Loading...
HomeMy WebLinkAbout11/01/2005, CLR #1 - OCTOBER 27, 2005 MEETING OF THE NACIMIENTO PROJECT COMMISSION RECEIVED OCT 2 8 2005 illlilllllllllllll����llll������1 SLO CITY CLERK liaison Report sity of san Luis osispo DATE: October 28, 2005 TO: Council Colleagues FROM: Mayor David Romero SUBJECT: October 27, 2005 Meeting of the Nacimiento Project Commission The Nacimiento Project Commission met on October 27, 2005, to consider items related to the Nacimiento Pipeline project. We received an extensive report from John Hollenback, the Project Manager, and from representatives of Black and Veatch, the design engineers. Primary items of discussion at the meeting related to how to.deal with a number of parties which may be interested in joining the project: Heritage Ranch, Camp Roberts, Camp San Luis, Pismo Beach_, Arroyo Grande, Cayucos, and some smaller districts. Ultimately, additional partners will result in reduced costs for the current participants, but the downside is that additional environmental work will probably be required to serve them. We are also very cautious that additional participation will not delay the final product. The design engineers,Black& Veatch, are conducting an extensive review of pipe sizes compared to pumping costs to arrive at a cost effective design for the system with a potential savings of$15 to $20 million. They are also reviewing details of the alignment for the pipe, and believe they have found approximately $1.7 million in potential construction cost savings with their preliminary analysis.. The extensive primary engineering review will counteract the great increase in the cost of construction materials (asphalt, fuel,concrete, and steel), which has occurred during the past year and is intended to keep the project within budget. The commission is continuing to pursue both State and Federal grants to assist with the project costs. E9COUNC(L t CDD DIR RED FILE P CAO @ FIN DIR P ACRO E FIRE CHIEF MEETING AGENDA G ATTORNEY 11.PW DIR DA t 1 EM # k 1a,CLERK/ORIG i2l POLICE CHF ❑DEPT HEADS- E REC DIR 0 P/13 l-UTIL DIR E Zezz3aA,&E HR DIR