Loading...
HomeMy WebLinkAbout09/19/2006, C2 - TRENCH REPAIR FALL 2006, SPECIFICATION NO. 90641 council Sept 19,2006 ac,Enaa nEpoizt CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works Prepared By: Jennifer Lawrence, Engineering Technician SUBJECT: TRENCH REPAIR FALL 2006, SPECIFICATION NO. 90641 CAO RECOMMENDATION 1. Approve plans and specifications for"Trench Repair Fall 2006, Specification No. 90641." 2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate of$115,648. DISCUSSION Throughout the year, City Utilities Department staff make emergency repairs to pipelines in City streets. Once these repairs are made,.the trenches are backfilled and temporary asphalt patches are placed at the surface of the street. These temporary patches eventually need to be replaced with a stronger and more permanent asphalt patch. The Public Works Department accumulates a list of the temporary patch locations from the Utilities Department and issues a construction contract periodically to make the permanent repairs. This project will repair approximately 79 trenches and one meter of curb and gutter throughout the City. A complete plan of all locations is included in the Special Provisions. CONCURRENCES The Community Development Department has given this project a categorical exemption from environmental review. FISCAL IMPACT The 2005-07 Financial Plan, Appendix B, pages 79-81, estimates an annual cost of $100,000 from Water Distribution to support Utility Trench Repair projects. Due to rising oil prices and construction costs, as well as a greater total surface area to be repaired, the engineer's estimate was higher on this project than previous years. Additionally, a 12% contingency was used to account for undetermined trench degradation which may increase the required repair area and/or undocumented repairs deemed critical to complete before next Utility Trench Repair project. The last trench repair project was completed early 2006 in which approximately 110 trenches were repaired. $19,000 was saved during that project which is available as an additional source of funding for the Trench Repair Fall 2006 project. The remaining funding for the project will come from the Water Distribution System Improvements account which has an available balance of$1,488,082. Trench.Repair 2006 Page 2 Engineer's Estimate: $115,648 12% Contingencies: $13,878 Total for Construction: $129,526 Miscellaneous (incl. printing): $350 Total Project Cost: $129,876 Available Funding $1,488,082 Total Project Cost ($129,876) Remaining Balance $1,358,206 AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Special Provisions gMaN•reportrependasi nutaaLm12OOftp190641 Uerxh repair 1a112006%906d1 adv.doc �z -2