HomeMy WebLinkAbout06/19/2007, C9 - BUS STOP IMPROVEMENT PROJECT SPEC. NO. 99001 council ".=`D= June 19,2007 j acEnaa Pwpont 1�N� q CITY OF SAN LUIS OBISPO FROM: Jay Walter, Public Works Directqlk3 Prepared By: John Webster, Trans anager SUBJECT: BUS STOP IMPROVEMENT PROJECT SPEC. NO. 99001 CAO RECOMMENDATION 1. Approve plans and specifications for the "Bus Stop Improvement Project Spec. No. 99001". 2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the engineer's estimate of$125,000. DISCUSSION In FY 2004-05 the City received a Federal Transit Administration grant in the amount of $118,400 to improve bus stop locations within the City.The grant requires a 20% match ($29,600) which was budgeted in the City's FY 2004-05 Federal Program of Projects as adopted by Council on November 16, 2004. The project has now been designed and is ready for bid and construction. The project will update approximately fifty (50) bus stop locations by removing old bus benches and installing the new metal benches identified in the Short Range Transit Plan (2003). The project will also remove many of the old '7' post bus stops outside the Downtown area and install safer break-away sign posts that will highlight the bus stop locations. Finally, a minimum of one bus shelter will be installed at the intersection of Foothill/Casa bus tum out where the old shelter was removed as part of the Foothill Bridge closure. The City will purchase and supply to the contractor all transit signs that will be used as part of the project. Because this is a grant funded project, if bids come in lower than engineers estimate, staff will work with the lowest responsible bidder to implement additional improvements at the bus stops to fully utilize all available federal funds. FISCAL IMPACT There is no General Fund allocation required for this project. The $29,600 required for local match will come from the City's Transportation Development Act funding which was programmed for this in FY 2004-05. Bus Stop Improvements—Specification 99001 Page 2 Cost Detail: Construction: 125,000 Construction Contingencies: 17,500 Total for Construction: $142,500 Printing: 500 Signs & misc. equip. purchase: 5,000 Total for other costs: $5,500 Total Cost of Project $148,000 AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and specifications for the "Bus Stop Improvement Project- Spec. No. 99001". g:\staN�reports-agendarminutw\-Mti2oo7,ip199001 bus stop Improvernems\99001 car bus stop improvemenis.doc C9-z