HomeMy WebLinkAbout05/15/2007, C3 - WATER IMPROVEMENT PROJECT SPEC. NO. 90694 ( [ I
counat Mft-i�D� May 15,2007
acEnba Report 1�N..b.cs
CITY OF SAN L U I S OBISPO
FROM: Jay D. Walter, Public Works Director
Prepared By: Sergio Reyes, Engineering Technician
SUBJECT: WATER IMPROVEMENT PROJECT SPEC. NO. 90694
CAO RECOMMENDATION
1. Approve plans and specifications for the"Water Improvement Project Spec. No. 90694".
2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the
lowest responsible bid is within the Engineer's Estimate of$347,405.
DISCUSSION
BACKGROUND
Replacement of the water distribution pipes, mainlines and related infrastructure is an ongoing
program. Growth within the City limits and more stringent fire protection regulations have
placed increased demands on the water distribution system. Some City water facilities are
improperly sized, are made of inferior materials, and/or are deteriorating due to age. Some water
lines in the City are over 100 years old. This program has three objectives:
1. Ensure reliable water service
2. Reduce the need for emergency repairs
3. Enhance available fire flow.
CURRENT
This project will replace portions of waterlines in South, Brook,and Sydney Streets. The
waterlines being replaced are 45 to 75 years old and have deteriorated to the point in which repeated
emergency repairs have been required. The waterlines in South and Brook Streets are in paving
area 2 which is scheduled to be paved in 2009 and the waterline in Sydney Street is in area 4 which
is scheduled to be paved in 201 L
CONCURRENCES
The Community Development Department has filed a Notice of Exemption for this project.
FISCAL IMPACT
This project was approved for funding in the 2005-2007 Financial Plan, Appendix B pages 77-
81. Funding in the amount of$395,478 is currently available in the Water Distribution System
Improvement main account.
C3--/
Water Improvement Project Spec. No. 90694 Page 2
Construction: $347,405.00
Construction Contingencies: $34,740.00
Total for Construction: $382,145.00
Printing: $500.00
Contract Inspection: $1,230.00
Materials Testing: $3,000.00
Monitoring: $8,600.00
Total for other costs: $13,330.00
Total Cost of Project $395,475.00
ATTACHMENT
Vicinity Map
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Plans and Specifications