Loading...
HomeMy WebLinkAbout05/16/2006, C4 - SAN LUIS DRIVE WATERLINE REPLACEMENT PROJECT, SPECIFICATION NO. 90235 i j . counat 7/16/2006 j agenda Repoat C CITY OF SAN LUI S O B I S P O FROM: Jay D. Walter, Director of Public Wor Prepared By: Matt Horn, Supervising1 Engineer m� SUBJECT: SAN LUIS DRIVE WATERLINE REPLACEMENT PROJECT, SPECIFICATION NO. 96235 CAO RECOMMENDATION 1. Approve the plans and specifications for the "San Luis Drive Waterline Replacement Project", Specification No. 90235. 2. Authorize Staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate. 3. Accelerate funding in the amount of $187,250 from the Distribution System Improvements Account in 2006-07 to 2005-06 in order to fund this project. DISCUSSION Replacement of water distribution pipes, mainlines and related facilities is an ongoing program to replace aging, substandard and deteriorating infrastructure. This program has three.objectives; 1) ensure reliable water services; 2) reduce the need for emergency repairs; and 3) enhance available fire flow. Based on priorities set by the Utilities Department, the waterlines in San Luis Drive neighborhood have been selected for replacement. The residences of the San Luis Drive neighborhood have waterlines and water meters located in backyard easements. Some of these waterlines are over 50 years old and present challenges for Staff during the course of maintenance, repair and meter reading. This project involves installation of new waterlines in San Luis Drive, Corralitos Avenue, Alisal Avenue, and Alta Street so that existing waterlines located in backyard easements can be abandoned. Water services and meters for thirty-eight of the properties must then be reinstalled'in the front or the side of the property and abandoned in the rear of the property. The location of each new water service has been researched and discussed with each property owner. Right of Entry agreements have been executed with all required homeowners. CONCURRENCES The Community Development Department has filed a Notice of Exemption for this project. FISCAL IMPACT This project is identified in the 2003-05 Financial Plan Appendix B. Due to increased construction costs for Water Distribution projects year-to-date and the timing of this project, full Cy-/ Council Agenda Report—San Luis Drive Waterline Replacement Page 2 funding is not currently available in 2005-06. This project will be funded from the Distribution System Improvement Account, which has a current balance of$990,000 and it is proposed that the project be allowed to move forward with $187,250 in funding accelerated from the 2006-07 budget. Based on the project timeline, with the construction bid award tentatively scheduled for June 29, 2006, it is likely that expenditures will occur after July 1St; in the 2006-07 fiscal year. Future water distribution projects have been reprioritized to account for the revised budget availability in 2006-07. Engineer's Estimate: Construction Costs $ 1,015,000 Construction Contingencies $ 152,250 Materials Testing $ 10,000 Total $ 1,177,250 Typical Capital Improvement Plan projects construction contingency amounts are 10% of the engineer's estimate.. Construction contingencies for this project are requested at 15% due to the increased likelihood of unforeseen conditions and the increased difficulty working on private property. Additionally, portions of the asbestos-cement waterline intended to be replaced with this project where unable to be located. Public Works potholed the area as well as used ground penetrating radar in an attempt to discover the actual location of the waterline without.success. Plans were prepared using record information so some redesign to fit actual built waterline locations is expected. ATTACHMENTS 1. Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE 1. Plans and Specifications lA_CAR Reports\2006\CIP\90235 SL Drive Waterline\90235 SL Drive Waterline Approve.doc Cy- 2. i ATTACHMENTI Coo WILSON ABBOTT W'oy� GARFIELD �J�9 st- ACH, Q 5 F� -CO `o s Cl) 6 O C,y2gO�RD 6 P 5P Q v T l by sot S� Project Site i1 I r � Cl Of VICINITY MAP WATERLINE IMPROVEMENT PROJECT Shc'1 WIS OBISPO SPEC. NO. 90235 4y-3