Loading...
HomeMy WebLinkAbout04/03/2007, C4 - MID HIGUERA WIDENING, SPECIFICATION NO. 90073B AMENDMENT #3 TO ENVIRONMENTAL SERVICES CONTRACT O • councit M"fin D�4/3/2007 j acEnba RepoRt C CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works Prepared By: Daniel Van Beveren, Sem Civil Engineer-3�1� SUBJECT: MID HIGUERA WIDENING, SPECIFICATION NO. 90073B AMENDMENT#3 TO ENVIRONMENTAL SERVICES CONTRACT CAO RECOMMENDATION Approve and execute Amendment No. 3 to the Agreement to Furnish Environmental Services for the Mid-Higuera Widening Project, Specification No. 90073B, in the amount of: $32,935 with Morro Group, Inc. DISCUSSION The Mid Higuera Widening project involves the widening of Higuera Street from Marsh Street to High Street. Cal Trans is the agency in charge of processing the National Environmental Policy Act (NEPA) approval of this project, and in 2003, requested several technical reports necessary for this environmental clearance. The City then contracted with Morro Group, Inc., a local environmental consultant, to complete these technical reports. The current agreement with Monro Group consists of the original contract awarded by Council on November 5, 2003, with two amendments to the contract amendment which were approved in 2004 and 2005. All of the technical reports originally requested were completed and submitted to Cal Trans for approval in 2005. All of these reports have now been approved with the exception of the Archaeological Survey Report. The Archaeological Survey Report submitted in 2005 included a general overview of the entire project location and identified the potential for archaeological artifacts or other similar items to be present within the area of potential disturbance for the proposed street widening. This potential presence of artifacts was specifically identified for two properties which are located at 292 and 296 Higuera. Both of these two properties currently contain older, craftsman style homes and have the same owner. Based on the conclusions of the 2005 Archaeological Survey Report, the City was required to perform a follow up study known as an Extended Phase I Archaeological Survey. The scope of that report was approved by CalTrans and included the excavation of several "test pits" located within City Right-of-Way immediately adjacent to the two properties located at 292 and 296 Higuera. The review of that report by CalTrans has now resulted in the need to perform yet another follow up study also known as an Extended Phase I Archaeological Survey. This study will also include several "test pits", but the area of testing will be on the private property at 292 and 296 Higuera. Because this area of proposed testing is located on private property, the City was required to get the authorization of the property owner in order to perform the testing. This permission has now been granted and is in the form of a Right of Entry agreement between the City and the property c y-i O Council Agenda Report—Mid 13iguera Environmental Services—Contract Amendment#3 Page 2 owner. With this agreement now in place, we can proceed with the on-site work. Morro Group has submitted a proposal to perform the Extended Phase I Archaeological Survey at a cost of $32,935. FISCAL IMPACT There is $300,000 budgeted for the environmental review phase of this project. Of that amount, $144,500 is still available. This amendment would increase Morro Group's contract amount by $32,935 for a total contract value of$162,317. ATTACHMENTS Amendment #3, including proposal from Morro Group for Extended Phase I Archaeological Survey as Exhibit A G:\Staff-Reports-Agendas-Minutes\_CAR\2007\CIP\90073 Mid Higuera Widening\CAR 90073 Mid Higuera Env Services Contract Amendment #3.doc ATrACI+M P,nrT 0 CAGE I Amendment No. 3 To the Agreement to Furnish Environmental Services For the Mid Higuera Widening Under Specification No.90073B 1. The scope of work for the agreement between the City of San Luis Obispo and MORRO GROUP, INC. dated December 2, 2003 shall be amended to include the following task: a. Extended Phase I Archaeological Survey This additional task represents a cost increase of the Environmental Services Contract in the amount of$32,935 including contingencies,per a proposal dated February 20, 2007 from MORRO GROUP, INC.,which is incorporated into this amendment by reference. 2. All other terms and conditions of the agreement shall remain in full force and effect. For the City of San Luis Obispo: For MORRO GROUP INC.: City Administrative Officer date date Approved as to Form: ity omey A?TACT FMEn� O,Ue 2 AECEIVED = r FEB 2 1 2007 February 20, 2007 CITY OF SAN LUIS OBISPO PUBLIC WORKS DEPARTMENT_ mom Mr. Dan VanBeverenm Public Works DepartmentGwupmc City of San Luis Obispo 955 Morro Street Environmental Services San Luis Obispo, CA 93401 SUBJECT: Request for Additional Funds:Mid-Higuera Street Widening Project to Prepare Extended Phase I Survey at Archaeological Site CA-SLO-2423 Dear Dan: Garcia and Associates (GANDA) requests additional funds to complete the Extended Phase 1 Cultural Resources Studies for the Mid-Higuera Project at Archaeological Site CA-SLO-2423. This site was identified during the cultural resources inventory of the Mid-Higuera Street Widening project in 2004. The purpose of the survey will be to delineate the boundaries of the site so a determination can be made if the proposed project would impact the resource. The budget given to Morro Group by GANDA to complete the work effort is attached. GANDA is requesting an additional time and materials budget not to exceed $32,935 for this work effort. The Extended Phase 1 survey proposal currently is being reviewed by Kelda Wilson of Caltrans. Once she has approved the proposal, GANDA can proceed with the survey. The survey includes up to twenty (20) shovel test pits (STPs). They will only charge for the STPs that are necessary to delineate the boundaries of CA-SLO-2423. This.request will be third amendment request to the original contract. Currently, Morro Group has about $34,000 left in our budget for the project. This amount is being reserved to complete any changes requested by Caltrans on any of the reports submitted for the project, the completion of the ASR and HPSR, CEQA determination, attendance at public hearings on the project, and printing. Please feel free to call me if you have any questions regarding the request for additional funds. Sincerely, Mom GRour,Ixc. Mary B. R� nts President 111 �y y 1422 MOivrEREr STREET,Stns C200 • SAN Luis OB[SPo,CA 93401 • (805)543-7095 • FAX 543-2367 477AC H H ENT 0 �raE 3 Budget for'XP1 Studies at CASLO.2423 Date: 224an-07 Mid-Higuera Road 41ildening Project,609713 Prepared by:C.Denardo Prepared for.Morro Group for the City of San Luis Obispo PM Sign-off.. ' (Wtials.date) LABOR(hours) . TASK TASK TASK TASK TASK TOTAL 1 2 3 d M TECHNICAL STAFF PERSONNEL PM V-Principal Scientist JCG 1.0 1.0 PM N-Assodate PMeipal Scientist 0.0 PM III-Senior Scientist 0.0 PM 11'-Environmental Scientist 0.0 SS V-Spedaw V CD 2.0 4.0 16.0 20.0 4.0 46.0 SS IV-Spedalht IV 0.0 SS III-Spedarist 111 ST.NA Monitor 2.0 92.0 16.0 40.0 150.0 SS II-specww 11 KF,ML,M 16. H,AM 2.0 180.0 40.0 0 238.0 SS I-Specialist 1 0.0 0.0 SUPPORT STAFF 0.0 0.0 Librarian 0.0 GRA II-Graphics Supervisor RS. 6.0 6.0 GRA 1-Graphics Aril - 0.0 GIS 11-GIS Specialist TB,CK 4.0 4.0 GIS 1-GIS Tedmician BG- 0.0 WP IV-Sr.Tedurital EcMN CTG 3.0 3.0 WP III-Jr.Technical Erftar 0.0 WP II-ward Processor - 0.0 WP I-Clerical BG,GT,PD 0.0 CA III-Contract AdmWstrator CTG 2.0 2.0 CA II-ContradAssiatartl GF 2.0 2.0 CA I-BIObM Cleric EF 2.0 2.0 TOTAL LABOR HOURS 6.0 276.0 72.0 86.0 14.0 454.0 LABOR(Cast) RATEIHM TECHNICAL STAFF . PM V-Principal Sdentist $155 s0 -$0 $0 $0 $155 $155 PM rV-Assodate Principal Scientist $725 $0 $0 $0 $0 $0 $0 PM III.Senior SderNst $115 $0 $0 $0 $0 $0 s0 PM II-Envbwmmntul SdentW $95 s0 $0 $0 s0 s0 $O SSV-SpedaOstV $84 $168 $336 $1.344 $1.680 $336 $3.864 SS rV-SpedaRst rV S71 s0 $0 $0 s0 $0 s0 SS til-Spedaust III $61 $122 $5,612 $976 $2,440 $0 $9,150 SS ti-Specialist 11 $51 $102 $9,180 $2,040 5816 s0 $12,138 SS I-Spedeam I $42 $0 $0 $0 so $0 $0 SUPPORT STAFF Librarian ' $42 $0 $0 $0 $0 $0 $0 GRA II-Graphs Supervisor S53 $0 s0 $0 $318 s0 S318 GRA I-Graphics ANst $40 $0 so $0 $0 s0 $0 GIS 11-GIS SpeckRst $67 $0 $0 $0 $268 $0 $268 GIS I-GIS Teduddan $50 $0 $0 $0 $0 $0 $0 WP IV-Sr.Tedmiral Editor $80 $0 so so $0 $240 $240 WP III-Jr.Technical Editor $60 $0 s0 $0 $0 s0 $0 WP II-Word Processor $52 $0 $0 $0 $0 s0 $0 wP I-Ci dieal $50 s0 $0 $0 $0 $0 s0 CA III-Contract Administrator $85 $0 $0 $0 $0 $170 $170 CA II-Contract Assistant $62 $0 $0 s0 s0 $124 $124 CA I-Billing Clerk $50 s0 s0 s0 $0 $100 $100 TOTAL LABOR COST $392 $15,128 $4,360 $51522 $1;125 $28,527 SUBCONTRACTORS: None $0.00 $0.00 G&A Handfirta on Subs .. _:.10.00%'' $0.00 $0 00 $0 00 $000 $000 $000 SUBCONTRACTOR TOTAL COST: $0 so $0 $0 $0 So Mid-Higuera XP1 Proposal-2007-1.122/2007 Page 1 of 2 ATTACH HENT O i PAGE 4- TAM TASK TASK TASK TASK TOTAL 1 2 3 4 M OTHER DIRECT COSTS Rate "am Equipment GANDA Vehicle Use(Field Teak) $501 day 350 $350 GANDA Vehicle(2)0nonfleld usage) $351 day $o Suburban $100/day to GANDA Vehicle Fuel,etc.. $025/mile $0 17$. Boston Whaler $100/day $0 244L Farallon Boal $2SYday+fuel $0 ATV $35/day, $0 Snowmobile $501day $0 Camas $201day $0 Electric Motor(for canoe) $101day $0 Inflatable:Kayak $601day $0 Diving Gear $751day $0 wet suits $101day $0 Archaeological Field Equipment(screens,shovels) $10/day $0 Olympus Fiber Optic Scope $100/day $0 Sandpiper Peeper Probe $66/day $0 SOII&Video Cameras $5/day $0 Digital Camara $2-501day $0 GPS Receiver with 1-3 an accuracy $45/day 225 5225 IPAO Pocket PCs $14.50/day $0 Gamrht and Etrax hard-held navigational devices $1.501day $0 Cellularphew $7.50/day 38 $38 . Copies(@$0.10fC y) $0.10/page 50 $50 Graphics Workstation $2.50/hr 15 '.$15 GIS workstation $7.00Bd 28 528 8x11 color copies $1/pege $0 11x17 color copies $2/page 20 $20 &n House Equlpmerd Subtotal: $0 $663 $43 $20 $0 $726 Relmbursables. Personal Vehicle Mileage 0.485 400 $400 PerDiem U.S.Gov rate 2,100 $2,100 Records Search at cost $0 Curmon at cost 2,000 $2,000 Maps(7.5'quads) Est.$8 per at cost $0 Phone/Fox/Postage at Cost 50 50 50 50 50 $250 Mise. SuppBes/FOm Processing at cost 150 200 $350 Rembursables Subtotat, $50 $2,700 $4250 $50 $50 $5100 SUBTOTAL ODCs $50 $3,363 $2,293 $70 $50- $5,826 Fee on OOCsr, 10.00% $5 $336 $229 $7 $5 $583 TOTAL ODCs $55 $3,699 $2,522 $77 $55 $6,408 TOTAL PROJECT COST - $447 $18,827 $6,882 $5,599 $1,180 $32,935 TASK DETAIL Task 1:PreWd Coordination and Mobilization Task 2:Field Task 3:Report Preparation&Review 2007 INTx CULT RACK RATES Budget Task M:PmJW Management Mid-Higuera XPi Proposal-2007-1,1/222007 A• Page 2 of 2