HomeMy WebLinkAbout08/21/2007, C12 - WATERLINE REPLACEMENT PROJECT, SECIFICATION NO. 90634 council MRfigDa 08/21/07 agenbA Report ��H G�z CITY OF SAN LUIS OBISPO FROM: Jay Walter, Public Works Director Prepared By: Christine Cornejo, Engineering Technician SUBJECT: WATERLINE REPLACEMENT PROJECT, SECIFICATION NO. 90634 CAO RECOMMENDATION 1. Approve the plans and specifications for the "Waterline Replacement Project"., Specification No. 90634. 2. Authorize Staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate of$1,032,350.00. DISCUSSION Replacement of water distribution pipes,:mainlines and related facilities is an ongoing program to replace aging, substandard and deteriorating infrastructure. This program has three objectives; 1) Ensure reliable water services 2) Reduce the need for emergency repairs 3) Enhance available fire flows Based on priorities set by the Utilities Department, the following waterlines have been selected for replacement and are shown on Attachment 1. BROAD/Peach to Monterey BIANCHI LANE/Higuera to West End MORRO /Peach to Palm GRAND/ Slack to McCollum GRAND/Hope to Monterey Grand Avenue is identified in the 2005-2007 Financial Plan Appendix B, page 80 under 2008- 2009 projects; however main line breaks that occurred within the last year have necessitated the need to move the project forward. Grand Avenue is also identified in the 2007-2009 Financial Plan Appendix B, year, one schedule for slurry seal. By moving the project forward it will be completed before the slurry seal project scheduled to begin July 2008. This project will be completed in phases in order to take best advantage of when Old Mission Grammar School, Mission College Preparatory, Manzanita School and Cal Poly are out for Thanksgiving and Christmas vacations as well as to alleviate disruption to surrounding homes, business and to the Veterans' building at Grand and Monterey. C�12-� Waterline Replacement Project, Specification No. 90535 Page 2 The schedule is as follows. Phase 1 GRAND—Slack to McCollum 11/5/07— 11/23/07 Thanksgiving Holiday Phase 2 MORRO—Peach to Palm 11/26/07-12/07/07 Phase 3 BROAD—Peach to Monterey 12/10/07—01/04/08 Christmas Vacation Phase 4 BIANCHI LANE—Higuera to West side of bridge 01/07/08—01/16/08 This keeps Morro, Broad&Bianch in line for monitoring, eliminating excessive charges for drive time and associated travel cost for the required monitor. Phase 9 GRAND AVE.—Hope to Monterey 01/17/08—02/27/08 Grand is a four lane residential arterial,construction will allow the north two lanes to remain open and one southbound lane open for traffic. CONCURRENCES The Community Development Department has granted a Notice of Exemption for Grand Avenue. A Phase 1 study was completed on Morro, Broad, and Bianchi Lane and reviewed on April 7, 2007. A Mitigated Negative Declaration of Environmental Impact was prepared (Project ER 181-05). As part of the mitigation measures Morro, Broad, and Bianchi Lane shall be monitored by a qualified historical archaeologist. FISCAL IMPACT This project is identified in the 2005-2007 Financial Plan Appendix B, pages 79 & 80. Funding for this project is available in the Water Distribution System Improvements Main Account, which has a current balance of$ 1,235,727.00 FUNDING Water Distribution System Inaprovernent Main Acct. 1,366,100.00 .Sprinkler Lateral Reimbursment ($9,050.00) Higuera Streetpaving ($121,323.00) Cal Trans 227 ($46,100.00) .Subtotal:- $1,189,627.00 Total Cost of Project W$1,164,975.00 Available Balance -- $24,652.00 eiz-z Waterline Replacement Project,Specification N6.90535 Page 3 CONSTRUCTION COST Engineer's Estimate:Construction _ 1,032,350.00 Total Contingencies: $103,235.00 Total for Construction: $1,135,585.00 Printing: $500.00 Materials Testing•. L $10,000.00 Monitoring $18,890.00 Total Cost of Project $1,164,975.00 ATTACHMENTS 1. Morro, Broad & Bianchi Lane Vicinity Map 2. Grand Avenue Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Specifications G:\Staff-Reports-Agendas-Minutes\_CAR\2007\CIP\90634 Waterline Replacement\90634 CAR Waterline Replacement Project.DOC i � f ATTACHMENT 2 Water Line Installation Project 90634 2006/2007 Budget Year [:Jwir 1:Ju 0 Q J K �c O O 101 S ON FF 01 101 101 N OFF 101 101 N ON m I F O P QP� Legend DISTRICT China Town Downtown MU Street Cid Town RWIU d ` hist—dist Tood500 Oood7t10 e12 "50",