HomeMy WebLinkAbout01/22/2002, C4 - 2001-03 CAPITAL IMPROVEMENT PROJECTS APPROPRIATE FOR PUBLIC ART council Da7-z2-02 j Agenda RepoRt CITY O.F SAN LUIS OBISPO FROM: Wendy George, ACAO Prepared By: Betsy Delarnette, Assistant to the CAO 00) SUBJECT: 2001-03 CAPITAL IMPROVEMENT PROJECTS APPROPRIATE FOR PUBLIC ART CAO RECOMMENDATION Approve the staff recommendation that public art funding in the amounts indicated be included in the following Capital Improvement Plan projects scheduled for the 2001-03 fiscal years: City Hall Downtown Transit Center($19,000), Railroad Museum Round-About ($19,000),Recreation Center Remodel ($18,500), Santa Rosa Park Renovations ($18,500), Metal Fish Sculpture ($1,100). DISCUSSION The City's adopted Art in Public Places Program requires that 1% of the cost of all eligible City Capital Improvement Projects (CIP) be committed to public art. Once the Financial Plan is approved by Council, those funds are placed in a separate account. Because many construction projects, such as street paving, are not appropriate for public art, the CIP committee then meets to develop a recommendation for the Council as to how those funds should be allocated. The CIP committee met on November 8, 2001 and, using the following criteria, identified five projects suitable for public art: 1. Project should have high public visibility and use. 2. Project should lend itself to the inclusion of public art. 3. Project should be public art ready, meaning the project should be near or under construction and will be completed within the two year CIP. 4. The number of projects should be limited to a few in order to focus staff efforts and result in meaningful pieces of public art. The following recommendations are being presented for Council consideration: 1. City Hall Downtown Transit Center (DTC) - $19,000 to be used for artwork located in the vicinity of the DTC. 2. Railroad Museum Round-About - $19,000 to be used for artwork in the round- about located in the parking lot adjacent to the.Railroad Museum. 3. Recreation Center Remodel - $18;500 to be used for artwork at the Recreation Center. With the extent of remodeling being performed on the facility, there should be ample opportunity to include public art in the interior of the building. Council Agenda Report-2001-03 CIP Public Art Projects Page 2 4. Santa Rosa Park Renovations- $18,500 to be used for artwork in the vicinity of Santa Rosa Park 5. Metal Fish Sculpture - $1,100 to be used to repair and install the original John Augsberger metal fish sculpture that was damaged and lost in the winter storm of March 10, 1995 and recovered last spring. (Site of installation to be determined.) FISCAL IMPACT The following funding is currently available for public art projects as part of the City's CIP budget: 2001-02 II-1-63 Total GeneralFund $42,100 $347000 $76,100 The proposed funding allocation is as follows: 1. City Hall Downtown Transit Center $19,000 2. Railroad Museum Round-About $19,000 3. Recreation Center Remodel $18,500 4. Santa Rosa Park Renovations $18,500 5. Metal Fish Sculpture $1,100 Total $769100 ALTERNATIVES 1. Council could choose to redistribute funds among projects, allocating more funding than recommended for one project and less for another. Without knowing specifically at this time what form the artwork may take for any of the projects, staff does not recommend giving higher funding priority to any one project. 2. Council could choose to delete one or more projects from the recommended list and redistribute funds among the remaining projects. Using the criteria listed above, staff spent considerable time discussing and identifying appropriate CIP projects to receive public art funding. The current recommendation reflects their intent to meet the criteria and acquire the maximum amount of public art with available funding without diminishing the potential quality of the artwork received. .3. Council could review the attached list of 2001-03 CIP projects generating public art funding and select other projects from the list to receive public art. ATTACBMENTS List of 2001-03 CIP projects generating public art funds ATTACHMENT , . 2001-03 Financial Pi-a CAPITAL IMPROVEMENT PLAN PROGRAM: Cultural Activities REQUEST TITLE: Public Art Project Summary Funding public art in accordance with City's"I% for public art"policy will cost $42,100 in 2001-02 and$34,000 in 2002-03. Project Objectives Provide funding for public art in accordance with City policy. Existing Situation Under the City's public art policy, 1% of the construction component of capital improvement plan (CIP)projects is to be allocated for public art. Excluded from this 1% requirement are underground projects, utility infrastructure projects, funding from outside agencies, and costs other than construction such as study, environmental review, design, site preparation and acquisition. Generally, it is preferable for the public art component to be integrated directly into the project. However, in, some cases, this is not practical or desirable. In these circumstances, an "in-lieu" contribution may be made to a generic public art account that can be used to fund public art in conjunction with other projects or locations where it can have a greater public benefit than if it arbitrarily installed with a project to which public art was not well-suited. To ensure that funds are adequately budgeted for public art regardless of whether public art will be directly incorporated into the project, funds for this purpose are identified separately in the CIP. After the Financial Plan is adopted, the CIP Review Committee will review the approved projects, and make recommendations to the Council regarding the allocation of public art funds to specific projects. This review, should be completed by September 2001. Following Council approval,briefings will be held with affected project managers on the most effective process for incorporating public art into their project. Goal and Policy Links s Public art policy e Public art policies and procedures manual ■ Financial Plan policies Project Work Completed None. Project Phasing,Costs and Funding Sources The following reflects construction costs for those projects that meet the City's requirement for a 1% public art allocation, and the resulting public art budget request: c4 -,3 383 ATTACHMENT Public Art 53,200 &idencestorage 30,000 Refurbish fire station no.4 50.000 South Street widening 190.000 Foothill bridge construction Bridge maintenance 50,000 50.000 50,000 50,000 97,000 104,000 119,000 107,000 Street sign replacement 250,000 250,000 Utility undergrounding 2 pavement reconstruction,resurfacing ,150,000 2,215,000 2,281,000 2,350,000 150,000 Downtown street light pole painting 100,000 100,000 Traffic signal improvements 70,000 Laguna Lake Prefurn0 arm silt removal 25,000 Tank Farm Road bridge silt removal 282,000 313,000 Storm sewer construction 105,000 Johnson underpass lift station 75,000 37,000 Los Osos Valley Road medians 25,000 25,000 Neighborhood traffic management 2,100,000 Railroad Safety Trail phase 3 3,000,000 Railroad Safety Trail phase 4 1,590,000 Los Osos Valley Road-Hwy 101 interchange 320,000 Santa Barbara Street widening 135,000 New traffic signal installation Morro-Santa Barbara Street traffic signal 120,000 54,000 Montalban Street bridge Orcutt Road-Bullock Lane street improvement 324,000 35,000 35,000 Downtown pedestrian improvements m Mission Plaza:Broad Street closure 75,000 New sidewalk construction 100,000 100,000 100,000 100,000 335,000 345,100 Mission-style sidewalks South Higuera Street sidewalk 37,000 75,000 Laguna Lake Park pole barrier replacement Mission Plaza creek walkway stabilization 50,000 45,000 Park asphalt resurfacing 45,000 Park turf installation 45,000 Johnson park picinic area renovation 25,000 Sinsheimer tennis court resurfacing Swim Center chemical storage 45,000 260,000 High rate sand filtration 65,000 Swim Center painting 163,000 183,000 450,000 Sinsheimer Park improvements Santa Rosa Park renovations 100,000 Damon-Garrcialights 391,000 4,500,000 Community Center/therapy,pool 149,600 French Park playground equipment 123'000 Laguna Lake Park playground equipment 92,000 92,000 Laguna Lake park improvements 40,300 Lac Praderas park improvements 65,300 Marsh/Santa Rosa Park 200,000 Neighborhood park improvements Rodriguez Adobe neighborhood park 144,000 Laguna Hills playground equipment 155,800 49,600 126,000 Playground equipment upgrades Lighted softball"fields 500,000 200,000 200,000 Laguna Lake dredging Open space preservation 50,000 Jack House roofing 25,000 25,000 Jack House fire sprinklers 58,000 Jack House foundation repairs 100,000 Downtown visitor signage Civic offices --- °zxa` �t42314022,0210000 City Hall window replacement 00 - 8e.300 �>26e0b1400 u1Total 51,70 .6006 Public Art L% 384 C�