HomeMy WebLinkAbout03/15/2005, C3 - SOUTH HIGUERA SEWER LINER, SPECIFICATION NO. 90247 council M.°,°01,1110, j ac cn da Report CITY O F SAN LUI S O B I S P O FROM: Jay Walter, Director of Public Works Prepared By: Matthew Horn, Associate Engineer SUBJECT: SOUTH.HIGUERA SEWER LINER, SPECIFICATION NO. 90247 CAO RECOMMENDATION 1. Approve plans and specifications for"South Higuera Sewer Liner, Specification No. 90247". 2. Authorize staff to advertise for bids and authorize the CAO to award contract if lowest responsible bid is within available funding. DISCUSSION Replacement of sewage collection pipes is an ongoing program to replace aging and deteriorating infrastructure. This program has several objectives: 1) Ensure reliable removal of waste; 2) Reduce the need for emergency repairs; and 3) Reduce the need for preventive maintenance. Due to the large flows in the collection system in this area and the recent reconstruction of Higuera Street, lining of the existing sewer pipe is preferred over traditional open trench replacement methods. Scone The original project scope included the repair of existing sewage collection pipes from Madonna Road to Prado Road. Plans and specifications were prepared and a cost estimate was developed. The City has not lined a sewage collection pipe in many years and so does not have recent cost data with which to develop an engineer's estimate. Instead, staff contacted the pipeline manufactures' representatives and obtained and used their construction cost data. The engineer's estimate indicates that the project cost will be greater than the available funding. Staff has split the project into a base project, which would line the sewage collection pipe from Elks Lane to Prado Road (the worst section of the pipe), and an additive alternate, which would line the sewage collection pipe from Madonna to Elks Lane. If bids come in low enough, the additive alternate can be awarded. CONCURRENCES Community Development Department has granted a Notice of Exemption. FISCAL IMPACT The base project is estimated at$749,975. An additive alternative is estimated at up to $352,520. The project was budgeted for $750,000 in the second year of the 2003-05 Financial Plan. Currently, the Collection System Improvements account has a balance of about $861,000. C'3-/ South Higuera Sewer Liner,Specification No. 90247 Page 2 Base Project Construction $ 677,250 Contingencies $ 67,725 Printing and Testing $ 5,000 Base Project Total $ 749,975 Additive Alternate Construction $ 318,200 Contingencies $ 31,820 Testing $ 2,500 Additive Alternate Total $ 352,520 Total Project $ 1,102,495 The lowest responsive bidder will be determined based on the total base project bid, qualifications and submittal of required references. Awarding of the additive alternate will only occur if the base project, additive alternate, contingencies, and printing and testing costs are less than $750,000 or additional funding becomes available. ATTACHMENTS Attachment 1 - Location Map Plans and Specifications are available in the Council office for review. WA amort pojaal«�7 moth h*g a Ima�-aoamou\I,= rcp"\9oza7 cv mv.aoc �3' 2 1 ATTACHMENT 1 f . r m ' Project Site a d4 � : , w P WOE ®m V �3 -3