Loading...
HomeMy WebLinkAbout08/19/2003, C8 - REQUEST FOR PROPOSALS FOR DESIGN OF ALRITA PUMP STATION REPLACEMENT PROJECT, SPECIFICATION NO.90234 J council °' AM&u5T ,9,ZO3_ j acEnda nEpont CITY OF SAN LU I S O B I S P O FROM: John Moss,Utilities Direct �. Prepared By: Dan Gilmore,Utilities En ee,l SUBJECT: REQUEST FOR PROPOSALS ..FOR DESIGN OF ALRITA PUMP STATION REPLACEMENT PROJECT,SPECIFICATION NO.90234 CAO RECOMMENDATION: 1) Approve the Request for Proposals (RFP) package, and authorize staff to advertise for proposals. 2) Authorize the CAO to award the contract if the proposed cost is less than available budget. DISCUSSION: The Alrita Pump Station was originally installed in 1958. The hydropneumatic pump station boosts the water pressure to approximately 12 homes on Alrita Street, above Flora Street near Laurel Lane. The Alrita Pump Station has become unreliable,resulting in increased maintenance requirements. The existing pump station has two pumps, each capable of providing 100 gpm. Even the combined flow falls substantially short of the Fire Department target of 1,500 gpm minimum fire flow for this area. The Alrita Pump Station is proposed for replacement in order to reduce maintenance requirements, enhance reliability, and increase fire flows. Providing increased fire flows is especially important, as this area is also a wildland interface. Approval of the recommended action will allow staff to select a qualified consultant to perform the design and prepare contract documents for the construction of the pump station replacement project. Once plans and specifications are prepared, they will be brought before Council for approval. The construction project will then be advertised for bids. FISCAL IMPACT: Funding for the project is included in the 2001-03 Financial Plan, Appendix B — Capital Improvement Plan, page 124. There is a total of$470,000 budgeted for this project, with $50,000 of that amount earmarked for consultant design services. Successful completion of the project is expected to reduce demands on operating staff by reducing the level of maintenance required at the pump station. R Council Agenda Report—RFP for Automatic Gate Project Page 2 ALTERNATIVES: Defer or.delay the project. This alternative is not recommended, since the pump station has become unreliable and requires an increasing amount of maintenance. The Request for Proposals is available in the Council Reading File. G:%Cow dAgmdnetponM=Hoopcele ON 0%