Loading...
HomeMy WebLinkAbout01/21/2003, BUS 4 - WATER REUSE PROJECT - APPROVE PLANS AND SPECIFICATIONS councit 1 /21 /03 agcnaa Report N°!. CITY OF SAN LUIS OBISPO FROM: John Moss,Utilities Director Prepared By: David Pierce,Water Projects Manager SUBJECT: WATER REUSE PROJECT—APPROVE PLANS AND SPECIFICATIONS CAO RECOMMENDATION 1) Approve plans and specifications for the Water Reuse Project - Water Reclamation Facility Improvements Specification No. 99124-90553-A, 2) Approve plans and specifications for the Water Reuse Project - Recycled Water Transmission/Distribution Pipelines Specification No. 99124-90553-B, 3) Authorize staff to solicit bids, 4) Authorize the CAO to award the contracts if the total is within the engineer's estimate for the two projects combined of $13,626,790, contingent upon approval by the State Water Resources Control Board (SWRCB), 5) Adjust the project budget to $18,262,500,.and 6) Appropriate the additional funding of$3,770,700 from the SWRCB loan proceeds. DISCUSSION Brown and Caldwell with Cannon Associates has completed the plans and specifications for the Water Reuse Project which will be bid and constructed as two separate projects. Project A is for the modifications at the Water Reclamation Facility. This project will provide facilities for the addition of chemicals, for disinfection using chloramines, for storage, and for pumping. Project B is for the pipeline that extends from the west end of Los Osos Valley Road to the East end of Tank Farm Road along the route shown on the attached project map(attachment 1). The following is the estimated schedule for the project Bid Opening March 2003 Contract Award June 2003 Construction Start July 2003 Project Completion December 2004 FISCAL IMPACT Engineers Estimate: Water Reclamation Facility Improvements $5,640,000 Recycled Water Transmission/Distribution Pipelines $7,626,700 TOTAL $13,626,790 The Water Reuse Project CIP (FY 2001-2003 Financial Plan appendix B page 106) construction account currently has a balance of$10,449,000. An additional $3,777,700 needs to be appropriated Water Reuse Project—Approve Plans and Specifications Page2 to fund the current construction estimate, including contingencies ($600,000). Grant funds for this project have been awarded from the State of California to the City in the amount of$3,390,000. In addition, the State has guaranteed a low interest State Revolving Fund Loan for up to $12,600,000 (The exact amount of the loan will be determined by the construction bids). At this time, staff estimates the interest on the loan will be about three percent. The following cost estimate for the Water Reuse Project as of January 21, 2003 includes the revised construction estimate, an increase for Construction Management (approved when the City Council awarded a contract to Tetra Tech on September 3, 2002) and an increase in the costs of the design contract with Brown and Caldwell reflecting both those addendum previously approved by the City Council and addendum 4 for $467,000 to provide design engineer services during construction. (Addendum No. 4 also on this Council Agenda for January 21, 2003). Project Costs (1121703) Approved Funding Additional Total Appropriation Environmental eview215,000 Environmental Mitigation 1,070,000 1,070,000 User Site Modification 502,939 502,939 Design 1,012,310 467,000 * 1,479,310 Construction 9,849,090 3,777,700 13,626,790 Construction Management 768,410 768,410 Contingency 600,000 1 600,000 o > > Project Funding(1121103) Approved Additional Total Funding Appropriation State of Califomia Grant Funds 3,390,000 3,390,000 Low Interest Loan Funds 8,410,000 3,777,700 12,187,700 Water Fund 2,217,749 467,000 * 2,684,749 o 9449 (*This item is considered on separate report"Water Reuse Project—Office Engineering Services") To date more than $1.5 million has been spent from the Water Fund on this project. The annual analysis of the water fund provided for the payment of the project debt service, currently estimated at $846,918, based on a three percent interest rate. While the estimated debt service is more than was calculated in last year's fund analysis, the water fund will be able to support this payment. A combination of factors (first SRF repayment due in 2005; reduction in interest payment from the recent refinancing of the water bonds; other interest payment for master plan improvements likely not coming on line in 2005 as assumed in analysis, as well as the ability of the water fund to pay directly for some of the improvements) make it likely that the next water `'T—a Water Reuse Project—Approve Plans and Specifications Page3 . fund analysis will show that rates will not increase more than forecasted over the near term to bring in this new water supply. Rates were estimated to increase by only about three percent. The water fund worldng.capital was estimated at about $4.8 million at the conclusion of the 2002-03 fiscal year. The proposed actions will not reduce the water fund working capital balance below the minimum level of 20% of operating expenditures ($1,007,000). ATTACHMENTS 1. Project Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE . 1. Water Reuse Project - Water Reclamation Facility Improvements Specification No. 9912490553-A 2. Water Reuse Project -Recycled Water Transmission/Distribution Pipelines Specification No. 9912490553-B 3. Engineer's Estimate \\879_MORRO\SYS\GROUPS\UTIL\Council Agenda Reports\2003 Council Agenda Reports\WRP_Approve_P&S_CARdoc �-3 Water Reuse Project-Approve ss and Specifications Attachment 1 O LU a O E � L M N IA i �� •� m m a` 0) y L a o � a 4y Z m IV c. o ? w o 0 0 a a w J 'i V 1AI \._. •r aCD fe a � s � ^ � m O ` J ®- CD � n � O �0 < _. (D 3 � � CD � CD. CDC + cn C/) m U) m c,, � �0 (> o, ON C° 0 N O N L O> O ® O m i OO p0 too O . O O � o O O 00 Mi _ r 0 a 0 _ w ate 61, 61, cc aq CD 1> m o04� 41. o 0 0 a o %mi-m° m CD crMIL Cl)y � J � J J O W F=IL X O ►--+ L N 00 p O'� `O r.� k4:1, vin 9�6 p � o T O �I O W afe Poll� ,�� O g CD C p oCD p N Oc w `n (D O �l �l O O Q.. �• 4 _P�- O O m rMoL M mn C cL Cl) N J ►� Z1 00 00 `O �9 O O � o T Q N 0 e c� m O o 0 Rmo 0 °m �N v a n O y 5 3 v v o CD CD o 0 n 3 � - ni c 0 cD CD �� .�� r..f m 3 �, /� CD co _ O h (D :3 O ` -- to o CD CL CD cc .4) N O CO OD -1 c D o c CD C G) (DN 3 / rn 7 �■ x 'o v CD CD 0 0 � O �'► O 5 �� /�L 0 O Q. O ., U o D 0 Q ca 0 a 3CD CL CD O N Q CD v 0 k� 777 0 1 t v /rMIL J 0 0 a v ;l o� I ' W am �- LM .� LU cn �� ✓r - L 0 a� W ISL V W �\ Qy, = m CL rA 6 a` a V b � OC � � I ahem