Loading...
HomeMy WebLinkAbout08/21/2007, C10 - TRAFFIC SIGNAL MODIFICATION AT MARSH & SANTA ROSA, SPECIFICATION NO. 90677 � I council 8,21/2007 agenba Report Cid CITY OF SAN LUIS O B I S P O FROM: Jay D. Walter,Director of Public-Wor Prepared By: Jake Hudson,Engineer III raffid5iPA— SUBJECT: TRAFFIC SIGNAL MODIFICATION AT MARSH& SANTA ROSA, SPECIFICATION NO. 90677 CAO RECOMMENDATION 1. Approve plans and specifications for the "Traffic Signal Modifications at Marsh& Santa Rosa, Specification No. 90677. 2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate of$170,000. 3. Approve the transfer of $43,000 from the Traffic Safety Report Implementation account to cover cost increases for the Traffic Signal Reconstruction at Marsh& Santa Rosa. 4. Approve the transfer of$87,000 in completed projects funding to cover cost increases forthe Traffic Signal Modification at Marsh& Santa Rosa. DISCUSSION Background Signal modifications at Marsh & Santa Rosa were originally identified in the 2001 Annual Traffic Safety Report, and the City Council approved funding for an improvement project in the 2003-05 Financial Plan. This project, along with a traffic signal installation at Broad & Pacific, and a traffic signal upgrade at Marsh & Osos, were bid together in September..2005. Only one proposal was received, which was significantly over budget and therefore rejected. In May of 2006, the three signal projects were split up and put back out to bid, but the results were similar, with the bids coming in significantly over budget. At that point the three locations were prioritized based on collision history and traffic volumes (#1 Broad & Pacific, #2 Marsh & Santa Rosa, and #3 Marsh & Osos), and funding for all three projects was consolidated in order to the fund the highest priority signal at Broad & Pacific (Attachment 1). Staff was directed to review the Santa Rosa& Marsh signal project and return to Council with recommendations for project changes, additional funding possibilities, or project deferral. Because the signal installation at Broad & Pacific is now complete, staff is requesting authorization to move forward with the #2 priority (signal modification at Marsh & Santa Rosa). Staff will return to council with recommendations for the #3 priority (signal modification at Marsh& Osos) as part of the 2006 Annual Traffic Safety Program. From 2001 to 2006, the intersection of Marsh & Santa Rosa was consistently identified as a high collision rate location, and at the November 14th, 2006 meeting, the City Council approved an appropriation of$60,000 from the General Fund balance (Attachment 2) to cover cost increases for the signal upgrades at Marsh& Santa Rosa, in order to move forward with the project. exp —� Traffic Signal Modification Marsh&Santa Rosa,Specification No.90677 Page 2 The original project was funded out of the Annual Traffic Safety Report from the 2003-05 Financial Plan, and was designed using outside consultant services. However, since that time staff has identified some changes to the project, which will require additional funds to complete the project. Redesign will be completed in-house; therefore all additional funding will be used for construction. Design Changes Traffic Signal Cabinet: The existing traffic signal cabinet, originally installed in 1958, is a small cabinet intended for the use of an older-style electro-mechanical signal controller, which is no longer in service. Since the existing cabinet cannot be modified for the newer equipment, the traffic signal cabinet and components need to be upgraded in order for this project to be constructed. Upgrading this cabinet also allows this intersection to be fully integrated into the City's traffic signal system, which includes video detection and central control capabilities. There is sufficient area to locate the new,, arger, signal cabinet,without aesthetic or access issues. Conduit & Conductors: The majority of existing conduits were also installed in 1958, and with almost 50 years of service they are failing and too small to meet the capacity needs of the current City standards. The proposed modifications require additional wiring that will not fit into the existing conduit, so new conduit and conductors need to be installed in order for this signal to function properly. It was initially believed that the existing controller and conduits could be reused as part of the upgrade project. However, since that time staff has determined that the existing cabinet and conduits lack the capacity and structural condition to accommodate the proposed upgrades. New Federal Standards N/E Pole Location: In 1996, the sidewalk on the N/E comer of Marsh& Santa Rosa was widened as part of a private development project. However, the signal pole on that corner was not relocated accordingly. This pole should be relocated as part of the project in order to conform to new Federal standards and improve signal head visibility. Crosswalk Illumination: The State Signal & Lighting Design Guide calls for overhead illumination of crosswalks at signalized intersections. However, the EB Marsh approach crosswalk does not currently have overhead lighting and the initial scope of work does not include any additional overhead lighting. Additional lighting should be installed as part of this project to conform to State guidelines and increase pedestrian safety. Staff has weighed the options, and has determined that the original scope of work needs to be modified to include the changes outlined above. Staff has completed redesign of the project in house, to include the changes, so that the project can be built to provide the intended operation. The new scope essentially calls for a completely new traffic signal. Staff believes that due to the age of the existing equipment, the appropriate time to make these improvements is now, because construction costs will continue to increase and collisions will continue to occur. Traffic Signal Modification Marsh&Santa Rosa,Specification No.90677 Page 3 FISCAL IMPACT This project is identified in the 2005-07 Financial Plan where $60,000 is allocated for construction. An additional $43,000 is also available for this project out of the Traffic Safety Report Implementation account. $95,000 was originally allocated for use on both the modifications at Marsh & Osos and Marsh& Santa Rosa. However, $52,000 of that $95,000 was transferred to complete the Broad & Pacifc signal installation. This leaves the additional $43,000 available for this project. However, this still leaves a funding gap of $87,000 necessary to complete the project. Staff is recommending a transfer of the remaining $87,000 from the Completed Projects account. After the 919 Palm project is closed out there will be a balance of approximately$175,000 in the completed projects account. 2005-07 Tragic Safety Report Imp. Completed Projects New Project Financial Plan Account Account Budget Engineer's Estimate: $60,000 NA NA $170,000 Construction Allocation: $60,000 $43,000 $67,000 $170,000 10%Contingencies: $0 $17.000 $17,000 Project Total: $60,000 $43,000 $84,000 $187,000 Miscellaneous $0 $3,000 $3,000 (PGE Permitting,Printing,etc.): Total Cost: $60,000 $43,000 $87,000 $190,000 Funds Available: $60,000 $43,000 $87,000 $190,000 The 2007-09 Financial Plan projects adequate resources are available to fund the proposed budget amendment. ALTERNATIVES The Council may defer construction until a later date. However, staff anticipates construction costs will only continue to increase over time. This intersection has a significant recurring traffic collision pattern; if the project does not proceed it is highly likely that traffic collisions will continue to occur. ATTACHMENTS 1. June 21St, 2006 CAO Report 2. November 14`h, 2006 Council Agenda Report Project Plans and specifications are available for review in the Council reading file. g.%tat4repons-agwdas inutesk mi'200TtransponationWaRc\90677 Marsh and santa rose signal upgradelwr 90677 adverbse.dw C Al ',3 ATTACHMENT I CAO REPORT Final CAO Approval Approver Name Date Approved City Administration S.Stanwyck 06/21/06 Reviewer Routing List Reviewer Name Date Reviewed City Attorney Jonathan Lowell June 19,2006 City Engineer Barbara Lynch June 21,2006 Finance&Information Technology Bill Stader June 21,2006 June 14, 2006 FROM: Jay Walter,Public Works Director BL PREPARED BY: Jake Hudson,Engineer H-Traffic SUBJECT: Traffic Signal Installation Project, Specification No. 90440 RECOMMENDATION: 1. Award a contract to Lee Wilson Electric Co. of Arroyo Grande,in the amount of$156,200 for the"Traffic Signal Installation at Broad and Pacific Streets; Specification No. 90440." 2. Approve processing of Contract Change Order 1,in the amount of$51;250 to complete the Traffic Signal Interconnect. 3. Approve the transfer of$52,000 from the Traffic Safety Report Implementation project. 4. Approve the transfer of$26,000 from the Parking Completed Projects Account. 5. Direct Staff to review the signal modification projects for Santa Rosa/Marsh and Marsh/Osos with additional recommendations for project changes,additional funding possibilities or project deferral. DISCUSSION: Background Initial Rejection of Bids. At its May 3, 2005 meeting, the Council authorized the CAO to advertise plans and specifications for the installation of a traffic signal at Broad & Pacific Street including traffic signal modifications at Marsh and Santa Rosa, Marsh and Osos, and Traffic Signal Interconnect, Specification No. 90440. The Council also authorized the City Administrative Officer to award the construction contract if the lowest responsible bid was within the engineer's estimate. The engineer's estimate for the project was $225;000. During the initial advertisement only one bid was received for the project and was opened on Thursday, September 22, 2005. The bid was $355,000 received from Lee Wilson Electric of Arroyo Grande, California. This bid was substantially above the engineer's estimate ($225,000) or 58% above the expected cost of the project. e/6 ,y ATTACID4ENT 1 CAO REPORT—Traffic Signal Installation Project, Specification No. 90440 At its November 1", 2005 meeting, the City Council rejected all construction bids received on September 22, 2005 and authorized the CAO to approve a revised bid package to reduce possible costs, solicit new bids from traffic signal contractors who have not historically bid on projects within the City, and award the contract if bids were within the engineer's estimate of$225,000. Re-bidding: Still Only One Bidder. The bid package was revised to separate out work for each signal improvement location to determine the exact cost for each, and to separate out non-essential work such as intersection paving that may be accomplished by another project. In addition, staff requested Council approve funding the higher priority portions of the project (signal and interconnect at Broad/Pacific) if its cost of installation was within the total project budget. The goal of the revised bid package was to allow staff to delete portions of work if the rebid cost is again over budget amounts and complete the highest priority project components within existing budget amounts. During the second advertisement several traffic signal contractors within the region were contacted and expressed no interest in bidding on projects within the City. Again, only one bid was received for the project and was opened on Thursday, May 25, 2006. The total bid was $320,450 received from Lee Wilson Electric of Arroyo Grande, California. Recommended Project This bid was again substantially above the engineer's estimate, but lower than their previous bid. The revised bid package does, however, allow us to award the contract on the base bid of$156,200 for the traffic signal installation at Broad & Pacific. Although there are not enough funds to award all the additive alternative bids, the traffic signal interconnect portion alternative in the amount of $51,250 is a key element of this project and should be constructed in conjunction with the signalization of Broad & Pacific. Unfortunately the contract was bid with the Signal Interconnect lumped together with the modifications at Marsh/Santa Rosa and Marsh/Osos, therefore it will be necessary to authorize this portion of the work via a contract change order as opposed to awarding it as an additive alternate. Therefore staff is recommending moving forward with the signal installation at Broad/Pacific and signal interconnect as part of this bid and returning to Council with an action plan for the two remaining signal modifications at Marsh/Osos and Marsh/Santa Rosa. Impacts of the Reduced Project Scope 1. Removed Locations. The Bid received for modifications at Marsh/Santa Rosa and Marsh/Osos was in the amount of $113,000, which was significantly above the engineer's estimate ($63,647). Due to the priority of the Broad & Pacific Signalization & Broad Street Interconnect it is necessary to postpone modifications at these two locations in order to fund the Signal at Broad & Pacific including the Broad Street Interconnect. The impact of postponing these two projects will most likely be a continuation of the existing collision pattern. 2. Removed Paving. The initial bid included paving on Pacific Street to accommodate installation of vehicle detector loops; however this portion of the project was not included in the second bid since it is already included in another scope of work which will follow this project. G:\Stati-Reports-Agendas-Minutes\_CAO\2006\Tramporation\90440 Broad&Pacific\90440Award.doc ATTACHMENT I CAO REPORT—Traffic Signal Installation Project, Specification No. 90440 Engineer's Estimate Versus Contract Cost The current bid market continues to cause significantly higher costs for certain materials such as steal, concrete and asphalt. In addition the bid climate this project has been determined to be more expensive due to labor rates, project design specifics inherent to the locations, limited staging areas for construction purposes, and lack of competition. Staff is proposing to move forward with the highest priority items in the bid package: the signal installation at Broad/Pacific and signal interconnect along Broad Street. The two miscellaneous signal modifications for Marsh/Santa Rosa and Marsh/Osos will be reviewed to determine if project modifications can be made to reduce cost, additional funding allocations from Council will be needed or if the projects can be deferred until a later time. FISCAL UVIPACT: As part of the 2003-05 Financial Plan Council allocated $120,000 for construction of the Broad & Pacific signal and$95,000 for the traffic signal modifications at Marsh/Santa Rosa and Marsh/Osos. On November 1, 2005 Council also approved the transfer of$26,125 in signal interconnect grant monies from the Bill Roalman bicycle boulevard project for construction of the signal interconnect on Broad Street. Therefore the total construction budget for this project is approximately$241,125. Although the total recommended bid award is within the $241,125 available, the Traffic Safety Report Implementation Funds ($95,000 for Marsh/Santa Rosa & Marsh/Osos) are not currently in the Broad/Pacific Signal installation project account. In order to award the recommended bid an additional $78,000 will be required. Staff is recommending transferring $52,000 from the $95,000 available in the Traffic Safety Report Implementation account and transferring $26,000 from the Parking Fund Completed Projects account (note: the Parking Fund is responsible for approximately 50% of the construction costs of the Broad/Pacific traffic signal as a result of the mitigation program for the Marsh Street Structure Expansion project). The following summarized current and proposed project costs and funding sources for the construction phase of this project. Project Bud et and Funding Sources: Construction Phase Project . . - Current Proosed Variance Construction —[-1136,006 207,450 71,444 Contingencies 7.4% 10,119 16,675. 6,556 Total Construction 1 $146,125_ $224,125 $78;000 Project-lFuncling Sources Current Proposed I Variance Capital Outlay Fund General Fund (Traffic Safety Report Imp.) 0 52,000 52,000 General Fund (Broad & Pacific) 40,000 40,000 0 Grant(Transfer from Bill. Roalman Bicycle Blvd) 26,125 26,125 0 Parking Fund 80,000 106,000 26,000 Total $146,125 1 $224,125 $78,000 Excludes$35,000 in design costs previously funded 6:\Staff-Reports-Agendas-Minutes\_CAO\2006\Transporation\90,40 Broad&Pacific\9044OAward.doc ( � ATTACHMENT CAO REPORT—Traffic Signal.Installation Project, Specification No. 90440 As reflected above,there will be no net fiscal impacts from the revised project scope: $52,000 will be funded by a transfer of$52,000 from available funds in the Traffic Safety Report Implementation account(which has a current balance of$95,000)and the Parking Fund completed projects(which has a current balance of$58,698). Staff 'will be working on the fiscal impact assessment of the delay, re-bid or redesign of the Marsh/Santa Rosa and Marsh/Osos traffic signal modifications and return to the CAO or Council with the necessary direction and approvals for the projects. ALTERNATIVES 1. Defer construction of Broad/Pacific and interconnect until a later date. Staff does not recommend this alternative because construction costs continue to escalate. Also, if these projects do not proceed, collision patterns are likely to continue at all locations. 2. Award base bid only (Broad/Pacific traffic signal) and defer construction of traffic signal interconnect until a later date. If the traffic signal interconnect is not completed in conjunction with Broad & Pacific signalization it will not be possible to operate this corridor in coordination which may lead to excessive delay and congestion. Implementing the interconnect at a later time will probably be more costly due to additional mobilization and start-up costs. ATTACEAIENTS 1. Bid Summary 2. Copy of original report authorizing advertising 3. Copy of original report rejecting all bids and reauthorizing advertising 4. Contract 5. Contract Change Order 1 6. Budget Amendment Request#1 7. Budget Amendment Request#2 \%dstomZVMW'Pubkcwoft OgePort-a9ffn�utms_=200614a p=fion\90440 broad&Poa ic190440mardAm G:\Staff-Reports-Agendas-Minutes\_CAO\2006\Transporation\90440 Broad&Pacific\9044OAward.doc ATTACHMENT 2 council ° °°°ft November 14,2006 agenda RepoRt h�.Nubw CITY OF SAN LU I S O BIS PO FROM: Jay D. Walter, Public Works Director Via: Tim Bochum, Deputy Director Public Works Prepared By: Jake Hudson, Engineer R-Traffic SUBJECT: 2005 ANNUAL TRAFFIC SAFETY REPORT CAO RECOMMENDATION 1. Review and discuss the 2005 Annual Traffic Safety Report and associated mitigation strategies. 2. Appropriate$60,000 from the General Fund balance to cover cost increases for signal upgrades at Marsh& Santa Rosa 3. Consider funding as part of the 2007-09 Financial Plan for the permanent realignment of Buena Vista& Garfield at Monterey,estimated at$290,000. 4. Consider funding as part of the 2007-09 Financial Plan for the landscaping new medians along the South Street Corridor,estimated at$500,000. REPORT-IN-BRIEF As part of the City's Traffic Safety Program, the Public Works and Police Departments have completed the fifth annual Traffic Safety Report(TSR). The TSR reviews all intersections and street segments in the City for collision rates and patterns for calendar year 2005. Based on these patterns, recommendations are made for altering or monitoring the five most critical locations of each intersection and street segment classification. Of these locations the most notable are: Marsh at Santa Rosa, Chorro at Pismo,Pismo and Santa Rosa,Monterey and Osos,and Morro at Pismo. Since the City initiated the Traffic Safety Report in 2002, traffic collisions have been on a downward trend, with the exception of 2004 when the City experienced a spike in accidents largely due to an influx of construction within City right-of-way. In 2005 total collisions were down 10%, injury collisions were down 10%,and fatal collisions were down 25%. Two major projects still remain either unfunded or not programmed from previous reports: traffic signal upgrades at Marsh & Santa.Rosa; and permanent realignment of Buena Vista & Garfield at Monterey. Signal upgrade at Marsh & Santa Rosa was originally funded by the 2003-05 Financial Plan along with the traffic signal installation at Broad & Pacific and the upgrade at Marsh & Osos. Due to increased construction costs, additional funding to the amount of $60,000, is required to complete this project Permanent realignment of Buena Vista & Garfield at Monterey is currently not programmed. A temporary realignment is currently in place. However, additional project funding will be required to complete a permanent realignment which is currently estimated at $290,000. �/a -sl' ATTACHMENT 2 2005 Annual Traffic Safety Report Paae.2_ DISCUSSION TSR Overview The collision data and corresponding analysis was compiled and completed by the Public Works Department in August of 2006. The TSR identifies patterns at highest collision rate locations of similar classification. We then narrow each list and analyze the top five locations to identify possible mitigations to address safety issues. For example, all arterial segments are compared to each other to establish the highest rated locations that will potentially receive mitigation or safety improvements. The analysis technique utilizes an advanced collision records software program that aids staff in determining collision patterns and potential corrective measures. In order to determine if corrective measures could reduce the likeliness of a collision type identified in the pattern, a comprehensive review of each location is conducted, including a survey of the field conditions and travel behavior. The significance of a location's "collision rate" is that it is a "normalized" indicator when comparing intersections or street segments. Under most conditions, the more vehicles entering the intersection, the more likely a collision is to occur. The collision rate is the ratio between the volume of vehicles and the number of collisions. Collision rates are used by police departments to target traffic enforcement and by engineers to establish traffic safety mitigation measures. Collision statistics within this report are based on actual police reports. While the TSR reviewed over 30 high collision rate locations, many,high incident locations were in construction zones or other temporary situations that no longer exist.As such, many locations have received a recommendation for continued monitoring..The 2005 TSR makes 11 recommendations to improve traffic safety at the remaining high collision rate locations. All but one of these 11 recommendations are low cost measures that have already been implemented or are in the process of being implemented. The remaining high cost measure,traffic signal upgrades for Marsh& Santa Rosa, is carried over from the previous year. As noted above, in order to complete this project additional funding will be required. Key tables and figures excerpted from the TSR provide a valuable insight to trends and results of our previous actions. In addition to this remaining high cost measure, the realignment of Buena Vista at Garfield is left over from the previous report. The . temporary realignment currently in place has mitigated the collision pattern and therefore this location no longer ranks in the 2005 TSR. The permanent realignment is not currently funded. TSR Results& Safety Trends Figure 3.1 of the TSR shows the seven-year comparison of total traffic collisions that have been reported within the City of San Luis Obispo. Although traffic collisions were on an upward trend in San Luis Obispo for the four year period from 1999 to 2002, in 2003 the number of reported collisions actually dropped and was, at the time, the lowest in the three years of the traffic safety program. In 2004, traffic collisions spiked, due largely in part to an increase in construction, including the Foothill Bridge closure and major construction activity such as the County Administration Building, Court Street Project, and 919 Palm Street Parking Structure. In 2005, the number of reported collisions was again the lowest in the five years of the traffic safety ATTACHMENT 2 2005 Annual Traffic Safety Report Page 3 program. There were 1,089 total collisions reported in 2005, approximately 10% lower than the previous 12-month period. Figure&I -Seven Year Collision Trend(excerpt from the 2005 TSR) 1,300 ,. 1,206 1200 � 1,09 089 1,100 — 1,0 � 1,000 — 910 -..1..__ 900 — —i— i 800 i 700 1999 2000 2001 2002 2003 2004 2005 Safety Program Figure 3.2 shows trends of seven-year injury collisions. Injury collisions, a primary benchmark of traffic safety indices, were also down by 10%in 2005 compared to 2004. Injury collisions as a percentage of all collisions have.historically been on the rise (25% in 2002 rising to 28% in 2003). However, in 2004 and 2005, the injury collisions as a percentage of all collisions remined static at 26%, approximately 2%lower than the previous year. Figure 3.2-Seven Year Injury Collision Trend(excerpt from the 2005 TSR) 340 320 .309-----307- 315 300 280 269 265—" , 260 i 240 240 220 200 1999 2000 2001 2002 2003 .2004 2005 2005 Fatalities Satety Pr�oeram Traffic collisions resulting in fatalities occur randomly and often do not occur at intersections with high collision rates; rather, they are usually the result of unique situations and conditions (including driver error) that often may not represent typical conditions correctible by mitigation. A high collision rate may be indicative of deficient roadway conditions that may be correctable by mitigation or alteration..Fatality analysis, while very important, should not be the sole focus for safety mitigations because individual collisions may not reflect broader factors causing collisions or leading to correctible measures. Traffic fatalities are often high profile incidents that ATTACHMENT 2005 Annual Traffic Safety Report Page 4- receive _receive the most attention from the public, media.and Council. Over the past seven years, the City has averaged two fatalities per year. Table 3.2 of the TSR compares injuries and fatalities by year to demonstrate this point. Table 32-City-wide Annual Injury and Fatal Collisions(excerpt frorn the 2005 TSR) Table Total Injury %of Total Fatal Annual Annual Collisions Change Change 1999 240 - 26.4% 2 - 2000 269 +12.1% 26.2% 2 0 2001 265 -1.5% 23.3% 1 -50% 2002 309 +16.6% 24.7% 1 0 2003 307 -0.6% 28.1% 0 -100% 2004 315 +2.1% 26.1% 4 +400% 2005 .285 -9.5% 26.1% 3 -25% Three fatalities were reported in 2005 within City limits. Of the 3 fatalities, 2 occurred on State Highways which are under State (Caltrans)jurisdiction: one was related to not yielding the right- of-way from a stop on Hwy 227 (Broad Street); and the other involved a child crossing Hwy 227 (South Street) on Halloween night. The only fatality that occurred within the City's jurisdiction was related to `'driving while under the influence" (DUI) on Santa Barbara Street. Mitigation Strategies for the 2005 TSR Mitigation strategies for the high collision rate locations for 2005 are identified in Section 6 of the 2005 Traffic Safety Report. Many of the mitigation measures are relatively low cost traffic improvements and will be completed using the annual traffic safety budget ($15,000). These include installation of additional signing and striping, miscellaneous visibility improvements, traffic control changes, and they will be implemented by staff. Some of the notable locations and recommended miti ations include: Location Classification- Mitigation/Notes Rankin Marsh/Santa Rosa A/A-#2 The predominant collision pattern involves signal head visibility. Mast arm and additional signal indications were identified as mitigation, additional funds required to complete construction. Interim signal modifications are to be installed November 2006. Chorro/Pismo A/C-41 Collision warrant met for all-way stop control. All-way stop control is to be installed November 2006. Pismo/Santa Rosa A/C #2 Continued S13 right vs. SB right sideswipe collision pattern. Right tum si m &striping to be revised to improve lane designation. Monterey/Osos A/L-91 Continued collisions as a result of parking maneuvers. Existing parking stalls do not conform to City standards,the length of parking stalls are to be increased to meet City standards. Morro/Pismo L/L-#1 Continued NB/SB Thru vs. WB Thru from #1 lane. Physical sight distance restriction due to on-street parking. Restricted parking zone to be extended & adjacent intersection Chorro/Pismo is to have all-way stop control installed. Ranking Classification:(example:A/A=Arterial/Arterial intersections)A-Arterial,C-Collector,L- Local ATTACHMENT 2 2005 Annual Traffic Safety Report Page 5 Malting permanent improvements at the intersection of Marsh and Santa Rosa is the only significant improvement project that remains unfunded from the 2004 TSR and is still a high collision location. The permanent realignment of Buena Vista and Garfield is an unfunded project from previous traffic safety reports but the temporary realignment using construction devices has corrected the collision pattern and this location no longer ranks highly in the 2005 TSR. The Fiscal Analysis section of this report discusses these issues in more depth. 2004 TSR:.Completed Safety Improvements Each year we report on traffic safety mitigation implemented as a result of the previous year TSR. Pursuant to recommendations in the .2004 Annual Traffic Safety Report, various safety improvements were implemented throughout the City during 2004. These included twelve sight distance improvements, eight signing & striping reconfiguration improvements, three roadway configuration improvements, and three pedestrian and bicycle improvements. Additionally, five ,traffic signal improvements have been completed or are in progress. Attachment 1 contains the full list of these completed improvements. 2005 Bicycle&Pedestrian Safety Review Table 4.1 of the TSR shows the annual comparison of total pedestrian collisions. Attachment 2 shows specific pedestrian collision information as identified in the safety report for the types and locations of collisions that occurred. Pursuant to previous Council direction; the TSR now includes information of whether the motor vehicle or pedestrianibicyclist was at fault for each collision. Table 4.1 -1999.2005 Pedestrian Collisions(excerpt from 2005 TSR) Total Reported 45 _ 4i Year Pedestrian Collisions on 40 a Public Streets 35 _ Pedestrian % Change 30z 2a _ zs — i 1999 24 20 ._ _ 2000 37 +54% 15 2001 19 -49% 10 2002 41 +54% s o . 2003 24. -41% 1999 2000 2001 2002 zoos 2004 .2005 2004 41 +41% Year 2005 26 1 -36% Source: City of San Luis Obispo Traffic Collision Database In general the number of annual pedestrian collisions fluxuates. up and down as seen over the past seven years. There were 26 total pedestrian related collisions reported in 2005, 36% lower than the previous year but at approximately the same level as 2003. Of these collsions, approximately two-thirds (58%)were caused by the motor vehicle involved in the crash. In general, bicycle collisions have been on an upward trend over the past seven years. In 2005, bicycle collisions were 10% higher than the previous year. There were 55 total bicycle related collisions reported in 2005. Table 4.4 of the TSR shows the annual comparison of total bicycle i ATTACHMENT 2 2005 Annual Traffic Safety Report Page 6 collisions, while Attachment 3 to this report shows specific bicycle collision information as identified in the safety report for the types of collisions that occurred. Of these collsions, approximately half(51%) were caused by the cyclist involved in the crash. Although pedestrian and bicycle collisions have been increasing over the past few years, these collisions are often difficult to mitigate. This is because they are primarily non-correctable incidents attributed to cyclist, driver,and/or pedestrian negligence. Table 4.4-1999.2005 Bicycle Collisions (excerpt from the 2005 TSR) Total Reported Year Bicycle Collisions on 60 _ — 54 55 Public Streets 55 52 52 Bicycle % Change o 50 45 50 46� 1999 52 - e 45 2000 46 -12% v 40 — 2001 45 -2% 2002 52 +13% 35 2003 54 +3.7% 1999 2000 2001 2002 2003 2004 .2005 2004 50 -7.4% Year 2005 55 +10% Source: City of San Luis Obispo Traffic Collision Database To address this concern, the Public Works Department has developed a public education campaign involving public service announcements (PSA) on Channel 20 and at the downtown movie theaters. These PSA's address the predominant bicycle and pedestrian collision types occurring in the City and suggest how to avoid them. In addition, the Police Department hosts the "Bicycle Rodeo", an annual bicycle safety education event that teaches proper bicycle riding techniques to children in the community. Buena Vista& Garfield One location identified in previous safety reports is the intersection of Buena Vista & Garfield. In 2003, staff identified a significant collision pattern at this location which involved westbound (WB) vehicles turning off of Monterey crossing the intersection diagonally and colliding with southbound (SB) Buena Vista vehicles. Staff attributed the pattern primarily to the geometry and alignment of the intersection, and recommended realignment to correct the pattern. In February 2005, a temporary realignment was installed in order to correct the pattern while staff met with adjacent property owners and developed the permanent solutions. The temporary realignment included closure of the SB right turn slip lane, realignment of Garfield at a 90 angle to Buena Vista, and decreasing the northeast curb radius. The realignment consisted of signing, striping, raised pavement markers, delineators, and barricades. Since the temporary realignment was installed in February 2005, only one collision(pedestrian)has been reported. In December 2005, staff held its first meeting with adjacent property owners and businesses to discuss the temporary closure and alternatives for the permanent realignment. The meeting was attended by representatives of La Cuesta Inn, the Sands Suites,the gas station and the Days Inn. The group discussed safety and access needs for the intersection and staff presented various ATTACHMENT 2 2005 Annual Traffic Safety Report Page 7 alternatives and concepts which could potentially be designed into the permanent solutions. In July 2006, staff held its second meeting to present two refined concepts which incorporated property owner comments. The group identified their preferred alternative and asked staff to "clean up"the existing temporary installation. The cleanup was completed in September. The permanent realignment will consist of installing curb, gutter, and sidewalk along the; Garfield realignment to Buena Vista, across the existing right turn slip lane on Monterey, and at the northeast corner of the intersection along with partial demolition of the exiting island and construction of a new pedestrian refuge island. Based on current estimates, the project will cost approximately $290,000. Since this far exceeds the annual safety budget of$15,000, additional funding will be required to design and construct this project. The final design for this project will result in unused right-of-way; once the final design is complete staff will return to Council with recommendations on what to do with this remainder area. South Street(Hwy 227) & King Street As stated previously, fatal collisions occur randomly and are often not at intersections with high collision rates. As such, they may not represent typical conditions correctible by mitigation. However, in response to a fatal accident on Halloween night that claimed the life of a child, Caltrans and the City hosted a town hall meeting in January.2006 to receive input from the community about safety issues on South Street. As a result of the meeting, a focus group was created to develop recommendations for Caltrans and the City to consider safety enhancements safety for pedestrians and bicycles that travel the South Street corridor. The focus group was facilitated by Caltrans and was comprised of 11 community members, including representatives' from the City's Public Works and Police Departments. The focus group compiled a package of recommendations supported by City'staff: eight short term, three medium term, and three long term. Of these recommendations, the most significant is the reconfiguration of South Street to two through lanes, a center turn lane with medians, bike lanes, and increased parking. At its June 6, 2006 meeting, Council voted to support making these recommendations to Caltrans including the lane reconfiguration concept. The CalTrans median project consists of median islands along South Street from Higuera Street to Broad Street with the intention of providing pedestrian refuge islands and slowing traffic. Having these medians landscaped is necessary to maximize the intent of their installation and improve aesthetics. However, due to funding limits, CalTrans has decided to exclude landscaping as part of it's construction plans and delegate the option to landscape these medians to the City. Currently there is not enough funding available in the traffic safety budget to landscape these medians. Therefore additional funding will be required. Staff recommends considering this funding as part of the FY 2007-09 Financial Plan process. CONCURRENCES The City of San Luis Obispo Police Department has reviewed the 2005 Annual Traffic Safety Report and concurs with its findings. The Parking Services Division of the Public Works Department has reviewed the 2005 Annual Traffic Safety Report and concurs with its findings. ATTACHMENT 2 2005 Annual Traffic Safety Report Page 8 FISCAL IMPACT Most of the mitigation strategies identified the 2005 Traffic Safety Report will be funded from the 2005-07 Financial Plan through it's allocation of $15,000 annually for safety related purposes. It is important to note that as part of the City's past budget balancing actions, the annual allocation for traffic safety purposes was reduced by $20,000 annually (prior year allocations were $35,000) and this limits our ability to immediately respond to identified problem areas. As discussed previously in this report, there are two "higher" cost mitigations that are significantly underfunded. From the 2005 Traffic Safety report the project includes the installation of traffic signal mast arms and additional vehicle indications at the intersection of. The current additional funding needed for signal upgrades at Marsh & Santa Rosa is estimated at $60,000. The permanent realignment of Buena Vista & Garfield has not been funded. This project includes the reconfiguration of Buena Vista at Garfield and Monterey and conversion of the successful temporary mitigation devices to a more permanent improvement. The current estimate for the project is $290,000. Currently there is not enough funding in the traffic safety budget, therefore additional funding will be required for design and construction: We recommend funding the traffic signal upgrades at Marsh and Santa Rosa at this time from the General Fund balance. Due to its one-time cost and high priority in reducing collisions; this is an appropriate use of General Fund reserves; and the remaining balance will be significantly higher than our policy minimum. As detailed in the interim financial report for 2005-06, we ended last fiscal year in better condition than we projected in the 2006-07 Financial Plan Supplement by $2.9 million. This results in a General Fund balance that is above our minimum fund balance policy. As discussed in the report, this improvement was largely due to one-time factors, and as such, should not be used for ongoing costs. However, this modest use of reserves ($60,000) above our policy minimum is appropriate in funding high-priority, one-time projects like this one. On the other hand, we believe that any significant use of our reserves — even for one-time projects— that is significant, should be considered as part of the 2007-09 Financial Plan process, where funding can be placed in the context of Council goal-setting and other high-priority needs. The $290,000 expenditure for the Buena Vista improvements fall in this category. Summary The engineering safety program is in its fifth year of operation and, in order for it to continue to be successful, a prolonged commitment both financially and through staff resources is necessary to properly implement safety mitigation and reduce collisions. Similar to the Pavement Management program, annual expenditure commitments will be necessary (even in difficult financial times) if it is the goal of our City and community to improve traffic, pedestrian and bicycle safety along our roadways. ATTACHMENT 2005 Annual Traffic Safety Report Page 9 ALTERNATIVES 1. Council may wish to fund the realignment of Buena Vista& Garfield at this time out of the unreserved General Fund balance. This alternative would allow for the improvements to be installed much sooner as opposed to consider funding as part of the FY 2007 Financial Plan. However,given the cost of the project,we believe it should be evaluated in the context of all other City needs. 2. Council may wish to defer the additional funding for signal upgrades at Marsh & Santa Rosa until a later date. This is not recommended given it's continued collision pattern and need for immediate corrections. Attachments 1. 2005 Completed Traffic Safety Improvements 2. Pedestrian Collision Types 2001 through 2005 I Bicycle Collision Types 2001 through 2005 A copy of the 2005 Annual Traffic Safety Report is in the Council reading file. The 2005 Annual Traffic Safety Report is available for review at the City Clerk's Office in City Hall (990 Palm Street), the Public Works. Department (919 Palm Street), and online at WWW.SLOCITY.ORG. G:\Staff-Reports-Agendas-Minutes\_CAR\2006\Ttansportation\CAR 2005 Traffic Safety Report CAR.doc C /a -ice