Loading...
HomeMy WebLinkAbout04/17/2007, C5 - POLYBUTYLENE SERVICE REPLACEMENT PROJECT SPEC. NO. 90660 council Mw6,D� 11.61 j acEnaa Report I=N CITY OF SAN LUIS O B I S P O FROM: Jay Walter, Public Works Director Prepared By: Sergio Reyes, Engineering Technician SUBJECT: POLYBUTYLENE SERVICE REPLACEMENT PROJECT SPEC. NO. 90660 CAO RECOMMENDATION 1. Approve plans and specifications for the "Polybutylene Service Replacement Project Spec. No. 90660". 2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the engineer's estimate of$506,728. DISCUSSION Polybutylene plastic water pipe came into use in the 1970s and the City of San Luis Obispo, along with many other agencies, used the material for its water service systems. However, by the mid 1980s service failures in the piping system began to occur. The pipe lines had become brittle and were failing as a result. Although the City no longer allows the use of this material, an estimated 4,000 polybutylene water service lines were installed during the referenced time period.. In order to systematically address the problem, the City has established an annual replacement program that is scheduled to last approximately two more years. Each year the City's water supply system is researched to determine which services are in need of immediate replacement. Funding for the polybutylene water service replacement program is allocated on an annual basis. The level of funding is appropriate to allow for a cost-effective and productive project size. Past experience has demonstrated that multiple smaller projects result in higher cost per service. The proposed project will replace 189 polybutylene services, the vast majority of which are located in Paving Area 4. CONCURRENCES The Community Development Department has given this project a Categorical Exemption. FISCAL IMPACT This project was budgeted for in the 2005-2007 Financial Plan, Appendix B, page 85-87. Funding in the amount of $527,200 is currently available in the Polybutylene Replacement project account to support this project. CS — o o Report Title Page 2 Cost Detail: Construction: 457;480 Construction Contingencies: 45,748 Total for Construction: $503,228 Printing: 500 Materials Testing: 3,000 Total for other costs: $3,500 Total Cost of Project $506,728 ATTACHMENTS Plans and Specifications AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE g:,statt-reportsagendas-rrinutesLca,12007TcipN 0660 poly burynene\90660 car.doc cs �a