Loading...
HomeMy WebLinkAbout03-17-2015 C6 Sinsheimer Stadium Stairs ReplacementCity of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl R. Grigsby, Director of Public Works Prepared By: Michael J. McGuire, Engineer III SUBJECT: SINSHEIMER STADIUM STAIRS REPLACEMENT, SPECIFICATION No. 91255 RECOMMENDATIONS 1. Award a contract to Newton Construction & Management Inc. in the amount of $127,800 for the “Sinsheimer Stadium Stairs Replacement, Specification No. 91255”. 2. Approve a transfer of $21,000 from the Santa Rosa Skate Park construction management account to the project construction account. DISCUSSION On December 16, 2014, the City Council authorized inviting bids for the Sinsheimer Stadium Stairs Replacement, Specification Number 91255, a Measure Y funded project (Attachment 1). Five bids were opened on February 26, 2015 and Pacific Builders was the lowest bidder with a proposal of $123,742. This amount is higher than the Engineer’s Estimate of $110,000. On February 27, 2015, the City received a bid protest (Attachment 2) from Newton Construction & Management, the second lowest bidder, contesting the responsiveness of Pacific Builder’s bid. Upon review, staff determined that Pacific Builders’ bid was non-responsive due to failure to provide documentation that Pacific Builders and their subcontractors were registered with the Department of Industrial Relations. City specifications are clear that such documentation is a requirement for this project. The second lowest bidder was Newton Construction & Management Inc. of San Luis Obispo with a proposal of $127,800. Their bid package contained the required documentation of registration with the Department of Industrial Relations and was otherwise a fully responsive bid. See attached Bid Summary, Attachment 2. CONCURRENCES The project has the concurrence of the Parks & Recreation Department. FISCAL IMPACT The 2013-15 Financial Plan, Appendix B, pages 3-390 to 3-392, identifies $20,000 for design, $105,000 for construction, along with $15,000 for construction management. The construction management and the remaining design funds will be transferred into the construction phase at the time of bid award for the project, for a total construction budget of $126,951. A transfer of $21,000 from the construction management account of the Santa Rosa Skate Park project into the project construction account will fully fund the construction contract and adjust March 17 2015 C6 C6-1 Sinsheimer Stadium Stairs Replacement (91255) Page 2 the construction contingency amount to maintain 10% of the construction cost. Currently the Santa Rosa Skate Park, also a Measure Y project, has $73,030 additional funding in the construction management account, as construction management was performed by City staff. A transfer of $21,000 will leave $52,030 in the construction management account if needed for final completion of the Skate Park. This project is fully funded by Measure Y, the local half-percent sales tax. Financial Plan Reference:2014-15 Construction:127,800$ Budget Amount:126,951$ Construction Contingencies:14,000$ Bid Estimate:110,000$ Total for Construction:141,800$ Bid Amount (lowest bidder):127,800$ Printing:268$ Testing/Inspection:5,000$ Total for other costs:5,268$ Total Cost of Project:147,068$ Funding Needed:20,117$ ALTERNATIVES Deny approval to award. The City Manager could choose to deny or defer the approval for award of this project. Staff does not recommend this option. Should this be denied or deferred, replacement of the stairs would be delayed. The existing steel staircase would continue to deteriorate with the possibility of the stairs being closed for use by the baseball organizations using the stadium. Since the stadium is a facility that the City charges a fee for use, the facility should be maintained in a reasonable state of usability. ATTACHMENTS 1. Copy of original report authorizing advertising 2. Bid Summary 3. Contract T:\Council Agenda Reports\2015\2015-03-17\SinsheimerStadiumStairs (GrigsbyMcGuire)\eCAR Sinsheimer Stairs Award.docx C6-2 City of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl R. Grigsby, Director of Public Works Prepared By: Michael J. McGuire, Engineer III SUBJECT: SINSHEIMER STADIUM STAIRS REPLACEMENT, SPECIFICATION NO. 91255 RECOMMENDATIONS 1.Approve plans and specifications for “Sinsheimer Stadium Stairs Replacement, Specification No. 91255”. 2.Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bidder is within the Engineer’s Estimate of $109,000. 3.Approve the transfer of $7,732 from the project’s design account and $15,000 from the construction management account to the construction account at the time of bid award. DISCUSSION The easterly stairs leading to the field at Sinsheimer Baseball Stadium was built in the mid- 1970’s. These stairs have primarily served as access to the field area for the players and occasionally for the public during special events. Unlike the concrete stairs on the north side of the stadium, this stairway is of steel fabrication with concrete treads. Over forty years of use have left the stairs in a poor condition. Most of the concrete treads are missing portions of concrete or have been patched. The steel nosings on the treads have worn smooth from use and create a slippery condition on the stairs. The ground at the top landing to the stairs has sunk, resulting in a wide gap and vertical displacement between the landing and the stairs. This gap has been patched over but requires constant maintenance. This project will replace the existing steel staircase with a cast-in-place concrete stairs that is fully compliant with the Americans with Disabilities Act (ADA). The treads and nosings will be entirely covered with a metal plate embedded with slip-resistant material to handle the cleats of the baseball player’s shoes. The railing will be replaced with new steel railing compliant with current building codes. Also, the design will provide for level and connected landings at the top and bottom of the staircase. CONCURRENCES This project has the concurrence of the Community Development Department with building permits pending approval. Construction of an ADA ramp was not required due to this project being an ADA upgrade to existing facilities. 12/16/2014 C5 ATTACHMENT 1 C6-3 Sinsheimer Stadium Stairs Replacement (91255) Page 2 FISCAL IMPACT The 2013-15 Financial Plan, Appendix B, pages 3-390 to 3-392, identifies $20,000 for design, $105,000 for construction, along with $15,000 for construction management. The current construction schedule allows for staff inspection and negates the need for consultant services for construction management. A transfer of the $15,000 from construction management and the current amount of $7,732 from design into the construction account phase will provide funds to fully support construction. This will provide a total construction budget of $127,732. ALTERNATIVE Deny approval to advertise. The Council could choose to deny or defer the approval for advertising of this project. Staff does not recommend this option. Should this be denied or deferred, replacement of the stairs will be delayed. The existing steel staircase will continue to deteriorate with the possibility of the stairs being closed for use. Since the stadium is a facility that the City charges a fee for use, the facility should be maintained in a reasonable state of usability. ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Special Provisions t:\council agenda reports\2014\2014-12-16\sinsheimer stadium stairs replacement (grigsby-mcguire).docx Fiscal Impact Summary 2014-15 Available Project Budget:127,732$ Engineer's Estimate Construction:109,000$ Construction Contingencies:11,000$ Total for Construction:120,000$ Testing/Inspection:5,500$ Printing & Advertising:500$ Total Cost of Project:126,000$ ATTACHMENT 1 C6-4 It e m  # I t e m  De s c r i p t i o n Qu a n t i t y U n i t  of  Me a s u r e U n i t  Pr i c e I t e m  To t a l U n i t  Pr i c e I t e m  To t a l U n i t  Pr i c e I t e m  To t a l U n i t  Pr i c e I t e m  To t a l U n i t  Pr i c e I t e m  To t a l U n i t  Pr i c e I t e m  To t a l 1 S I T E  WO R K 1 L S $40 , 0 0 0 . 0 0   $40 , 0 0 0 . 0 0   $66 , 8 0 1 . 0 0   $66 , 8 0 1 . 0 0   $20 , 0 0 0 . 0 0   $20 , 0 0 0 . 0 0   $82 , 4 0 7 . 0 0   $82 , 4 0 7 . 0 0   $84 , 9 1 8 . 2 0   $84 , 9 1 8 . 2 0   $73 , 8 0 0 . 0 0   $73 , 8 0 0 . 0 0   2 C O N C R E T E 1 L S $56 , 0 0 0 . 0 0   $56 , 0 0 0 . 0 0   $36 , 5 7 1 . 0 0   $36 , 5 7 1 . 0 0   $91 , 0 0 0 . 0 0   $91 , 0 0 0 . 0 0   $59 , 9 7 6 . 0 0   $59 , 9 7 6 . 0 0   $98 , 6 9 8 . 9 0   $98 , 6 9 8 . 9 0   $11 4 , 4 0 0 . 0 0   $11 4 , 4 0 0 . 0 0   3 M E T A L  RA I L I N G  IN S T A L L A T I O N 7 0 L F $20 0 . 0 0   $14 , 0 0 0 . 0 0   $29 1 . 0 0   $20 , 3 7 0 . 0 0   $24 0 . 0 0   $16 , 8 0 0 . 0 0   $24 5 . 5 0   $17 , 1 8 5 . 0 0   $24 3 . 3 7   $17 , 0 3 5 . 9 0   $39 2 . 0 0   $27 , 4 4 0 . 0 0   $1 1 0 , 0 0 0 . 0 0   $1 2 3 , 7 4 2 . 0 0   $1 2 7 , 8 0 0 . 0 0   $1 5 9 , 5 6 8 . 0 0   $2 0 0 , 6 5 3 . 0 0   $2 1 5 , 6 4 0 . 0 0   To t a l  Bi d  Am o u n t Si n s h e i m e r  St a d i u m  St a i r s  Re p l a c e m e n t ,  Sp e c i f i c a t i o n  No .  91 2 5 5 Bi d  Op e n i n g :  02 / 2 6 / 1 5 * m a r k s  an  al l o w a n c e En g i n e e r ' s  Es t i m a t e P a c i f i c  Bu i l d e r s N e w t o n  Co n s t r u c t i o n  &  J& P  Co n s t r u c t i o n R e d  Mo u n t a i n  Se r v i c e s R .  Bu r k e  Co r p o r a t i o n AT T A C H M E N T 2 THIS PAGE IS INTENTIONALLY LEFT BLANK AGREEMENT THIS AGREEMENT, made on this ______ day of ___________, 2015, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and NEWTON CONSTRUCTION & MANAGEMENT INC., (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of SINSHEIMER STADIUM STAIRS REPLACEMENT, SPECIFICATION NO. 91255 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 99 Site Work LS 1 $20,000.00 $20,000.00 2 99 Concrete LS 1 $91,000.00 $91,000.00 3 99 Metal Railing Installation LF 70 $240.00 $16,800.00 BID TOTAL: $127,800.00 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1.Notice to Bidders and information for bidders. 2.Standard Specifications, Engineering Standards, Special Provisions, and any Addenda. 2.Accepted Bid. 4.Public Contract code Section 10285.1 Statement and 10162 Questionnaire. 5.Noncollusion Declaration. 6.Plans. 7.List of Subcontractors. 8.Agreement and Bonds. ATTACHMENT 3 C6-6 9.Insurance Requirements and Forms. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. ATTEST: CITY OF SAN LUIS OBISPO A Municipal Corporation ______________________________ By:_____________________________ Anthony Mejia, City Clerk Jan Howell Marx, City Mayor APPROVED AS TO FORM: CONTRACTOR: Newton Construction & Management Inc. _______________________________ By:______________________________ J. Christine Dietrick, City Attorney Eric Newton Its: President Rev. 12-28-09 ATTACHMENT 3 C6-7