HomeMy WebLinkAbout10/21/2003, C2 - 2003-05 CAPITAL IMPROVEMENT PLAN PUBLIC ART PROJECTS council
j ac En ba Report " z
CITY O F SAN L U I S OBISPO
FROM: Wendy George, ACAO
Prepared By: Betsy Kiser, Principal Administrative Analyst E%K
SUBJECT: 2003-05 CAPITAL IMPROVEMENT PLAN PUBLIC ART PROJECTS
CAO RECOMMENDATION
1. As part of the Capital Improvement Plan, approve public art funding for the following
projects: $40,000 to enhance the fountain at Marsh and Higuera Streets; $23,100 for the
new Therapy Pool or its environs; $20,000 for the Damon-Garcia Sports Fields; and
$18,900 for artwork outside the Police Department.
2. Direct staff to include public art enhancements to the Foothill Bridge in the 2005-07
Financial Plan.
DISCUSSION
Background
The City's adopted Art in Public Places Program states that 1% of the cost of all eligible City
Capital Improvement Projects (CIP) shall be committed to public art (reduced to 1/4% for 2003-
05 due to budget constraints). Once the Financial Plan is approved by Council, the allocated
funding is placed in a separate public art account and later divided among projects identified and
recommended by the CIP committee and approved by Council.
Key Issues
This year, three issues played a role in determining the amount of funding available for art
projects. Foremost, because of difficult financial times, the Council allocated 3/4% for public art
rather than the customary 1%, thereby reducing the amount of funding available for public art.
Second, and again because of budgetary constraints, only maintenance and safety projects were
funded in the 03-05 CIP, and rarely do these types of projects lend themselves to the inclusion of
public art. Lastly, over the past several years, a sizeable sum of public art in-lieu fees has been
received from private developers. Policy dictates that these funds can be used for the
"acquisition, installation, and improvement of public art in the City". The CIP committee
therefore recommended enhancing the 2003-05 public art funds with public art in-lieu funds to
allow for more extensive public art projects.
C,Z-/
Council Agenda Report-2003-05 CIP Public Art Projects
Page 2
Selection Process
The CIP committee met on September 15, 2003 and identified four projects that met the
"projects suitable for public art" criteria listed below. Two of the four recommended projects are
tied to current CII' projects. Other CIP projects did not meet criteria #1 and/or criteria #2.
Therefore, two other art projects were recommended that would best meet all four criteria. (See
Attachment 1 for the list of approved CIP projects contributing to public art funding.)
1. Project should have high public visibility and use.
2. Project should lend itself to the inclusion of public art.
3. Project should be public art ready, meaning the project should be near or under
construction and will be completed within the two year CIP.
4. The number of projects should be limited to a few in order to focus staff efforts and
result in meaningful pieces of public art.
Committee Recommended Projects
1. Fountain at Higuera and Marsh Streets - $40,000 to enhance the fountain at the west
entrance to the downtown core. (A non-CIP project with high visibility.) The
fountain was built by the members of The Monday Club in the 1960's. Staff
contacted the President of their board to seek endorsement for the project and on
Monday, October 7, 2003, the board gave their enthusiastic support. They requested
that the City allow the board to see preliminary plans. (No formal minutes available.)
2. New Therapy Pool- $23,100 for artwork associated with the therapy pool, the Jacuzzi
or the swim center in general.
3. Damon-Garcia Sports Fields - $20,000 to augment $20,000 previously allocated to
the project for public art. The original cost estimate for the Damon-Garcia Sports
Fields was $6 million, therefore the 1% public art component should have been
$60,000. When it appeared that funding for the project would be tight (prior to
receiving the favorable construction bids), staff requested, and the Council approved,
a reduced public art funding level of$20,000. With funds available from the public
art in-lieu account, staff recommends increasing the allocation to $40,000 to better
reflect the level of funding originally anticipated for the project.
4. Police Department — $18,900 to provide a piece of artwork in front of the police
station. (A non-CIP project.) The CIP committee felt that the grassy area outside the
station on Santa Rosa Street lends itself to the inclusion of public art and has high
visibility as a northern entryway into the downtown core. (Note: The City just
completed the women's locker room—a CIP project for 2001-03.)
GAProjects&Programs\Public Art\Current Projects\CIP Public Art Projects2003-05.doc
Council Agenda Report-2003-05 CIP Public Art Projects
Page 3
Recommendation of the Architectural Review Commission (ARC)
On March 17, 2003, the ARC reviewed and approved the proposed replacement bridge for
Foothill Boulevard. As part of the approval, the ARC recommended that an artistic railing
design be used for the bridge. The commission also suggested that other public art opportunities,
such as decorative pilasters at each end of the bridge, should be planned as part of the project.
(See Attachment 2 for ARC meeting update.) The CIP committee discussed Foothill bridge as a
possible site for public art. Since 1) the bridge replacement will not be complete until mid-2005,
2) changing the bridge design at this time could require renewed CalTrans approval and further
delay construction of the project, and 3) decorative railings can be added easily at a later date, the
CIP committee did not include it as a recommendation for this funding cycle. However, staff is
recommending that public art funding be included for this project as part of the 2005-07
Financial Plan.
FISCAL IMPACT
The following funding is available for public art projects as part of the City's CIP budget and
Public Art In-Lieu Funds:
2003-04 2004-05 Total
General Fund $26;500 $16,600 $43,100
Public Art In-Lieu $58,900 ------- $58,900
Total Available $102,000
The proposed funding allocation is as follows:
1. Fountain at Marsh and Higuera Steets $40,000 FY 03-04
2. Therapy Pool $23,100 FY 04-05
3. Damon-Garcia Sports Fields $20,000 FY 03-04
4. Police Department $18,900 FY 04-05
Total $102,000
The Public Art In-Lieu account will have$1,540 remaining once the above funds are allocated.
These funds are replenished as private development occurs.
ALTERNATIVES
1. The Council could choose to redistribute funds among projects, allocating more
funding than recommended for one project and less for another.
2. The Council could choose to delete one or more projects from the recommended list
and redistribute funds among the remaining projects. Using the criteria listed above,
GAProjects&Programs\Public Art\Current Projects\CIP Public Art Projects 2003-05.doc
&a_3
Y.
Council Agenda Report-2003-05 CIP Public Art Projects
Page 4
staff spent considerable time discussing and identifying appropriate projects to
receive public art funding. The current recommendation reflects their intent to meet
the criteria and acquire the maximum amount of public art with available funding
without diminishing the potential quality of the artwork received.
3. The Council could choose to fund the replacement bridge at Foothill Boulevard
during the 2003-05 Financial Plan and redistribute funds among the remaining
projects. Staff does not recommend funding the bridge at this time for reasons
provided in the staff report.
4. The Council could recommend other locations for public art.
ATTACHMENTS
1. Public Art CIP project list
2. ARC meeting summary, March 17, 2003
G:\Projects&Programs\Public Art\Current Projects\CIP Public Art Projects 2003-05.doc
L, Al IAUHMLII 1
ff a
y PUBLIC ART
1 Project Summary
q Funding public art at 75% of the City's public art policy level(0.75% instead of 1%) will cost.$26,500 in 2003-04
I and$16,600 in 2004-05.
Project Objectives
Continue funding for public art but at a reduced level that is still greater than private sector requirements.
Existing Situation
Overview. Under the City's public art policy, 101b of the construction component of City capital improvement plan
(CIP) projects is to be allocated for public art. Excluded from this 1% requirement are underground projects,
utility infrastructure projects, funding from outside agencies, and costs other than construction such as study,
environmental review, design, site preparation and acquisition. Non-residential, private sector improvement
J projects are also required to include a public art component.. While there are some exceptions and the amount
J varies depending on the size of the project; non-residential private sector projects are generally required to include
a public art component with a value that is at least 0.5%of construction costs.
City Projects. Generally, it is preferable for the public art component to be integrated directly into the project.
However, in some cases, this is not practical or desirable. In these circumstances, an "in-lieu" contribution may
be made to a generic public art account that can be used to fundpublic art in conjunction with other projects or
locations where it can have a greater public benefit than if it was arbitrarily installed with a project to which
public art was not well-suited.
To ensure that funds are adequately budgeted for public art regardless of whether public art will be directly
incorporated into the project, funds for this purpose are identified separately in the CIP. After the Financial Plan
is adopted, the CIP Review Committee will review the approved projects, and make recommendations to the
Council regarding the allocation of public art funds to specific projects. This review should be completed by
September 2003. Following Council approval, briefings will be held with affected project managers on the most
effective process for incorporating public art into their project.
JGoal and Policy Links
1 1. Public Art Policy
2. Public Art Policies and Procedures Manual
3. Financial Plan Policies
4. Strategic Budget Direction for 2003-05: Funding public art at a reduced level
Project Work Completed
None.
Project Phasing,Costs and Funding Sources
The following reflects construction costs for those projects over thenext four years that meet the City's
requirement for a public art allocation and the resulting public art budget request at 0.75% of project costs:
249
Ca2_S
ATTACHMEW
A.
PUBLIC ART
540,000 160,000
Public safety dispatch center 860,800
Police facilities development 45;000
Access-Fite Station No.4 18,000 18,000 18.000 18,000
Neighborhood traffic management 372 200
Foothill Boulevard bridge 376,800 872,700
Street widening on Higuera-Marsh to High 50,000
Street widening South Higuera to Beebee 270,000 224,000
Bullock-Orcutt realignment and signalization 95,000
Traffic safety report implementation 1,0001000
LOVR interchange improvements 35,000 35,000 35,000 35,000
Traffic.safety improvements 40,000
Traffic signal at Broad&Pacific 50 000 50,000 50,000 50,000
Street light electrical service boxes 85,000
Street light replacement-Broad Street 617,900 1,666,400
Street reconstruction,resurfacing,resealing 1,525,000 1,570,800 1,
1,900,000
Railroad Safety Trail-Phase 3 6 500 48,500
Railroad Safety Trail-Phase 4 150,000 150,000
Garden Street makeover 60,000 60,000 70,000 70,000
Sidewalk repair 70,000 50,000 70,000 35,000
Silt removal 45;000
Johnson Park picnic area renovation 45;000
Santa Rosa Park turf installation 25 000
Sinsheimer tennis court resurfacing 32,000
Tree maintenance-South Higuera 68,800 15,100 126,000
Playground equipment replacement 250,000
Swim Center high rate sand filtration
65,000
Swim Center painting 30,000
Jack House fire sprinklers 58,000
Jack House foundation repairs 22 000
Co nation yard building roof re air. .
Total 3,535;700 2¢15,100 3,631,600 5,923,100
Public ArtIIIIII @III IIIIII0III.III7III5% $26,500 $16,600 $27,200 $44,400
Project Funding Source General Fund
I
Environmental Review. This will be evaluated on a case-by-case basis,but this is not likely to be a concern.
I' Project Manager and Department Coordinator
I
Project Manager. To be assigned by Engineering or Operating Department on case-by-case basis
Department Coordinator: Betsy Kiser
Alternatives
' 1. Do not allocate funds for public art. This would be inconsistent with adopted Council policy.
2. Increase the allocation for public art to the 1%policy level. This would be inconsistent with the Council's adopted
budget-balancing strategy.
Project Effect on the Operating Budget. This depends on the maintenance needs of the public art ultimately installed;
however,no significant fiscal impacts are anticipated.
250
.ATTACHMENT 2
Meeting Update
ARCHITECTURAL REVIEW COMMISSION
March 17, 2003 Monday 5:00 P.M.
ROLL CALL: Commrs. Allen Root, Zeljka Howard, Jim Lopes, David Smith, Michael
Boudreau, Vice-Chair Rob Schultz and Chairperson Charles
Stevenson
All of the Commissioners were present.
ACCEPTANCE OF AGENDA: Commissioners or staff may modify the order of items.
The agenda was accepted as written.
MINUTES: Minutes of February 3,2003. Amend or approve.
The minutes were approved as written.
PUBLIC COMMENT:
PUBLIC HEARINGS:
1. 755.463.769 Santa Rosa Street and 1060 and 1064 Mill Street.. ARC MOD 97-
99; Re\Sultz
vised building colors for a new office building; O zone; Cliff Branch,
applicRicci)
The ARCfinal approval to the revised building colors on a vote of 4-2-1
(Stevensoultz voting no, Root abstained due to a conflict of interest). The
discussion the original ARC approval for the project and how the proposed
modificatioith building's art deco style.
2. 2290 z Aven ARC 11-03; Review of a new single-family residence
on a sensitive site; R-1-S \recommendation
Roland Schwartz, applicant. (Michael Codron)
The ARC granted final approa project on a vote of 7-0. The Commission liked
the proposed Craftsmen artu I style of the home. Discussion focused on
landscaping and on the projemp ce with the conditions of approval established
by the use permit that authorie deve ment.
3. Downtown. ARC 193-02iew of a d ntown historic street lighting program;
City of San Luis Obispoic Works Dep ment, applicant. (Continued from
March 3, 2003) (Hilary H )
The ARC vote 7-0 to grantapproval to the desig f the historic street light
standards. The ARC followeCHC recommendation a approved the Partially
Obscured Non-Diffuse (PONemi-opaque) globe with a m tal-halide bulb (white
light) and a 12-foot pole.
cz-�
ATTACHMER2
Architectural Review Commission
Page 2
4. Los Osos Valley Road. ARC 5-03; Review of new landscape medians along Los
Osos Valley Road from Royal Way to western City limits; PF zone; City of San Luis
Obispo Public Works Department, applicant. (Hilary Hodges)
The ARC approved the landscaping design for the proposed medians on 4-2-1 vote
(Schultz and Smith voting no, Howard abstained). The Commission required the plan to
be modified to include at least one type of large canopy tree in the planting palette.
There was public testimony from neighbors of the project, who expressed a desire to be
more involved in the process of deciding where the medians should fo.
5. Foothill Boulevard. ARC and ER 188-02; Review of proposed replacement
bridge and ancillary road improvements, and environmental review; City of San Luis
Obispo Public Works Department, applicant. (Michael Codron)
The ARC voted 7-0 to approve the proposed bridge and adopt the Mitigated Negative
Declaration for the project. As part of the approval, the ARC recommended that an
artistic railing design be used for the bridge. The Commission suggested that the public
art money for the project (1% of the City's contribution) could be combined with the
portion of the project budget attributed to the railing, and that the total amount could be
used to fund an artistic railing design, which would be reviewed through the City's
public art process. The Commission also suggested that other public art opportunities,
such as decorative pilasters at each end of the bridge, should be planned for as part of
the project.
COMMENT & DISCUSSION:
6. Staff
A. Agenda Forecast
Staff provided the Commission with a forecast of upcoming meeting agendas.
7. Commission
A. Recent Project Review— Lessons Learned
B. Obispo Beautiful
Chairman Stevenson suggested that the Commission consider nominations for
the Obispo Beautiful Awards at the next meeting.
The meeting ADJOURNED at 8:30 to a regular meeting scheduled for Monday, April 7,
2003, at 5:00 p.m., in the Council Hearing Room at City Hall, 990 Palm Street.
Presenting Planner: Michael Codron p
x'.2'0
Please
Place 37¢
Stamp
Here
San Luis Coastal Unified School District
1500 Lizzie Street
San Luis Obispo, CA 93401-3062
Attention: Dr. Steven Ladd, Superintendent
Presorted
Standard
U.S.POSTAGE
PAID
Permit No.7
San Luis Obispo
San Luis Coastal Unified School District CA 93401
1500 Lizzie Street
San Luis Obispo, CA 93401-3062
a
' f' i ;
From the ,..
Desk of
F a.
i
o- ; - Dr. Steven Ladd
°t Superintendent,
San Luis Coastal
Unified School District
:lmulg :auogd Sutuati3 :auogd (vQ
:dlz :alvls 4!D
:au4vN
:papumv to puanv uajpl1go/pl}q-,1(w(s)loog.?s
:sluauau40D
❑ ❑ ❑ :raglp•L
❑ El ❑ Mai w,(4Tqu s,ppip u Page regi suiaigad cpm dpq ogm'siopsunm loogas SurmelupW•9
❑ ❑ ❑ slagxo pue
wa=j0JU3 mei!suoissa3oad a mTfoaq pup Smsmu s(Soiougoal iaindmoo se gons'sioogos gSrq xp m swu Bold iuuoilmon pawauo nam Sur
ppy IS
❑ ❑ ❑ £-x sapLB m Luotp SuyOlsal. yssod pup`q-y sapua8 m suni2old lie pue orsnm SmmMUTUW It
❑ ❑ ❑ •loogos m Su.g2Snns air oqm sppi diaq o1 ioogos AinuaLuip,Dana 1p slsr Wds ortuappay•£
❑ El 1:1 •sioimnpo io3 alqupioge,(tnmunuoo mo m Suing
ahem dpq 3pgi suie�oid pue suoprpuoo Suniiom panoadun'sa. les anppadutoa qum'gpzs pue siagopa��ripnb uagSry acp Suiuiz�aa pup 8uua=V T
❑ ❑ ❑ •ssep lad sivapnis#ao f£of saseavm ams ssep wag sopelS iayo Suljuanald pLwapels plc Onolgi uzaidiapurg m sans ssep paonpai Surme Uww•I
Mol •pays g9lH :spaau luuoixwnpa pu4siQ loogas pagtun Insuoo s n I u-eS SuVAoiio;alp azguoud amid
P . e 1
xuapuaxuuadnS
up g`ppu W uanaxS
7wf;�
,,(lazaauiS
-noxi utoz3 Suupag o;pzunuo3 lool I •sn ox xuapodun azp suoixsaSSns pup
II
suoundo moi•noxi�Iurq L•glzi BaquwAoN Iq am o;;t ujnw pup`xi axaldwoo`�ianzns
agx jjo zpax lilduiiS -no,(ox aaupxzodun ziagx 3o zapzo ui paxsil saixizoizd aqx*mi pinom
noxi 3i xi axpiaazddp pinom I nms paga B aq; uilaI uioa q sn iaq aseald
�luttlx noxi xugm
nAou)l ox a?lil pj lazmml�3 agx zoi suoisoop Axl s;)7ui uoixmnpg 3o pmog agx azo3ag •uotxuanpa
3o Alilmb mo SuiuMuipui ox Ipixuassa saain.zas pup sumBozd 3o isil a/gixuapi sn padlaq
anpq szaquzauz lixiunuzuzoa pup szagapa;Isxuazpd sTpuow luzanas xsed xp zany •isquassa si
3n m unuo:)•suounlos algissod pup spaau leuoixeMpa Suixpnluna si uoixu:)npg3o pmog
agx(sloogas Tmol mo ui uoix�nzxsui uzoozsstp 3°Axilpnb arp xaaxozd ox xzojja up ul
-jsiz xe we—swrBozd
lepuassa zagxo pule szolasunoo loogas lazis sspla paanpaz zo3 spun3`szaq:)uax,ixilunb—xsout
anlpn Axiununuoa pup sxuaznd zno surersozd agx mou xng •algissod sp woozssup aqx woz3 Aump
zu3 su xno ox xzojja laana apuuz spq uoixpanpg 3o pnog aqZ •xa pnq zno uzoz3 samxipua a ui
uoilliiu Oi nano xna ox paazo3 uaaq spq xaizxsip loogas aqx szpa £xsp agx zany sloogas mo
zo3 sasualluga JUMUiusis Suixpaza si Slsiza xaspnq axpxS agx`pzuag,ilgpgozd anuq noxi sy
saps
lo?•TxsiQ IoogaS PaUiull MseoD sinrl upS uoixp:)npa 3o filen q iq aqx 3o aznxn3 aqx xnogp
pauTaauoa wp I sloogas zno at xuauzanaigas xuapnxs aqx 3o pnoz an Pre I opl4m xng
•sloogas pup sutoozSSTP Ipaol xisin I sp ssaaans fuumponpa 3o suSis
aas I Aup Xizang •uiaxsAs Suixsax pazipMpupxs oviS agx Aq pamspaw sp xuacuanaigau xuapnxs ut
ssazsozd apput xaizxsip loogas mo ui loogas jizana lgenxzrn lzpaA xsu-I •Sutnozdun Alsnonuixuoa
uaaq seq Iixiununuoa zno ui uotxuanpa 3o Axilpnb aqx xzodaz ox paspald um I
-Tx.ft x noji xpgM aw
llax pup xi pew ox xuawoui a all aspold•sloogas Ieaol mo
uo axupdn xuuxzodun up tpyA Suppm um I`x3insi(j Iooq:)S
a u spo sm up o xua uaxuuadn
r ffi: p Tai n ipx S 3 p S sv
6s�ogTaN pue s,uand.x�aQ
�az�e�szQ 1oor�as pa�;iun 1n4svoD szn7 unS •&-,,