FROM: Jay D. Walter, Interim Director of Public Works #0
PREPARED BY: Gregory A. Walker, Project Coordinator
SUBJECT: UTILITY TRENCH REPAIR—FALL 2004
SPECIFICATION NO. 90511
CAO RECOMMENDATION
1. Approve Specifications for"Utility Trench Repair Fall-2004,Specification No. 90511"
2. Authorize staff to advertise for bids.
3. Authorize the CAO to award the contract to the lowest responsible bidder within the engineer's
estimate of$73,520.
DISCUSSION
Throughout the year, City Utilities Department staff make emergency repairs to water and sewer lines in the
city street. At the time of repair, temporary asphalt patches are placed at the surface of the street where
trenches have been dug. These temporary patches eventually need to be replaced with a stronger and more
permanent asphalt patch. As the number of patches that need repair accumulates over time, it becomes
economical to make these permanent repairs under a single contract. This project will repair 94 trenches
throughout the City. A complete list of all locations is shown in the Special Provisions.
This project is part of the Water Distribution System Improvements listed in the 2003-2005 Financial
Plan,Appendix B pages 70—73.
CONCURRENCES
The City's Community Development Department has given this project a Notice of Exemption.
FISCAL IMPACT
Engineer's Estimate $66,840
Contingencies 6,680
Total Project Budget Needed $73,520
The current balance in the Water Distribution System Improvements project account is $1,007,952.
ATTACHMENTS
Available in the Council Reading File: Special Provisions for Utility Trench Repair Fall 2004
F:\GROUPS\PWORKS\ENGR\_Current Projects\Street Improvements\Trench Repair\90511 Utility Trench Repair Fall 2004\Documents\1-Staff
Reports\Council Agenda Report 11-04.doc