CITY OF SAN LUIS O B I S P O
FROM: Jay D. Walter, Director of Public Works ,70W
Prepared by: Dan Van Beveren, Senior Civil Engineer
SUBJECT: RAW WATER BYPASS, SPECIFICATION NO. 90802
CAO RECOMMENDATION:
1. Award a contract to Vinciguerra Construction in the amount of$318,416 for the Raw Water
Bypass Project, Specification No. 90802 and authorize the Mayor to execute the agreement.
2. Approve the fund transfer amounts of$418,416 from the Water Treatment Plant Major
Equipment Maintenance Account to the Raw Water Bypass Project.Account.
DISCUSSION
The City's raw waterline delivers untreated water from the Salinas Reservoir to the Water
Treatment Plant on Stenner Creek Road. A portion of the raw water pipeline approximately one
mile north of the Water Treatment Plant is in poor condition and requires frequent maintenance.
The Raw Water Bypass project involves the installation of approximately 1000 feet of new
waterline which will bypass the existing,substandard piping.
On August 19, 2008, the City Council authorized the invitation for bids for the Raw Water Bypass
project. The City received ten bids which were opened on September 25, 2008. The lowest bid
was received from Vinciguerra Construction in the amount of$318,416.
Each of the ten bids received for this project were greater than the Engineer's Estimate of$300,000.
However, staff does not believe that there is any advantage to rebidding the project and is
recommending that the construction contract be awarded to Vinciguerra Construction in the amount
of$318,416.
FISCAL IMPACT
The project, as approved by Council, contained an engineer's estimate of $300,000 for the
construction contract, $30,000 for contingencies, $60,000 for construction management and
$10,000 for testing and other miscellaneous costs for a total construction budget of $400,000.
With the lowest bid amount of $318,416, an additional $18,416 will be needed to fund the
construction contract. We believe the funding for the other items is adequate. The total project
budget as proposed is shown in the table below.
0, 19 — 1
I
Council Agenda Report—Raw Water Bypass, Specification No.90802 Page 2
Raw Water Bypass (90802) Cost
Construction: $318,416
Construction Contingencies: $30,000
Total for Construction: $348,416
Construction Management: $60,000
Testing& other Misc Costs: $10,000
Total Project Cost: $418,416
Available Funding
Major Equipment Maint Acct (99653) $ 450,878
The 2005-07 Financial Plan, page 72, identifies this project with funding from the Water
Treatment Plant Major Equipment Maintenance account. This account currently contains a
balance of$450,878. Upon Council approval, a budget amendment request will be processed for
the transfer of $418,416 from the Major Equipment Maintenance account to the Raw Water
Bypass project account.
ATTACHMENTS
1. Bid Summary
2. Contract Agreement, Vinciguerra Construction
Uchstore?WuhkcN'orks\Stalf-Repor Agendas-Minutes\CAM200MCIM90802 Raw Water By usl90802 award.doe
C l�- a-
ATTACHMENT#1
a s" 8 s 88888
8
g8s a asggg
o m m
e � w�
O z c SS8 8 8 8888.
Mo5i g
m0`dm
K 6mJ p p p O
p$O$8 Q$8O O
g m E TIS b r A NCi
�p M U H F O x O 0 0
x O $
yL ITOaAi t x M„ N w N 0 G f n N A m vi C N In m
x N
O O
m
i0m i $88 $ $ 888.8 mcg g 888. 8 $ 8888
gog
S0� � fC wm N 0tf�0 � O)O w wOON'1
pmp '"w SSm
6 tYJ Um J
'a 88 Q8 Q8 q8 8 8g8Q8g88 8.$g$g 8Q S$ 888Q88
E 25255 � '$n �gg�= E 8i7id K X'i $n$8g,a
!iv Na
a m x
u w w
8 tae16
a $ a8
mo
Km C.-OJ
P 888 8 8 888_88 g 888 $ $ 888$8
E m$n
S N ecm .x
m2s" 888 8888 0% f 888 8. $ 888_8
mo ° p pp yq m
U-
L § ro.9VR N Y�e'I 1m1VV N YUR § �VNVm `a ^`�`
$r w m x N 3 N Om p 0 M w
0.9m V
8$$. 8 S 88888 C o 888 8 a $8880
RAYml w w x x w m u n w w w x
o
5 y
baa 8888 8 8 888g8. � 02 € 8884 q8 8 8 8488888
vqv° � s 2V52525 }X 8 ni52525
m;Y � NNN xNNn iF�JS � NMN CI IVN
LLCC 01J
P 888 8 S. 8888'0 $ '0.888 8 $888 cc
E ggg R $ g999� E $ o a mgggg
P OOOO Or plt��N
x W0
E G C G G c y w
8g8:181, O
cc 6$m
W S m m
i
o' a'
zz °jo >q w zz �$
�F a �a o 9< °a �a o
J( Q zd
m 0
OZo amm o;w z Ow mm h
'm °��o 'm �o ay
0
N mw -z
lU m�m mm ♦ mm mN
0 os 3 3� 3__ o 0 ns 3,.� 3� 3'F
of�O ozrc0 r[oF �m �ww4o
n om�'� wy° iS$ w�a°r 8 o'�vsii fNor w5e ��a°�
pSWza .LL�,� oLLJSBu�F SWi6.OLLLL ,�E °m �
W W Z
c mowJt zumzd€ EpmOwJ iud zumzd
ymm zOZxa e <�Odw��nw ! o x< d�> dao yy�I
f Q m 1 N m N F N 1-1- - �6 w� N m N m H N H
x` O O O
E m P u E
"V c a E 4 L a
3 `s c 3f ems gf 8
O ina u m m 3.m. m a >9
c0 m m d m o� s d ni cim o
�( '3
- ATTACHMENT#2
CITY OF SAN LUIS OBISPO
CALIFORNIA
AGREEMENT
THIS AGREEMENT, made on this day of 2008, by and between the City of San Luis Obispo, a municipal
corporation and charter city,San Luis Obispo County,California(hereinafter called the Owner)and
VINCIGUERRA CONSTRUCTION (hereinafter called the Contractor).
WITNESSETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1,SCOPE OF WORK: The Contractor shall perform everything required to be performed,shall provide and famish all
of the labor,materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the
work of construction of
RAW WATER BYPASS,SPEC NO.90802
in strict accordance with the plans and specifications therefor,including any and all Addenda,adopted by the Owner,in strict compliance
with the Contract Documents hereinafter enumerated.
It is agreed that said labor,materials,tools,equipment,and services shall be famished and said work performed and completed under the
direction and supervision and subject to the approval of the Owner or its authorized representatives.
ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this
Contract,subject to any additions or deductions as provided in the Contract Documents,the contract prices as follows:
Item Item Unit of Estimated Item Price Total
No. Measure Quantity (in figures) (in figures)
1. Mobilization, Demobilization LS 1 22,000.00 22,000.00
and Site Cleanup
2. Sheeting, Shoring and LS 1 20,000.00 20,000.00
Bracing
3. Vault Piping and LS 1 24,000.00 24,000.00
Modifications
4A. 24-Inch Diameter WSP, LF 182 180.00 32,760.00
Standard Backfill
(Sta. 0+27 to Sta.0+90;
Sta. 10+66 to Sta. 11+85)
4B. 24-Inch Diameter WSP, LF 976 206.00 201,056.00
Slurry Backfill Class II Base
(Sta.0+90 to Sta. 10+66)
4C. 24-Inch Diameter WSP, LF 30 140.00 4,200.00
Exposed
(Sta. 11+85 to Sta. 12+15)
5. Cathodic Protection System LS 1 9,000.00 9,000.00
6. Tree Protection LS. 1 1,200.00 1,200.00
7. Tie-In at Station 12+15.61 LS 1 4,200.00 4,200.00
BID TOTAL: $318.416.00
ATTACHMENT #2
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of
this Contract.
Should any dispute arise respecting the true value of any work omitted,or of any extra work which the Contractor may be required to do,
or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the
Owner and its decision shall be final,and conclusive.
ARTICLE III,COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents,all of which are
as fully a part thereof as if herein set out in full,and if not attached,as if hereto attached:
1. Notice to Bidders and information for bidders.
2. Standard Specifications,Engineering Standards and Special Provisions.
2. Accepted Proposal.
4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire.
5. Noncollusion Declaration.
6. Plans.
7. List of Subcontractors.
8. Agreement and Bonds.
9. Insurance Requirements and Forms.
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this
instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first above written.
ATTEST: CITY OF SAN LUIS OBISPO,
A Municipal Corporation
Audrey Hooper,City Clerk David F. Romero, Mayor
APPROVED AS TO FORM: CONTRACTOR
Jonathan P.Lowell VINCIGUERRA CONSTRUCTION
City Attorney Wayne Vinciguerra,Owner
-2-