HomeMy WebLinkAbout04/03/2007, C2 - TRAFFIC SIGNAL INSTALLATION JOHNSON & ELLA, SPECIFICATION NO. 90574 COUncit Mame Det April 3.2007 j acEnaa REpont 1�N..6. G2 CITY OF SAN LU I S O B 1 S P O FROM: Jay D. Walter, Director of Public Works Prepared By: Jake Hudson, Engineer II5�_ SUBJECT: TRAFFIC SIGNAL INSTALLATION JOHNSON & ELLA, SPECIFICATION NO. 90574 CAO RECOMMENDATION 1. Approve plans and specifications for the "Traffic Signal Installation at Johnson & Ella, Specification No. 90574." 2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate of$200,000. 3. Appropriate$56,000 to the project from the Transportation Impact Fee Fund balance. 4. Authorize the transfer of $15,000 from the design phase account to the construction phase account. DISCUSSION Signalization of Johnson & Ella was identified based on a future needs assessment considering the development of the Del Rio Terrace Apartments and Tract 2570 (Fixlini Tract). During the application period for each of these developments the Public Works Director negotiated a $50,000 contribution by the Del Rio Terrace Apartments and a $100,000 contribution by Tract 2570 for the design and construction of the Johnson & Ella Traffic Signal. The signal plans and specifications are now complete and ready for bid. Due to increasing construction costs the budget for the project shown in the 2005-07 Financial Plan is not expected to cover the full cost of the project. FISCAL IMPACT This project is identified in the 2005-07 Financial Plan (page E-8) and Appendix B (pages 172 and 173) where $165,000 is allocated for use on this project; $50,000 from the Del Rio Terrace Apartments Contribution, $100,000 from the Tract 2570 contribution, and $15,000 from the Transportation Impact Fee (TIF) fund. Of this $15,000 is designated for design and $150,000 for construction. Due to significant increases in construction costs (particularly for steel) and the current bidding environment, the engineers estimate is now higher than when the project was originally scoped and budgeted. To reduce costs, design was completed in-house and the$15,000 allocated for design is available for construction. Staff recommends transferring that $15,000 from the design phase account to the construction phase account. This leaves a funding gap of $56,000 necessary to complete the project. Staff is recommending allocating the additional $56,000 from the TIF fund balance. If the final project cost is below the new project total, remaining funds will be returned to the TIF fund balance. Traffic Signal Installation Johnson &Ella, Specification No. 90574 Page 2 2005-07 Transportation New Project Financial Plan Impact Fee Budget Engineer's Estimate: $165,000 NA $200,000 Design Allocation: $15,000 $0 $0 Construction Allocation: $150,000 $35,650 $200,650 10% Contingencies: $0 $20,000 $20,000 Project Total: $165,000 $55,650 $220,650 Miscellaneous (printing): $0 $350 $350 Total Cost: $165,000 $56,000 $221,000 Funds Available: $165,000 $56,000 $221,000 The 2006-07 mid-year budget review shows a projected TIF balance of$1,388,700 at the end of 2006-07 accordingly, adequate resources are available to fund the proposed budget amendment. ALTERNATIVES The Council may wish to defer construction until a later date. However, staff anticipates costs will only continue to increase over time. If the project does not proceed, traffic operations are likely to continue to degrade at this location resulting in increased traffic congestion and safety issues. ATTACHMENTS Project Plans and specifications are available in the Council reading file. g:�staff-Mort agendas-minuted car120071oensportadonWt f 680574 eW.00c