THIS AGREEMENT, made on this (v.day of~20 4), yy and between the City of San Luis Obispo,
a municipal corporation and charter city, San Luis Obisp County, California (hereinafter called the Owner) an d
R. Burke Corporation (hereinafter called the Contractor).
WITNESSETH :
That the Owner and the Contractor for the consideration stated herein agree as follows :
ARTICLE 1, SCOPE OF WORK :The Contractor shall perform everything required to be performed, shal l
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d
transportation services required to complete all the work of construction o f
EMERGENCY STORM DRAIN REPAIR — 1642 EL CERRITO COUR T
SPEC NO. 90522
in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n
strict compliance with the Contract Documents hereinafter enumerated .
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d
completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives .
ARTICLE II, CONTRACT PRICE : The Owner shall pay the Contractor as full consideration for the faithfu l
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contrac t
prices as follows :
Ite m
No.
Item Unit o f
Measure
Estimated
Quantity
Item Pric e
(in figures)
Total
(in figures)
1 .Install MH & stubouts LS 1 14,900 .00 $14,900.00
2 .Concrete line existing CMP
stormdrain pipe
M 22 65 .00 $1,430 .00
3 .Construct new sewer lateral M 15 150 .00 $2,250.00
6 .Comply with OSHA LS 1 550 .00 $550.00
BID TOTAL : $19,130 .0 0
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document s
made a part of this Contract .
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor ma y
be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, sai d
dispute shall be decided by the Owner and its decision shall be fmal, and conclusive .
i
ARTICLE III,COMPONENT PARTS OF THIS CONTRACT :The Contract consists of the following documents ,
all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached :
1.Notice to Bidders and information for bidders .
2.Standard Specifications, Engineering Standards and Special Provisions .
2. Accepted Proposal .
4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire .
5.Noncollusion Declaration .
6.Plans .
7.List of Subcontractors .
8.Agreement and Bonds.
9.Insurance Requirements and Forms .
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n
the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g
herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith .
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first abov e
written.
CITY OF SAN LUIS OBISPO ,
A Municipal Corporation
CONTRACTO R
CA,.r.~/.~.uo le_
R . thfrke Corporation
Judith M . Tuell, Corporate Secretary /
Treasure r
APPROVED AS TO FORM :
City Attorney