HomeMy WebLinkAbout09/01/2009, C3 - UTILITY TRENCH REPAIR 2009-10 PROJECT SPECIFICATION NO. 90965 council Rw 9-1-2009 j acEnc)a nEpoit 6.N..6 �3 CITY O F SAN LUIS O B I S P O FROM: Jay D. Walter, Director of Public Works I-W Prepared By: Manny Guzman SUBJECT: UTILITY TRENCH REPAIR 2009-10 PROJECT SPECIFICATION NO. 90965 RECOMMENDATIONS 1. Approve plans and specifications for the Utility Trench Repair 2009-10 Project, Specification No. 90965. 2. Authorize staff to advertise for bids and the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$179,530. DISCUSSION Throughout the year, Utilities Department staff makes emergency repairs to water pipelines under City streets. Once these repairs are made, the trenches are backfilled and temporary asphalt patches are placed at the surface of the road. These temporary patches are then replaced with a stronger and more permanent asphalt patch performed under separate contract. The Public Works Department accumulates a list of the temporary patch locations from the Utilities Department and issues a construction contract periodically to make the permanent repairs. This project will repair approximately 188 trenches throughout the City. An advantage to this approach is that the City gets a better price for this work by combining multiple locations and permanent repairs under one contract. A complete list of locations is included in the attached Special Provisions for this project. CONCURRENCES The Community Development Department has given this project a categorical exemption from environmental review. FISCAL IMPACT The 2009-11 Financial Plan, Appendix B, pages 3-71 to 3-77, estimates an annual cost of $170,000 from the Water Distribution budget to support Utility Trench Repair projects. Because we are doing more trench work than expected a greater total surface area will be repaired, therefore the Engineer's Estimate is slightly higher on this project than the budget allocated for this project. C3 - 1 CAR-Utility Trench Repair 2009-70, Specification No. 90965 Page 2 This project will be funded by the Water Distribution System Improvement Master account, which has an available balance of$1,872,442. Staff will prepare a budget amendment request to transfer funds at time of contract award. Budget Specification No.90965 Estimate Engineer's Estimate: $179,530 Contingencies: $18,000 Material Testing. $3,000 Printing.. $470 Total for Construction: $201,000 AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Special Provisions \\dhstore2\PublicWorks\Staff-Reports-Agendas-Minutes\—CAR\2009\QP\90965 Trench Repair 2009-10\90965 CAR(Adverbse).doc C 3 -a