HomeMy WebLinkAbout10/02/2007, C3 - ORCUTT ROAD WATERLINE REPLACEMENT, SPECIFICATION NO. 90785 Council M fi° D° Oct 2,2007 j acEnbA REpoln 1=Ni�63 CITY OF SAN LUIS OBISPO FROM: Jay Walter, Public Works Direct �W Prepared By: Jennifer Lawrence, E ineering Technician SUBJECT: ORCUTT ROAD WATERLINE REPLACEMENT, SPECIFICATION NO. 90785 CAO RECOMMENDATION 1. Approve plans and specifications for Orcutt Road Waterline Replacement project, Specification No. 90785 2. Authorize Staff to advertise for bids and authorize the CAO to award the contract if the lowest responsible bid is within the Engineer's Estimate of$198,100. 3. Appropriate $228,160 from Water Fund Working Capital to Water Distribution System Improvements Main Account to fund estimated project costs. DISCUSSION Replacement of water distribution pipes, mainlines and related infrastructure is an ongoing program to replace aging and deteriorating infrastructure. This program has three objectives: 1. Ensure reliable water services; 2. Reduce the need for emergency repairs; 3. Enhance available fire flows. The waterline in Orcutt Road has experienced several breaks in the last two years. As a result, the Orcutt Road Waterline Replacement project has been identified as a top priority by the Utilities Department. While construction projects require the water to be shut off, similar to what occurs when a line breaks, the shut-off can be scheduled with users so they are prepared and inconvenienced as little as possible. Water line breaks typically occur without warning. The Public Works Department is planning a major street improvement project to be constructed on Orcutt Road in the vicinity of the proposed waterline improvement in early 2008. It is therefore necessary to expedite installation of the new waterline before new paving is placed. CONCURRENCES The Community Development Department has given this project a categorical exemption from environmental review. i Orcutt Road Waterline Replacement,Specification No.90785 Page 2 FISCAL IMPACT This project is identified in the 2007-09 Financial Plan Appendix B, page 3-92, as a top priority project. Prior CIP projects for waterline replacements at various locations have already used the $1.3 million dollars budgeted in 2007-08 and so funding for this project is not currently available within the Water Distribution System Improvements Main Account or existing resources. Staff recommends appropriating $228,160 from working capital to the Water Distribution System Improvements Main Account to'fund the Orcutt Road Waterline Replacement estimated project costs. There is adequate working capital in the Water Fund to fund this project and retain working capital above policy levels. Engineer's Estimate $198,100 10% Contingencies 1 $19,810 Total for Construction $217,9101 I Testing $10,000 Miscellaneous incl prirltin $250 Total Project Cost 1 $2289160 Requested Appropriation from Working Capital $2289160' ATTACHMENTS Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE 1. Plans and Special Provisions G:\Staff-Reports-Agendas-MinutesLCAR\2007\CIP\90785 Orcutt Road Waterline\90785 CAR adv.doc C3-z ' Attachment -� S �TyWoo 0 ON Of N cT o < 0 UT ORCU O� P PROJECT SCOPE Orcutt Road: Laurel - Fernwood N AA (��"�",J O� ORCUTT ROAD WATERLINE IMPROVEMENTS city SPECIFICATION NO.90785 LOCATION MAP San tui S OBI SPO G 3 3