HomeMy WebLinkAboutA16-05 Water Improv Proj.CITY OF SAN LUIS OBISP O
CALIFORNIA
AGREEMEN T
THIS AGREEMENT,made on thi J day of n l440 .,20 by and between the City of San Luis Obispo ,
a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) an d
D-Kal Engineering, Inc . (hereinafter called the Contractor).
WITNESSETH :
That the Owner and the Contractor for the consideration stated herein agree as follows :
ARTICLE 1, SCOPE OF WORK :The Contractor shall perform everything required to be performed, shal l
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d
transportation services required to complete all the work of construction o f
WATER IMPROVEMENT PROJECT, SPEC NO . 90237
in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n
strict compliance with the Contract Documents hereinafter enumerated .
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d
completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives .
ARTICLE II,CONTRACT PRICE :The Owner shall pay the Contractor as full consideration for the faithfu l
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contrac t
prices as follows:
Item
No.
Item Unit of
Measure
Estimated
Quantity
Item Pric e
(in figures)
Tota l
(in figures )
1 200 mm Class 200 Water Main M 753 218 .00 $164,154 .0 0
2 Abandon Water Facilities LS 1 9600 .00 $9,600 .0 0
3 Fire Hydrant Assembly & Reflectors EA 4 3387 .00 $13,548 .00
4 Tie-in (E) Water Service Type 1 EA 15 500 .00 $7,500 .00
5 Tie-in (E) Water Service Type 2 EA 22 700 .00 $15,400 .00
6 Tie-in (E) Water Service Type 3 EA 4 816.00 $3,264 .00
7 Tie-in (E) Water Service Type 4 EA 1 2000.00 $2,000 .00
8 Tie-in 8" Waterline @ Wilson St .&
Grove St.
LS 1
2895 .00 $2,895 .0 0
9 Tie-in 8" Waterline @ Wilson St .&
Park St .
LS 1
2636 .00 $2,636.0 0
10 Tie-in 10" Waterline @ Wilson St .&
Grand Ave .
LS 1
2205 .00 $2,205 .0 0
11 Tie-in 8" Waterline @ Wilson St .&
Grand Ave .
LS 1
5850 .00 $5,850 .00
12 Tie-in 4" Waterline @ Higuera St .
& Grove St .
LS 1
2563 .00 $2,563 .00
-1 -
~/6 -o Y
4
13 Tie-in 8" Waterline @ Higuera St .
& Grove St .
LS 1
2310.00 $2,310.00
14 Tie-in 10" Waterline @ Higuera St .
& California Blvd .
LS 1
5440 .00 $5,440 .00
15 Additional concrete replacement on
Higuera
M2 43
131 .00 $5,633 .00
16 Tie-in 4" Fire Service @ 153 1
Higuera St .
EA 1
2175 .00 $2,175 .0 0
17 Tie-in 8" Waterline @ Calilforni a
Blvd . and Marsh St .
LS 1
3267 .00 $3,267 .0 0
18 Tie-in 6" Fire Service @ 111 0
California Blvd .
EA 1
2295 .00 $2,295 .00
19 Tie-in 8" Waterline @ Flora St .&
Laurel Lane
LS 1
3140 .00 $3,140.00
20 Tie-in (2) 3" Waterline @ Flora St .
and Laurel Lane
LS 1
1770.00 $1,770.00
21 Air Vac release valve assembly EA 3 2987 .00 $8,961 .00
22 Boring site trench repairs on Akita
St. & Flora St .
EA 3
350.00 $1,050.00
23 Locate and Restore Monuments LS 1 3080.00 $3,080 .00
BID TOTAL : $270,736 .00
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document s
made a part of this Contract .
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor ma y
be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, sai d
dispute shall be decided by the Owner and its decision shall be final, and conclusive .
ARTICLE IH, COMPONENT PARTS OF THIS CONTRACT :The Contract consists of the following documents ,
all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached :
1.Notice to Bidders and information for bidders .
2.Standard Specifications, Engineering Standards and Special Provisions .
2 . Accepted Proposal .
4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire .
5.Noncollusion Declaration .
6.Plans .
7.List of Subcontractors .
8.Agreement and Bonds .
9.Insurance Requirements and Forms .
ARTICLE IV . It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n
the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g
herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith .
IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first abov e
written.
CITY OF SAN LUIS OBISPO ,
A Municipal Corporatio n
K
AM_
Hampi n, City Administrative Officer
APPROVED AS TO FORM :
CONTRACTOR
an P. Lowell
D-Kal Engineering, c .
City Attorney
David Loughran, esident