HomeMy WebLinkAbout04/15/2008, C9 - CORPORATION YARD ROOF REPAIRS, SPECIFICATION NO. 90441 c c council D� April 15,2008 j ac En as wpoRt 1�N..b` 9 CITY OF SAN LUIS OBISPO FROM: Jay D. Walter,Director of Public Works Prepared By: Michael J. McGuire, Engineer III K,,k SUBJECT: CORPORATION YARD ROOF REPAIRS, SPECIFICATION No. 90441 CAO RECOMMENDATION 1. Approve plans and specifications for "Corporation Yard Roof Repairs, Specification No. 90441." 2. Authorize staff to advertise for bids and authorize the City Administrative Officer to award the contract if the lowest responsible bid is within the Engineer's Estimate of$235,000. 3. Approve the transfer finds in the amount of $30;250 from the capital improvement plans (CIP)reserve account to fund additional construction management costs. DISCUSSION The Corporation Yard Administration, Fleet Maintenance and Wastewater Collection buildings, all steel structures built in the early 1980's, have dealt with water intrusion to the building interiors for the past few years. This has been due to the deteriorating condition of the metal roofs, especially around the perimeter of the buildings. Roof panel rusting and an inferior gutter system have allowed water to penetrate into the building interior resulting in damage to walls, carpeting, flooring, supplies and office equipment. Building Maintenance staff has made numerous short-term repairs to the roof systems. Currently the existing roofs are in such poor condition that portions of the roof and gutter are beyond repairing. Staff retained the services of Architectural Roof Design Group Inc. (ARDG) to investigate and remediate the existing roof structure of the buildings. ARDG has designed plans to repair the gutters, replace or overlay damaged metal roof and skylight panels with new panels and cover the entire roof surfaces with a fluid-applied elastomeric membrane coating. Construction Management and Inspection Consistent with the strategy approved by the Council during the 2007-08 mid-year budget review, staff recommended contracting for construction management for this project. As discussed with the Council, largely due to the implementation of Measure Y priorities, the quantity of scheduled CEP projects in the 2007-09 Financial Plan has increased almost two-fold from previous years. The 2007-09 Financial Plan addressed this increased workload by providing additional funding for contract design and contract management resources. While the amount funded for contract design was determined adequate, the mid-year budget review revealed an underestimation in the amount needed for contract inspection. As a result, the Council adopted a two-prong approach in response to the need for additional construction management. A contract employee was added for the balance of 2007-09 fiscal year Corporation Yard Roof Repairs Page 2 and the need for supplemental funding for consultant construction management would be assessed on a case-by-case basis as projects come forward for approval of plans and specifications. Based on current City inspection staff workload and the suitability of this project for contracted construction management, staff recommends the transfer of funds in the amount of$30,250 from the CIP reserve account for this purpose. This amount is based on current market rates for contract construction management of 15% of total project construction costs.. FISCAL IMPACT The 2007-09 Financial Plan, Appendix B, pages 3-533 to 3-538, identifies $265,000 in the construction phase to support this project. Construction: $235,000 Construction Contingency: 24,000 Construction Management(CM): 5,000 Printing/Advertising: 1,000 TOTAL: $265,000 CIP reserve account: $30,250 NEW TOTAL: $295,250 As discussed above, construction management will cost an additional $30,250, which staff recommends funding from the CIP reserve account. Currently, there is $781,412 in the CIP reserve account. The balance remaining after the proposed transfer will be $751,162. There is a sufficient account balance to cover this transfer of funds. ALTERNATIVES The Council may deny or defer construction of the project. However, staff anticipates that water leakage into the building will continue. This impact will have the potential to damage the structural framing, the building interiors and the building contents. Additionally, staff foresees the increase of construction costs, labor and materials as a direct result of rising fuel costs. ATTACHMENT Project plans and specifications are available for review in the Council reading file. G:\Staff-Reports-Agendas-Minutes\_CAR\2008\CIP\90441 Corp Yard Roof Repairs �q z