Loading...
HomeMy WebLinkAbout10/04/2005, C7 - POLYBUTYLENE SERVICE REPLACEMENT SPEC. NO. 90526 council °°sober 4.2005 aGEnaa nepoRt �N. C.7 CITY OF SAN LUIS OBISPO FROM: Jay Walter,Public Works Director Prepared By: Sergio Reyes SUBJECT: POLYBUTYLENE SERVICE REPLACEMENT SPEC. NO.. 90526 CAO RECOMMENDATION 1. Award a contract to and authorize the mayor to execute with, D-Kal Engineering in the amount of$512,497 for: Polybutylene Service Replacement Spec. No. 90526. 2, Approve transfer of $ 566,500 frorn the Polybutylene Replacement account to fund this project. DISCUSSION On August 16, 2005 the City Council approved the plans and specifications for the Polybutylene Service Replacement Spec. No. 90526 Project. The City has undertaken a systematic replacement project of water services made of this material, which after.being installed in the 1970's started to become brittle. The result was numerous service failures demanding significant staff time to repair. The City Council authorized the staff to advertise for bids and authorized the CAO to award the contract if the lowest responsible bid was within the Project's Budget. On September 13, 2005 bids were opened and the lowest responsible bid was $9,275 over the Engineer's Estimate of$503;222. This project was advertised before we experienced the increase in oil prices. Staff assumes the higher prices can be attributed to rising costs for asphalt. FISCAL IWACT The Polybutylene Service Replacement Program is funded at$250,000 per year. There is $742,500 in the Polybutylene Replacement account available to support this project.. Estimated Construction Cost is shown below: Construction: $ 512,497 10% Contingencies: 51 249 Total Construction: $ 563,746 Printing: $ 254 Materials Testing: --2,500 Estimated Project Cost: $ 566,500 Staff recommends transferring$566;500 to support this project. C7 ,( Polybutylene Service Replacements . ___Page_2 ATTACIIIVIENTS 1. Bid Summary 2. Contract E\-Council Agenda Rep=\2005 agenda reports\Engineering and Maintenance Services,(Lynch)\Capital Projects Design(Lynch)V0526 CAR Award.DOC ATTACHMENT 1 z W a � 0000ao C rl Vi K W C O G u] y U 0 0 0 0 o c m � � 0 0 0 0 0 0 a o q M N 9 c c FFp U ti N c m O o O o 0 U0 h N u � F Ual � C 0 0 0 0 0 0 0 0 0 0 0 0 C tV C vi C t� C O C C O C �D M T S V1 Q 0 0 m vi O n d U C - - � ,`o_ •oo 00 � c vi o v o 0 0 0 0 O F V N N F V N M M M N O' OC v z QA O O O O O O O O O O O O 9 Op N O G C ry O N C O O rV O N b O' I O N Q N � ID O zLu f F F z F C Q N M Q N M C=. G O• F F p> > cu m m m vt O m m ua m m z, H z 0� O u, O y $ c 0 � v K F- = c .c F m G. e c 3 Q G p a a 3 m ¢ 4' -C mu v !U u N La u u u u h LLI F_ p 0 U C6 - C-7 ,3 ATT.0 NT2 CITY OF SAN LUIS OBISPO CALIFORNIA AGREEMENT THIS AGREEMENT,made on this day of . 20_,by and between the City of San Luis Obispo, a municipal corporation and charter city,San Luis Obispo County,California(hereinafter called the Owner)and D-Kal Engineering,Inc.(hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF F WORK: .The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of POLYBUTYLENE SERVICE REPLACEMENT,SPEC NO.90526 in strict accordance with the plans and specifications therefor,including any and all Addenda,adopted by the Owner,in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials,tools, equipment, and services shall be furnished and said work performed and completed tinder the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful. performance of this Contract,subject to any additions or deductions as provided in the Contract Documents,the contract prices as follows: Item Item Unit of Estimated Item Price Total No. Measure Quantity (in figures) (in figures) 1. Replace 3/a Water Services EA 200 1288.00 $257,600.00 2. Replace 1"Water Services EA. 96 1327.00 $127,392.00 3. Replace 1 1/2"Water Services EA. 9 2100.00 $18,900.00 4. Replace 2"Water Services EA. 47 2215.00 $104,105.00 5. Water Service Abandonment EA. 5 900.00 $4,500.00 BID TOTAL: $512,497.00 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted,or of any extra work which the Contractor may be required to do,or respecting the size of any payment to the Contractor,during the performance of this Contract,said dispute shall be decided by the Owner and its decision shall be final,and conclusive. ARTICLE III,COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full,and if not attached,,as if hereto attached: 1. Notice to Bidders and information for bidders. 2. Standard Specifications,Engineering Standards and Special Provisions. C� ��f E"14 L MAH 2. Accepted Proposal: 4. Public Contract code Section 10285:1 Statement and 10162 Questionnaire. 5. Noncollusion Declaration. 6. Plans. 7. List of Subcontractors. 8. Agreement and Bonds. 9. Insurance Requirements and Forms. ARTICLE IV. It is f irther'expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said.Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith: IN wrrNE3S WHEREOF,the parties to these presents have hereunto set.their hands this year and date first above written. CITY OF SAN LUIS OBI_SPO, A Municipal Corporation David Fm-korner o,Mayor. APPROVED AS TO FORM: CONTRACTOR Io Lowell D-Kal.Engineering;Inc. City Attorney David Loughran -2 �-� =S