HomeMy WebLinkAbout09/02/2008, C3 - STORM DRAIN IMPROVEMENTS - ALMOND STREET, SPECIFICATION NUMBER 90822 counat D� 09/02/08 j ac En as Report I.Nb. c 3 CITY O F SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works Prepared By: Matt Horn, Supervising Civil Engineer SUBJECT: STORM DRAIN IMPROVEMENTS — ALMOND STREET, SPECIFICATION NUMBER 90822 CAO RECOMMENDATION 1. Approve the plans and specifications for Storm Drain Improvements — Almond Street, Specification Number 90822. 2. Authorize Staff to advertise for bids and authorize the City Administrative Officer to award the contract if the lowest responsible bid is within the Engineer's Estimate of$142,570. DISCUSSION Background A large portion of the City's storm sewer pipeline infrastructure is comprised of corrugated metal pipe (CMP). In the 1970's and 1980's CMP was the industry standard due to its inexpensive material cost and ease of installation. Since then, CMP has proven to have a design life of 20 to 30 years. CMP typically fails by friction, corrosion or both. Once the integrity of the pipe has been compromised, the pipe's surrounding soil becomes susceptible to piping(soil picked up by flowing water and carried away)and the pipe will eventually collapse. With the adoption of the 2007-09 Financial Plan the City has implemented a program to remove existing CMP facilities and replace them with new storm drain pipes. At the current funding level with the estimated number of CMP facilities in the City's inventory, Staff estimates that it will take about 30 years to replace all these CMP facilities with new storm drain pipe. Current Project In December 2007 Staff was made aware of a sink hole that had developed between 246 and 248 Almond Street. Staff investigated the sink hole and discovered a failing CMP storm drain system in the near vicinity, extending from the street area to the creek, adjacent to two homes. Staff solicited a proposal from a consultant to prepare plans and specifications for this work. The Wallace Group submitted a proposal that was appropriate in both scope and cost and a purchase order was award. The Wallace Group has now completed the plans and specifications and this project will replace approximately 400 feet of corrugated metal pipe (CMP) and install approximately 100 feet of plastic pipe liner. The CMP that will be replaced with this project is located under roadway sections of Almond Street and Almond Alley. The portion of CMP to be lined resides inside an easement between 246 and 248 Almond Street. Lining this section of CMP will minimize this STORM DRAIN IMPROVEMENTS—ALMOND STREET Page 2 project's impact to the surrounding private property and at the same time achieve the project's goals of stabilizing this storm drain facility. CONCURRENCES The Community Development Department has reviewed this project and has prepared a Categorical Exemption for compliance with the California Environmental Quality Act. FISCAL IMPACT The 2007-09 Financial Plan, Appendix B, pages 3-293 through 3-296, identifies in the 2007-09 fiscal years $12,400 for environmental review, $60,000 for design, $1,230,000 for construction and $60,000 for construction management services in a master account to support this and other CMP replacement projects Phase �� 2007-08 FYI 2008-09 FYI , Phase Total Environmental Review $6,200 _$6,200 $12,400 Design _ $30,000 $30,000 $60,000 Construction $600,000 $630,000 $1,230,000 Construction Management �j $30,000 $30,000 $60,000 Fiscal Year Total $666,200.00 $696,200.00 Below is a list of CMP projects that have been recently completed, are advertising for bidders, or are currently being designed and are anticipated to use 2007-08 fiscal year master account funding. Project design work for 2008-09 will begin this fall for spring 2009 construction. Project T Status F Estimated Construction Costs Mission CMP _ _ Complete�Y $85,000 San Luis Drive CMP Construction $22,000 *Almond Street CMP Advertising $168,000 Mission Lane CMP _ Design $150,000 Kentucky at Stafford _v Design $30,000 fliguera.CMP _ DesignJ $75,000 Totalf $530,000 * Indicates this project as being the subject of this staff report and project status indicates approval of the City Administrative Officer's recommendations. It has not been determined at this time if Construction Management funds will be needed for this project. The Storm Drain Improvement—Almond Street estimated funding needs are as follows: c 3-�- STORM DRAIN IMPROVEMENTS—ALMOND STREET Page 3 Specification No. 90822 Budget Construction: $142,570 Construction Contingencies: $22,430 Total for Construction: $165,000 Prmtulg. $500 Materials Testing: $2,500 Total for other costs: $3,000 Total Cost of Project $1689000 2007-08 Carryover $ 459,554 2008-09 Budget $ 630,000 Available Funding $ 11089,554 Currently there is $1,089,554 available in the construction phase of the master account to support this request of$168,000. At the time of contract award, a Budget Amendment Request will be generated to transfer funding from the CMP Replacement master account to the this project account. Relationship to Short-Term Actions in Fiscal Heath Contingency Plan The City's Fiscal Health Contingency Plan was recently activated and as a result all CIP projects are currently under review for possible deferral or deletion. A report is planned for Council review in September 2008 that will identify and recommend project deferrals and deletions. While this review is underway and not yet completed, staff recommends going forward with bidding for this project at this time for the following reasons: 1. This is a maintenance-related project. Delay or deferral of the project could cause road failures and private property damage. As such, this project may be an unlikely candidate for CIP deletion or deferral. 2. Plans and specifications have already been prepared and the project is ready to advertise for bids. The current economic climate is favorable for construction bidding, therefore staff recommends capitalizing on this investment. ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Specifications G:\Staff-Reports-Agendas-Minutes\_CAR\2008\CIP\90822 Almond CMP\90822 Adv.doc c3 3 -' J; P��P Ov ` vaeeave s O ti WJb O O O U O O � O N >] f2 y O O �y Hwy' AR VV � �'oa r6y�1 ,11A ),VMHIVH O > AVMHIVH P ®O O O ZE O %011 O o F� F � N3113 S � 15 O Q Y Z O c O 213NN3O PJ/ o'° PN , St VSVO r7� Oij> O y b o y6o o m O oP° r2OO yO s a �0`� h• J' O bd� db� °Pg O IL9, O �a m � 9/y r S;9 i 0� m av088 BROAD ONV8d3 73pNbNb3 FFRRINI 0 � � z o � � N NVWN3d 0 v 302i3A V1S3n0 Q Wl3 S1H013HONV2R3 Z JVIVSSVl•N VfVSSVi -S U OO Z IVNVO V1 13V3Va W r Q m v1NVs Z 0 U o � Z J bfOh 9 i d J :19 MIN V7 a \A N �d c� Q z u Z N 1f �0 1150 w O N 5 i GERR° g 'b) 1N3 W HOV.LLV >f