u n i c i p a l w a t e r . Th e s y s t e m s h a l l c o n s i s t o f i n - l i n e d r i p e m i t t e r s E a c h c i r c u i t sh a l l b e a h y d r o z o n e b a s e d o n u n i f o r m e x p o s u r e a n d p l a n t w a t e r re q u i r e m e n t s . Wa t e r i n g t i m e s s h a l l b e g o v e r n e d b y a n a u t o m a t i c c o n t r o l l e r a n d a w e a t h e r m o n i t o r i n g d e v i c e t h a t w i l l r e d u c e w a t e r i n g b a s e d o n we a t h e r e v e n t s a n d t e m p e r a t u r e s . Ev e r g r e e n S t r e e t T r e e s To c o n f o r m w i t h t h e C i t y o f S a n L u i s O b i s p o St a n d a r d s ( e. g . Fl o w e r i n g P e a r ) DR I P I R R I G A T I O N , TY P I C A L DR I P I R R I G A T I O N , TY P I C A L En t r y A r c h w i t h V i n e s e. g . Di s t i c t i s b u c i n n a t o r i a Sc r u b s t o S c r e e n B a c k f l o w D e v i c e SC A L E 1 / 3 2 ” = 1 ’ - 0 ” ( 1 2 ” X 1 8 ” ) Attachment 4 ARC1 - 47