HomeMy WebLinkAbout05/02/2006, C7 - 2006 ARTERIAL STREET REPAIR, SPECIFICATION NO. 90543 council MndnDw May 2,2006 j agenda REpoRt 1�Numba�7 CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works' Prepared By: Daniel Van Beveren, Senior Civil Engineer SUBJECT: 2006 ARTERIAL STREET REPAIR, SPECIFICATION NO. 90543 CAO RECOMMENDATION 1. Approve plans and specifications for "2006 Arterial Street Repair Project, Specification No. 90543." 2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate of $440,000 including $36,000 for water system improvements and$14,000 for collection system improvements. 3. Approve transfer of$39,600 from the Water Distribution System Improvements Main Account and accelerate funding in the amount of $15,400 from the Collection System Improvements Main Account in 2006-07 to 2005-06 to fund this project. DISCUSSION The City's Pavement Management Plan (PMP) was adopted by the City Council in 1998. One of the key elements of the PMP is maintenance of Arterial Streets. The PMP recommends approximately one-third of the annual pavement maintenance funding for Arterial Streets. Due to budget cutbacks in 2003-05 which impacted thefunding of the pavement management program, the emphasis of the past two years' annual paving projects has been the maintenance of Local and Collector streets in paving areas 7 and 8. Maintenance of Arterial Streets during these past two years has been minimal, consisting primarily of pothole repairs and patchwork conducted by our Streets Maintenance crew. Despite the reduced overall pavement management budget, continued repairs to the Arterial Streets remains a top priority of the City's ongoing pavement management program. This project consists of the highest priority repairs to the City's Arterial Streets, and is consistent with the approved 2005-07 Financial Plan. The emphasis on this project is pavement repair as opposed to pavement maintenance. In other words, the repair locations included in the scope of this project have been selected based on immediate need of repair, and as a result of this approach, several of the repair locations are individual patches to the pavement surface. The intent of this approach is to stretch the current paving budget as much as possible so as to provide repairs to the greatest number of locations as possible. As is typical with any paving project, where existing water valves, sewer manholes and sewer cleanouts are located within the location of new paving, the utility boxes and covers will be upgraded to the current standards and reset to the new street surface after the paving work is completed. C7- / 2006 Arterial Street Repair Project,Specification No.90543 page 2 CONCURRENCES Community Development Department has given this project a categorical exemption. FISCAL IMPACT Street Reconstruction and Resurfacing is identified in the 2005-07 Financial Plan. Funding for this project is currently available in the General Fund and Water Fund. However, due to increased construction costs for Wastewater Collection projects year-to-date funding is not currently available in the 2005-06 Sewer Fund. Due to funding availability and the timing of this project, it is proposed that the project be allowed to move forward with the Wastewater Collections portion of funding coming from the 2006-07 budget. Based on the project timeline, it is likely that expenditures will occur after July Is'; in the 2006-07 fiscal year. Future sewer replacement CIP projects have been reprioritized to account for the revised budget availability in 2006-07. General Fund Water Collection Total Project Distribution Systems Engineer's Estimate: 390,000 36,000 14,000 440,000 10% Contingencies: 39,000 3,600 1,400 44,000 Total for Construction. $429,000 $39,600 $15,400 $484,000 Miscellaneous (printing): 1,000 Materials Testing: 5,000 Total Cost: $435,000 $39,600 $15,400 $490,000 Funds Available: $538,524', $39,600 $15;400 $593,524 ' Approximately $100,000 of these funds will remain available for Streets Maintenance Division expenses associated with street repair activities outside of the scope of this project. ATTACHMENTS Attachment I —Location Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Special Provisions i:Lrar reportsM06Acip190543 arterial street repai690543 adv.tloc { —1 mini f/V►'.t-;] r OFF rlrl� /. moi.�`. lk l,1\ ♦ / i� ♦11 cue oil 2" /���1 '�`` ♦ , Fye � i, ��� OF PROJECT LOCATIONS • J I ARTERIAL STREET PAVING PROJECT LOCATION , . • • • Specification No. 90543 ATTACHMENT 1 - PAGE 2 (;I ';II jowsom ( It ff� t I ; COOLLUM t 1 TORO LIMITS OF PAVING •,t Y,• 1 •YY = �Y o 6t Q i 4t1 TA FREEWAY I ' ' ONRAMP ( I LOOMIS Ju B LIMITS OF PAVING A mom ----- —--------- -- — ------- C �I������������IIIIIIIIIIIII�IIIII�i�II�����I I) ( III Cmyof ARTERIAL STREET PAVING j sm ilbs OBl Q SITES A, B, C C, 7_ EXHIBIT ATTACHMENT ] PAGE 3 . ` \ ■f - ! � OLD & \( « . \ �. . \ \ � MOIN *« »? \ \ A � f / > @_ \ g okT OF PAVING . j\ . . \ ■ . \ \\ } �� � > \� . . oA D . o . U .E q � aly or ARTERIAL STREET PAVING san� SITES D, E ��|s ��I 0 . EXHIBIT �'