Loading...
HomeMy WebLinkAbout07/07/2009, C8 - POLYBUTYLENE SERVICES REPLACEMENT PROJECT 2, SPECIFICATION NO. 90898 Counat "-July 7,2009 j acEnoa Repout �N CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works Prepared By: Sergio Reyes, Engineering Tecluiician III SUBJECT: POLYBUTYLENE SERVICES REPLACEMENT PROJECT 2, SPECIFICATION NO.90898 RECOMMENDATION 1. Approve plans and specifications for the "Polybutylene Services Replacement Project 2, Spec. No. 90898". 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$633,645. DISCUSSION Background Polybutylene plastic water pipe first came into use in the 1970s and the City of San Luis Obispo, along with many other agencies, used the material for its water service systems. However, by the mid-1980s service failures using this type of piping system began to occur. The pipe lines had become brittle and were deteriorating much more quickly than had been anticipated. Although the City no longer allows the use of this material in new installations, an estimated 4,000 polybutylene water service lines were installed during the referenced time period. In order to systematically address the problem, the City has established an annual replacement program that is scheduled to last approximately two more years. Each year the City's water supply system is researched to determine which services are in need of immediate replacement. Funding for the polybutylene water service replacement program is allocated on an annual basis. The level of funding is appropriate to allow for a cost-effective and productive project size. Past experience has demonstrated that multiple smaller projects result in higher cost per service. The proposed project will replace approximately 290 polybutylene services, the vast majority of which are located in Paving Area 3 (Attachment 1). CONCURRENCES The Community Development Department has given this project a Categorical Exemption. � I Polybutylene Services Replacement Project Page 2 FISCAL IMPACT This project was included in the 2007-2009 Financial Plan, Appendix B, pages 3-96 through 3- 98. Funds in the amount of $350,000 have been allocated in the 2008-09 fiscal year to the Polybutylene Master Account, Specification No. 90063. With the addition of carryover funding, there is currently $359,303 available in the Master account. On July 1, 2009, an additional $350,000 will be appropriated to the Master Account for the 2009-10 fiscal year, making the grand total of$709,303. At time of contract award, there will be sufficient funding to support this project request. A budget amendment request will be processed at time of contract award to transfer funding from the Master account to the Polybutylene Services Replacement project account. Cost Detail: Project Budget Construction: $633,645 Construction Contingencies: $63,364 Total for Construction: $697,009 Printing: $500 Materials Testing: $6,000 Total for other costs: $6,500 Total Cost of Project $7039509 Available Funding Master Polybutylene Replacement Acct $709,303 ATTACHMENT Pavement Area 3 Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Special Provisions G:\Staff-Reports-Agendas-Minutes\-CAR\2009\QP\90898 Polybutylene Project 2\90898 CAR adv.doc Q�� 1 � I ATTACHMENT i V. 1 o `�-------; Area Z i Area 3 ------- ---- Area 5 -` _ _ ---------- _ -------- i i ----------- ---------------� Legend — —citylim@ —StreetOutlines PavementManagement ID zPavin Area Map3 9 05 C$-3 �6 9