HomeMy WebLinkAbout04/03/2007, C4 - MID HIGUERA WIDENING, SPECIFICATION NO. 90073B AMENDMENT #3 TO ENVIRONMENTAL SERVICES CONTRACT O •
councit M"fin D�4/3/2007
j acEnba RepoRt C
CITY OF SAN LUIS OBISPO
FROM: Jay D. Walter, Director of Public Works
Prepared By: Daniel Van Beveren, Sem Civil Engineer-3�1�
SUBJECT: MID HIGUERA WIDENING, SPECIFICATION NO. 90073B
AMENDMENT#3 TO ENVIRONMENTAL SERVICES CONTRACT
CAO RECOMMENDATION
Approve and execute Amendment No. 3 to the Agreement to Furnish Environmental Services for
the Mid-Higuera Widening Project, Specification No. 90073B, in the amount of: $32,935 with
Morro Group, Inc.
DISCUSSION
The Mid Higuera Widening project involves the widening of Higuera Street from Marsh Street to
High Street. Cal Trans is the agency in charge of processing the National Environmental Policy
Act (NEPA) approval of this project, and in 2003, requested several technical reports necessary
for this environmental clearance. The City then contracted with Morro Group, Inc., a local
environmental consultant, to complete these technical reports. The current agreement with
Monro Group consists of the original contract awarded by Council on November 5, 2003, with
two amendments to the contract amendment which were approved in 2004 and 2005. All of the
technical reports originally requested were completed and submitted to Cal Trans for approval in
2005. All of these reports have now been approved with the exception of the Archaeological
Survey Report.
The Archaeological Survey Report submitted in 2005 included a general overview of the entire
project location and identified the potential for archaeological artifacts or other similar items to
be present within the area of potential disturbance for the proposed street widening. This
potential presence of artifacts was specifically identified for two properties which are located at
292 and 296 Higuera. Both of these two properties currently contain older, craftsman style
homes and have the same owner.
Based on the conclusions of the 2005 Archaeological Survey Report, the City was required to
perform a follow up study known as an Extended Phase I Archaeological Survey. The scope of
that report was approved by CalTrans and included the excavation of several "test pits" located
within City Right-of-Way immediately adjacent to the two properties located at 292 and 296
Higuera. The review of that report by CalTrans has now resulted in the need to perform yet
another follow up study also known as an Extended Phase I Archaeological Survey. This study
will also include several "test pits", but the area of testing will be on the private property at 292
and 296 Higuera.
Because this area of proposed testing is located on private property, the City was required to get
the authorization of the property owner in order to perform the testing. This permission has now
been granted and is in the form of a Right of Entry agreement between the City and the property
c y-i
O
Council Agenda Report—Mid 13iguera Environmental Services—Contract Amendment#3
Page 2
owner. With this agreement now in place, we can proceed with the on-site work. Morro Group
has submitted a proposal to perform the Extended Phase I Archaeological Survey at a cost of
$32,935.
FISCAL IMPACT
There is $300,000 budgeted for the environmental review phase of this project. Of that amount,
$144,500 is still available. This amendment would increase Morro Group's contract amount by
$32,935 for a total contract value of$162,317.
ATTACHMENTS
Amendment #3, including proposal from Morro Group for Extended Phase I Archaeological
Survey as Exhibit A
G:\Staff-Reports-Agendas-Minutes\_CAR\2007\CIP\90073 Mid Higuera Widening\CAR 90073 Mid Higuera Env Services Contract Amendment
#3.doc
ATrACI+M P,nrT
0 CAGE I
Amendment No. 3
To the Agreement to Furnish Environmental Services
For the Mid Higuera Widening
Under Specification No.90073B
1. The scope of work for the agreement between the City of San Luis Obispo and
MORRO GROUP, INC. dated December 2, 2003 shall be amended to include the
following task:
a. Extended Phase I Archaeological Survey
This additional task represents a cost increase of the Environmental Services Contract
in the amount of$32,935 including contingencies,per a proposal dated February 20,
2007 from MORRO GROUP, INC.,which is incorporated into this amendment by
reference.
2. All other terms and conditions of the agreement shall remain in full force and effect.
For the City of San Luis Obispo: For MORRO GROUP INC.:
City Administrative Officer date date
Approved as to Form:
ity omey
A?TACT FMEn�
O,Ue 2
AECEIVED =
r
FEB 2 1 2007
February 20, 2007
CITY OF SAN LUIS OBISPO
PUBLIC WORKS DEPARTMENT_ mom Mr. Dan VanBeverenm
Public Works DepartmentGwupmc
City of San Luis Obispo
955 Morro Street Environmental Services
San Luis Obispo, CA 93401
SUBJECT: Request for Additional Funds:Mid-Higuera Street Widening Project to Prepare
Extended Phase I Survey at Archaeological Site CA-SLO-2423
Dear Dan:
Garcia and Associates (GANDA) requests additional funds to complete the Extended Phase 1
Cultural Resources Studies for the Mid-Higuera Project at Archaeological Site CA-SLO-2423.
This site was identified during the cultural resources inventory of the Mid-Higuera Street
Widening project in 2004. The purpose of the survey will be to delineate the boundaries of the
site so a determination can be made if the proposed project would impact the resource.
The budget given to Morro Group by GANDA to complete the work effort is attached. GANDA
is requesting an additional time and materials budget not to exceed $32,935 for this work effort.
The Extended Phase 1 survey proposal currently is being reviewed by Kelda Wilson of Caltrans.
Once she has approved the proposal, GANDA can proceed with the survey. The survey includes
up to twenty (20) shovel test pits (STPs). They will only charge for the STPs that are necessary
to delineate the boundaries of CA-SLO-2423. This.request will be third amendment request to
the original contract.
Currently, Morro Group has about $34,000 left in our budget for the project. This amount is
being reserved to complete any changes requested by Caltrans on any of the reports submitted
for the project, the completion of the ASR and HPSR, CEQA determination, attendance at public
hearings on the project, and printing.
Please feel free to call me if you have any questions regarding the request for additional funds.
Sincerely,
Mom GRour,Ixc.
Mary B. R� nts
President 111
�y y
1422 MOivrEREr STREET,Stns C200 • SAN Luis OB[SPo,CA 93401 • (805)543-7095 • FAX 543-2367
477AC H H ENT
0 �raE 3
Budget for'XP1 Studies at CASLO.2423 Date: 224an-07
Mid-Higuera Road 41ildening Project,609713
Prepared by:C.Denardo
Prepared for.Morro Group for the City of San Luis Obispo PM Sign-off..
' (Wtials.date)
LABOR(hours) .
TASK TASK TASK TASK TASK TOTAL
1 2 3 d M
TECHNICAL STAFF PERSONNEL
PM V-Principal Scientist JCG 1.0 1.0
PM N-Assodate PMeipal Scientist 0.0
PM III-Senior Scientist 0.0
PM 11'-Environmental Scientist 0.0
SS V-Spedaw V CD 2.0 4.0 16.0 20.0 4.0 46.0
SS IV-Spedalht IV 0.0
SS III-Spedarist 111 ST.NA Monitor 2.0 92.0 16.0 40.0 150.0
SS II-specww 11 KF,ML,M 16.
H,AM 2.0 180.0 40.0 0 238.0
SS I-Specialist 1
0.0
0.0
SUPPORT STAFF 0.0
0.0
Librarian 0.0
GRA II-Graphics Supervisor RS. 6.0 6.0
GRA 1-Graphics Aril - 0.0
GIS 11-GIS Specialist TB,CK 4.0 4.0
GIS 1-GIS Tedmician BG- 0.0
WP IV-Sr.Tedurital EcMN CTG 3.0 3.0
WP III-Jr.Technical Erftar 0.0
WP II-ward Processor - 0.0
WP I-Clerical BG,GT,PD 0.0
CA III-Contract AdmWstrator CTG 2.0 2.0
CA II-ContradAssiatartl GF 2.0 2.0
CA I-BIObM Cleric EF 2.0 2.0
TOTAL LABOR HOURS 6.0 276.0 72.0 86.0 14.0 454.0
LABOR(Cast) RATEIHM
TECHNICAL STAFF
. PM V-Principal Sdentist $155 s0 -$0 $0 $0 $155 $155
PM rV-Assodate Principal Scientist $725 $0 $0 $0 $0 $0 $0
PM III.Senior SderNst $115 $0 $0 $0 $0 $0 s0
PM II-Envbwmmntul SdentW $95 s0 $0 $0 s0 s0 $O
SSV-SpedaOstV $84 $168 $336 $1.344 $1.680 $336 $3.864
SS rV-SpedaRst rV S71 s0 $0 $0 s0 $0 s0
SS til-Spedaust III $61 $122 $5,612 $976 $2,440 $0 $9,150
SS ti-Specialist 11 $51 $102 $9,180 $2,040 5816 s0 $12,138
SS I-Spedeam I $42 $0 $0 $0 so $0 $0
SUPPORT STAFF
Librarian ' $42 $0 $0 $0 $0 $0 $0
GRA II-Graphs Supervisor S53 $0 s0 $0 $318 s0 S318
GRA I-Graphics ANst $40 $0 so $0 $0 s0 $0
GIS 11-GIS SpeckRst $67 $0 $0 $0 $268 $0 $268
GIS I-GIS Teduddan $50 $0 $0 $0 $0 $0 $0
WP IV-Sr.Tedmiral Editor $80 $0 so so $0 $240 $240
WP III-Jr.Technical Editor $60 $0 s0 $0 $0 s0 $0
WP II-Word Processor $52 $0 $0 $0 $0 s0 $0
wP I-Ci dieal $50 s0 $0 $0 $0 $0 s0
CA III-Contract Administrator $85 $0 $0 $0 $0 $170 $170
CA II-Contract Assistant $62 $0 $0 s0 s0 $124 $124
CA I-Billing Clerk $50 s0 s0 s0 $0 $100 $100
TOTAL LABOR COST $392 $15,128 $4,360 $51522 $1;125 $28,527
SUBCONTRACTORS:
None
$0.00
$0.00
G&A Handfirta on Subs .. _:.10.00%'' $0.00 $0 00 $0 00 $000 $000 $000
SUBCONTRACTOR TOTAL COST: $0 so $0 $0 $0 So
Mid-Higuera XP1 Proposal-2007-1.122/2007 Page 1 of 2
ATTACH HENT
O i PAGE 4-
TAM TASK TASK TASK TASK TOTAL
1 2 3 4 M
OTHER DIRECT COSTS Rate
"am Equipment
GANDA Vehicle Use(Field Teak) $501 day 350 $350
GANDA Vehicle(2)0nonfleld usage) $351 day $o
Suburban $100/day to
GANDA Vehicle Fuel,etc.. $025/mile $0
17$. Boston Whaler $100/day $0
244L Farallon Boal $2SYday+fuel $0
ATV $35/day, $0
Snowmobile $501day $0
Camas $201day $0
Electric Motor(for canoe) $101day $0
Inflatable:Kayak $601day $0
Diving Gear $751day $0
wet suits $101day $0
Archaeological Field Equipment(screens,shovels) $10/day $0
Olympus Fiber Optic Scope $100/day $0
Sandpiper Peeper Probe $66/day $0
SOII&Video Cameras $5/day $0
Digital Camara $2-501day $0
GPS Receiver with 1-3 an accuracy $45/day 225 5225
IPAO Pocket PCs $14.50/day $0
Gamrht and Etrax hard-held navigational devices $1.501day $0
Cellularphew $7.50/day 38 $38 .
Copies(@$0.10fC y) $0.10/page 50 $50
Graphics Workstation $2.50/hr 15 '.$15
GIS workstation $7.00Bd 28 528
8x11 color copies $1/pege $0
11x17 color copies $2/page 20 $20
&n House Equlpmerd Subtotal: $0 $663 $43 $20 $0 $726
Relmbursables.
Personal Vehicle Mileage 0.485 400 $400
PerDiem U.S.Gov rate 2,100 $2,100
Records Search at cost $0
Curmon at cost 2,000 $2,000
Maps(7.5'quads) Est.$8 per at cost $0
Phone/Fox/Postage at Cost 50 50 50 50 50 $250
Mise. SuppBes/FOm Processing at cost 150 200 $350
Rembursables Subtotat, $50 $2,700 $4250 $50 $50 $5100
SUBTOTAL ODCs $50 $3,363 $2,293 $70 $50- $5,826
Fee on OOCsr, 10.00% $5 $336 $229 $7 $5 $583
TOTAL ODCs $55 $3,699 $2,522 $77 $55 $6,408
TOTAL PROJECT COST - $447 $18,827 $6,882 $5,599 $1,180 $32,935
TASK DETAIL
Task 1:PreWd Coordination and Mobilization
Task 2:Field
Task 3:Report Preparation&Review 2007 INTx CULT RACK RATES Budget
Task M:PmJW Management
Mid-Higuera XPi Proposal-2007-1,1/222007
A• Page 2 of 2