Loading...
HomeMy WebLinkAbout07/15/2003, COUNCIL LIAISON REPORT 1 - JULY 10, 2003 NORTH COUNTY WATER RESOURCES FORUM MEETING RECEIVED July 11, 2003 JUL 14 2003 To: Council Colleagues SLO CITY CLERK From: Ken Schwartz, Co u i Prepared by: John E. Moss,Utilities Director Subject: July 10, 2003 North County Water Resources Forum Meeting A presentation regarding the Paso Robles Groundwater Basin Study was provided at the July 10, 2003 North County Water Resources Forum meeting. You may remember that the Phase 1 portion of that study was completed last year and essentially analyzed the current status of the basin. The conclusions of the phase 1 study were that the basin is essentially in equilibrium but that projected development in the County over the next 20 years will likely put the basin in overdraft. Phase 2 study services were initiated last year and are intended to create a model by which to evaluate the effects of future actions and scenarios, such as changing land use, urban growth, and changing agricultural practices, on the Paso Robles Groundwater Basin. At the meeting the consultants,Fugro Engineers and ETIC Engineering, presented the results of Task 1 of the Phase 2 program. The intent of Task 1 is to compile all of the data from the Phase 1 study into a form that can then be used to develop and implement a model. The data from the Phase 1 analysis, which was actual measured in-field data, can be used to calibrate and check the model and modeling runs. All in all, the consultants appear to be doing an excellent job and the study and modeling of the Paso Robles Groundwater Basin looks like it will be a very valuable tool in making future decisions for the North County. If you have any questions regarding this meeting, please feel free to call Utilities Director,John Moss. IC OUNCI 2-CDD DIR OCAO Z-FIN DIR 8-ACAO .2 FIRE CHIEF RED FILE ZATTORNEY ,�PW DIR MEETING AGENDAQDUfle CLERK/ORIG c2 POLICE CHF RD�Fp ,HEADS 0 REC DIR DATE ITEM # tf liat�on�r 1 QIL DIR__ 2 HR DIR