CITY OF SAN LUIS OBISPO
CALIFORNIA
AGREEMENT
THIS AGREEMENT, made on this day of , 2012, by and between the City of San Luis Obispo,
a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and
D -KAL Engineering Inc. (hereinafter called the Contractor).
WITNESSETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and
transportation services required to complete all the work of construction of
PISMO SEWERLINE REPLACEMENT PROJECT, SPECIFICATION No. 90916A
in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in
strict compliance with the Contract Documents hereinafter enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and
completed under the direction and supervision and subject to the approval of the Owner or its authorized
representatives.
ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the
contract prices as follows:
Item
Item
Unit of
Estimated
Item Price
Total
No.
Measure
Quantity
(in figures)
(in figures)
1.
Traffic Control
LS
1
----------- - - - - --
$2,105.00
2.
Video Inspection
LS
1
----------------
$1,008.00
3.
Install (N) 8" HDPE
LF
10
$359.00
$3,590.00
4.
Install (N) 12" HDPE
LF
34
$185.00
$6,290.00
5'
Remove (E) and Install (N) Manhole
EA -
- 1
________________
$ 7,536.00
per Eng. Std. 6610
6
Install (N) Manhole per Eng. Std.
EA
1
----------------
$6,070.00
6610
7.
Remove (E) Manhole
EA
1
_________________
$2,355.00
8.
Connect (12 ") Sewerline to (E)
EA
1
Manhole
----- ------- - - ---
$ 550.00
9'
Connect (12 ") Sewerline to (N)
EA
1
Manhole
$350.00
10.
Connect (8 ") Sewerline to (N)
EA
2
$150.00
$300.00
Manhole
11.
Connect (E) Sewer Lateral to (12 ")
Sewerline
EA
8
$1,572.00
$12,576.00
Item
No.
Item
Unit of
Measure
Estimated
Quantity
Item Price
(in figures)
Total
(in figures)
12.
Regrade (E) Sewer Laterals
LF
30
$127.00
$3,810.00
13.
Repair Vertical Grade Defect
LF
10
$280.00
$2,800.00
14.
Repair Existing Damaged Pavement
SF
640
$16.42
$10,508.80
15.
Repair Existing Trench
LF
800
$27.20
$21,760.00
16.
Repair Existing Damaged Traffic
Stripes, Pavement Markings,
Pavement Markers
LS
1
----------- - - - - --
$1,108.00
17
Adjust to Grade, Grout, Vacuum
Test, and Pour Collars (E) Manhole
EA
3
$925.00
$2,775.00
18.
Abandon 6" Sewer Line
LS
1
----------- - - - - --
$100.00
19.
Mandrel Test 12" Sewer Line
LS
1
----------- - - - - --
$1,220.00
20.
Relocate Material to Corp Yard
LS
1
----------------
$1,475.00
21.
Comply with OSHA
LS
1
----------- - - - - --
$975.00
22.
Comply with APCD
LS
1
--------- - - - - --
$750.00
23.
PPE to comply with HSP
LS
1
---- ------------
$250.00
BID TOTAL: $90,261.80
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents
made a part of this Contract.
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may
be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said
dispute shall be decided by the Owner and its decision shall be final, and conclusive.
ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following
documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached:
1. Notice to Bidders and information for bidders.
2. Standard Specifications, Engineering Standards, Special Provisions and any Addenda.
2. Accepted Proposal.
4_ Public Contract code Section 10285.1 Statement and 10162 Questionnaire.
5. Noncollusion Declaration.
6. Plans.
7. List of Subcontractors.
8. Agreement and Bonds.
9. Insurance Requirements and Forms.
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict
between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and
nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith.
Flo
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above
written.
J. 9111stine Dietrick
ity Attorney
-3-
CITY OF SAN LUIS OBISPO,
um ' al C ration
o ,�L
Ka n ichtig, City Manager
CON RACTOR
Qnµd� .1 vim'
D -KAL Engineering In f.
David Loughran, President