Loading...
HomeMy WebLinkAboutA1-04LJ CITY OF SAN LUIS OBISPO CALIFORNIA LJ AGREEMENT ,,,_I THIS AGREEMENT, made on this . 1 "`day of 20(± J by and between the City of San Luis Obispo, a municipal corporation and charter city, San LA bispo nty, California (hereinafter called the Owner) and Maino Contraction Company, Inc., (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of CURB -RAMP INSTALLATIONS, SPEC NO. 90389 in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item No. Item Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) I . Construct Ramps & Sidewalk — 150 mm thick (Loc. 1,2,3,4,9,10) M2 105 125.00 $13,125.00 2. Construct Ramp & Sidewalk — 100 mm thick M2 320 110.00 $35,200.00 3. Construct Curb & Gutter M 190 185.00 $35,150.00 4. Construct Spandrel M2 155 150.00 $23,250.00 5. Storm Drain Facilities LS 1 13,000.00 $13,000.00 6. Extra AC M2 60 110.00 $6,600.00 7. Pavement Markings M2 25 50.00 $1,250.00 8. Signs Remove & Replace EA 3 250.00 $750.00 9. Lines & Grades LS 1 4000.00 $4,000.00 BID TOTAL: $ 132,325.00 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said pl -04 0 0 dispute shall be decided by the Owner and its decision shall be final, and conclusive. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and information for bidders. 2. Standard Specifications, Engineering Standards and Special Provisions. 2. Accepted Proposal. 4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire. 5. Noncollusion Declaration. 6. Plans. 7. List of Subcontractors. 8. Agreement and Bonds. 9. Insurance Requirements and Forms. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. APPROVED AS TO FORM: onathan Lowell City Attorney 3 CITY OF SAN LUIS OBISPO, A Municipal Corporation I inn, Kenn H mp n, City Administrative Officer CONTRACTOR Maine Construction Company, Inc. Thomas M. Maino, President