Loading...
HomeMy WebLinkAbout09/16/2003, C8 - STREET RECONSTRUCTION AND RESURFACING PROJECT, SPECIFICATION NO. 90346 V councit Wept 16,2003 j acEnoA Report t.N.� �S C I T Y O F SAN LU I S O B I S P O FROM: Michael D. McCluskey,Director of Public Works Prepared By: Barbara Lynch Civil Engineer 0— SUBJECT: STREET RECONSTRUCTION AND RESURFACING PROJECT, SPECIFICATION NO. 90346 CAO RECOMMENDATION Approve additional funding for the Street Reconstruction and Resurfacing Project. DISCUSSION Work is nearly complete for the summer street reconstruction project. During the third week of August, virtually all of the asphalt was placed. The construction crew encountered a couple of problems in the paving areas which resulted in the use of additional asphalt beyond that accounted for in the project proposal. In the Oceanaire Area it was discovered that the streets were built on a sandy, pebbly material rather than an accepted base material. The material did not stay compacted once the existing layer of asphalt was removed, but moved around when a vehicle drove on it. The loosest areas were removed and replaced with asphalt prior to paving. In a couple of areas, the asphalt was thickened during the paving area to bridge weak spots and allow the pavement to be placed and compacted properly. A couple of areas in the Oceanaire area and the Pepper Street alley were wet to the point that they pushed through the new pavement as it was being constructed. The work was stopped and the area removed and a deep section of asphalt replaced to allow paving to continue. Final totals of the asphalt laid during the week show we have exceeded our original asphalt estimate by about 25%. FISCAL IMPACT Funding for the General Fund portion will come from the existing street paving project account. Adequate funds remain from the 2002-03 street reconstruction budget to cover the additional costs. General Fund Water Fund Sewer Fund Total Current Project Budget: $ 816,000 $45,600 $41;500 $ 903,100 Additional Funds Requested: $75,000 $0 $0 $75,000 Total: 891,000 $45,60 0 $41,500 $978,100 Funds Available: $265,000 g:\-cuffent projects\.ttreet improvements\2003 paving projects\90346-reconst and resurf 02-03\documents\1-staff reports\90346 add$2.doc