Loading...
HomeMy WebLinkAbout12/07/2004, C7 - UTILITY TRENCH REPAIR - FALL 2004 SPECIFICATION NO. 90511 council Ml�Meom-ber 7,2004 j aGenaa uepopt C I T Y OF SAN LUIS O B I S P O FROM: Jay D. Walter, Interim Director of Public Works #0 PREPARED BY: Gregory A. Walker, Project Coordinator SUBJECT: UTILITY TRENCH REPAIR—FALL 2004 SPECIFICATION NO. 90511 CAO RECOMMENDATION 1. Approve Specifications for"Utility Trench Repair Fall-2004,Specification No. 90511" 2. Authorize staff to advertise for bids. 3. Authorize the CAO to award the contract to the lowest responsible bidder within the engineer's estimate of$73,520. DISCUSSION Throughout the year, City Utilities Department staff make emergency repairs to water and sewer lines in the city street. At the time of repair, temporary asphalt patches are placed at the surface of the street where trenches have been dug. These temporary patches eventually need to be replaced with a stronger and more permanent asphalt patch. As the number of patches that need repair accumulates over time, it becomes economical to make these permanent repairs under a single contract. This project will repair 94 trenches throughout the City. A complete list of all locations is shown in the Special Provisions. This project is part of the Water Distribution System Improvements listed in the 2003-2005 Financial Plan,Appendix B pages 70—73. CONCURRENCES The City's Community Development Department has given this project a Notice of Exemption. FISCAL IMPACT Engineer's Estimate $66,840 Contingencies 6,680 Total Project Budget Needed $73,520 The current balance in the Water Distribution System Improvements project account is $1,007,952. ATTACHMENTS Available in the Council Reading File: Special Provisions for Utility Trench Repair Fall 2004 F:\GROUPS\PWORKS\ENGR\_Current Projects\Street Improvements\Trench Repair\90511 Utility Trench Repair Fall 2004\Documents\1-Staff Reports\Council Agenda Report 11-04.doc