Loading...
HomeMy WebLinkAboutA16-05 Water Improv Proj.CITY OF SAN LUIS OBISP O CALIFORNIA AGREEMEN T THIS AGREEMENT,made on thi J day of n l440 .,20 by and between the City of San Luis Obispo , a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) an d D-Kal Engineering, Inc . (hereinafter called the Contractor). WITNESSETH : That the Owner and the Contractor for the consideration stated herein agree as follows : ARTICLE 1, SCOPE OF WORK :The Contractor shall perform everything required to be performed, shal l provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d transportation services required to complete all the work of construction o f WATER IMPROVEMENT PROJECT, SPEC NO . 90237 in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n strict compliance with the Contract Documents hereinafter enumerated . It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives . ARTICLE II,CONTRACT PRICE :The Owner shall pay the Contractor as full consideration for the faithfu l performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contrac t prices as follows: Item No. Item Unit of Measure Estimated Quantity Item Pric e (in figures) Tota l (in figures ) 1 200 mm Class 200 Water Main M 753 218 .00 $164,154 .0 0 2 Abandon Water Facilities LS 1 9600 .00 $9,600 .0 0 3 Fire Hydrant Assembly & Reflectors EA 4 3387 .00 $13,548 .00 4 Tie-in (E) Water Service Type 1 EA 15 500 .00 $7,500 .00 5 Tie-in (E) Water Service Type 2 EA 22 700 .00 $15,400 .00 6 Tie-in (E) Water Service Type 3 EA 4 816.00 $3,264 .00 7 Tie-in (E) Water Service Type 4 EA 1 2000.00 $2,000 .00 8 Tie-in 8" Waterline @ Wilson St .& Grove St. LS 1 2895 .00 $2,895 .0 0 9 Tie-in 8" Waterline @ Wilson St .& Park St . LS 1 2636 .00 $2,636.0 0 10 Tie-in 10" Waterline @ Wilson St .& Grand Ave . LS 1 2205 .00 $2,205 .0 0 11 Tie-in 8" Waterline @ Wilson St .& Grand Ave . LS 1 5850 .00 $5,850 .00 12 Tie-in 4" Waterline @ Higuera St . & Grove St . LS 1 2563 .00 $2,563 .00 -1 - ~/6 -o Y 4 13 Tie-in 8" Waterline @ Higuera St . & Grove St . LS 1 2310.00 $2,310.00 14 Tie-in 10" Waterline @ Higuera St . & California Blvd . LS 1 5440 .00 $5,440 .00 15 Additional concrete replacement on Higuera M2 43 131 .00 $5,633 .00 16 Tie-in 4" Fire Service @ 153 1 Higuera St . EA 1 2175 .00 $2,175 .0 0 17 Tie-in 8" Waterline @ Calilforni a Blvd . and Marsh St . LS 1 3267 .00 $3,267 .0 0 18 Tie-in 6" Fire Service @ 111 0 California Blvd . EA 1 2295 .00 $2,295 .00 19 Tie-in 8" Waterline @ Flora St .& Laurel Lane LS 1 3140 .00 $3,140.00 20 Tie-in (2) 3" Waterline @ Flora St . and Laurel Lane LS 1 1770.00 $1,770.00 21 Air Vac release valve assembly EA 3 2987 .00 $8,961 .00 22 Boring site trench repairs on Akita St. & Flora St . EA 3 350.00 $1,050.00 23 Locate and Restore Monuments LS 1 3080.00 $3,080 .00 BID TOTAL : $270,736 .00 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document s made a part of this Contract . Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor ma y be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, sai d dispute shall be decided by the Owner and its decision shall be final, and conclusive . ARTICLE IH, COMPONENT PARTS OF THIS CONTRACT :The Contract consists of the following documents , all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached : 1.Notice to Bidders and information for bidders . 2.Standard Specifications, Engineering Standards and Special Provisions . 2 . Accepted Proposal . 4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire . 5.Noncollusion Declaration . 6.Plans . 7.List of Subcontractors . 8.Agreement and Bonds . 9.Insurance Requirements and Forms . ARTICLE IV . It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith . IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first abov e written. CITY OF SAN LUIS OBISPO , A Municipal Corporatio n K AM_ Hampi n, City Administrative Officer APPROVED AS TO FORM : CONTRACTOR an P. Lowell D-Kal Engineering, c . City Attorney David Loughran, esident