HomeMy WebLinkAbout06/06/2006, C8 - PREFUMO CREEK SILT REMOVAL, SPECIFICATION NO. 90581 council. '�°�� June 6, 2006 acEnba wpoRt ,�K.,ba C CITY O F SAN LUIS O B I S P O FROM: Jay D. Walter,Public Works Direct !� Prepared by: Daniel Van Beveren, for Civil Engineef� SUBJECT: PREFUMO CREEK SILT REMOVAL, SPECIFICATION NO. 90581 CAO RECOMMENDATION: 1. Approve plans and specifications for "PREFUMO CREEK SILT REMOVAL, SPECIFICATION NO. 90581". 2. Authorize staff to advertise for bids. 3. Authorize the CAO to award the construction contract if the lowest acceptable bid is within the engineer's estimate of$60,000. DISCUSSION The portion of Prefumo Creek between Los Osos Valley Road and Laguna Lake is a location where the creek slope flattens, flow velocity decreases, and sedimentation accumulates as the water in the creek slows down prior to entering Laguna Lake. Sedimentation is removed from this location every few years in order to maintain the capacity of.the creek channel and to help prevent the accumulated sediment from migrating into the lake. This sediment removal work was last done in 2002. Currently there exists approximately the same amount of sediment in this location as existed prior to the 2002 sediment removal project. If this work is not periodically carried out, sedimentation will continue to accumulate and result in the decreased capacity of the creek channel and an increase in the rate at which Laguna Lake is currently being filled with sediment. The sediment material removed is granular;containing-a large amount of gravel and sand; and has been found to be a useful as a structural fill material. After removing the sediment from the project site, the contractor will transport the material to another location where it can be of beneficial use. CONCURRENCES This project has received a Mitigated Negative Declaration and a grading permit from the City's Community Development Department, a Water Quality Certification from the Regional Water Quality Control Board, as well as a permit from the Army Corps of Engineers. Covered under the jurisdiction of the Army Corps of Engineers' permit are supporting statements from both the National Marine Fisheries and Fish and Wildlife Services. The project plans as proposed for approval are consistent with the "requirements of the City's Mitigated Negative Declaration and the terms of the various permits received: N i Council Agenda Report—Prefumo Creek Silt Removal,Spec.#90581 Page 2 This project is subject to approval by the State Department of Fish and Game. A permit has been applied for and is still pending. Work will not begin on this project until the permit has been received. FISCAL IMPACT Prefumo Creek Silt Removal is identified in the 2005-07 Financial Plan. Total Project Budget $80,000 Project Costs to Date (survey work) -$10,550 Remaining Project Budget $69,450 Construction Costs Engineer's Estimate: 60,000 10% Contingencies: +6,000 Total for Construction: $66,000 Miscellaneous project costs (printing, mailing, etc.) +3,000 Total: $69,000 Current Balance in Project Account: $69,450 ATTACHMENTS: 1. Project Location Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE 1. Project Special Provisions 2. Initial Study/Notice of Determination i:Lcar repons120061d;1\90581 prefumo creek sift remova*0581•adv.doc C9 - ATTACHMENT #1 ....... ....... _._.. I i i i <o S 0 PjROJECT L OCA TION mo I V Al o oSIlk DSU 9�gy �pP4 o� epb lU ' 51 r \/ I CT. A 0 250 500 _ - _750 1000 . ......... METERS .... ............�1._.__..... C of PREFUMO CREEK SILT REMOVAL San lu,S omeapo PROJECT LOCATION MAP ❑ .'' -