HomeMy WebLinkAbout10/20/2009, C3 - BOB JONES TRAIL ENHANCEMENTS, SPECIFICATION NO. 90888 council M"fi,D�
October 20 2009
j ac En da Repout Num C3
CITY OF SAN LUI S OB I SPO
FROM: Jay D. Walter, Director of Public Works JDW
Prepared By: Daniel Van Beveren, Senior Civil Engineer
SUBJECT: BOB JONES TRAIL ENHANCEMENTS, SPECIFICATION NO. 90888
RECOMMENDATIONS
1. Approve the Plans and Specifications for the Bob Jones Trail Enhancements,
Specification No. 90888.
2. Authorize staff to advertise for construction bids.
3. Authorize the City Manager to award a construction contract if the lowest responsible bid
is less than the Engineer's Estimate of$290,000.
DISCUSSION
Background
On July 5, 2005, a concept plan for the area adjacent to the Water Reclamation Facility (WRF)
was approved by City Council. This concept plan identifies specific improvements on the
City-owned property between Highway 101 and San Luis Obispo Creek. These improvements
focus on enhancing the natural wildlife habitat of the property and also consider the opportunity
for improving the appearance of this City entrance gateway as viewed from Highway 101. One
of the key features of the concept plan is a new wetland to be constructed adjacent to the Bob
Jones City-to-Sea Trail, around which the concept plan is organized.
The first phase of the Bob Jones City-to-Sea Trail was completed in 2008. The Bob Jones Trail
Enhancements project will implement additional features of the concept plan including additional
trails and a newly created wetland with an elevated boardwalk, a kiosk and interpretive outlook
adjacent to the wetland.
On July 29, 2009 a contract was awarded to CJP Productions, Inc., a local landscape architect,
for the design of the Bob Jones Trail Enhancements project. The design has been completed with
assistance from Wallace Group who provided structural engineering design of the elevated
boardwalk, and by GeoSolutions Inc., who performed soils engineering and geotechnical
recommendations for the footing design for the boardwalk.
CONCURRENCES
The Bob Jones Trail Enhancements project has received a Notice of Exemption from the
Community Development Department per the requirements of the California Environmental
Quality Act (CEQA).
�3 - 1
CAR- Bob Jones Trail Enhancements Page 2_
The Council Approved Concept Plan is endorsed by the Park and Recreation Commission, the
Architectural Review Commission and the Promotional Coordinating Committee.
The Public Works Department has applied for a building permit through the Community
Development Department for the construction of the project. The issuance of the building permit
is pending.
FISCAL IMPACT
On January 8, 2008 Council authorized staff to apply for grant funds from the Environmental
Enhancement and Mitigation Program to fund this project. The grant was successful and a budget
of$350,000 was established for this project. To date, $24,846 has been encumbered or expended.
The project has a remaining balance of$325,154.
Project Funding: Bob Jones Trail II (90888) Budget
Environmental Enhancement and Mitigation Grant: $350,000
Project Expeditures/Ecumbrances to date:
CJP Productions, Inc. $10.296
Wilson Land Survey $2,500
Wallace Group $9,400
Geosolutions, Inc. $2,650
Total : $24,846
Remaining Grant Available: $32-5,154
Estimated Construction Costs:
Engineer's Estimate $290,000
Contingencies (10%) $29,000
Misc. Construction Costs (Testing, Printing, etc.) $6,000
Total Project Budget: $325,000
ATTACHMENTS
1. Vicinity Map
2. Site Map
AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE
Plans and Specifications for the Bob Jones Trail Enhancements
T:\Council Agenda Reports\Pubhc Works CAR\2009\CLP\90888 Bob Jones Trail Enhancements\90888 eCAR
Advertise.doc
c3 --�
A-T-TAcH MENT
ts f24
to R
0 >4
z
H
Z3
CL
......... .......
0
Q6)
0
C)
Y
z I
aO OdSlSo sim mn
.?40
O
Ila
............. ..................... .......... ................................... -------------------
03 ---3
ATTACHMENT #Z
v n w u r w
.PETROLEUM
PPELINE Nq
IfII rAIIN,It
� w
I ! 111:jl ; r(rt Jj. 1 ; :.�oONWNOU
1 I 1
Illi �1 ✓�-���� �..
it
'"' • ' ' 'NI i 1
jll' I;tlrj'j 0 �' 1 j ' • 11
t;tj�lt �yn`Ip�WM
NEW
y
It�j I It!;I!! V I , E
jli j I IIIl 1'1 i 'AREA oosrom was
t, !tl.!I!
jljj� •` ��jltlt!I� � f I r�
j!Ilt ji; Ii(
i
jilitj i�I I�tl
I. EXISTING WATER VALVE 18.ROCK BOLLARDS.
2. INSTALL NEW MANUAL SOV VALVE. 19.BIKE RACKS.
3. INSTALL NEW 1-I/4 SCH.40 IRRIGATION LINE. 20.INTERPRETIVE OUTLOOK SIGN.
4. EXISTING GAS LINE TO REMAIN. 21.TWO NEW BENCHES.
5. NEW WETLAND AREA. 22.INFORMATIONAL KIOSK.
6. SHALLOW POND. 23.BOARDWALK.
7. WATERFALL ROCK 24.EDGE OF NEW WETLAND.
8. EXISTING SOIL EARTH MOUND. 25.EXISTING DRAINAGE SWALE.
9. NEW SOIL EARTH MOUND. 26.EXISTING CONCRETE DRAIN.
10.NEW BIKE PATH. 27.TWO-RAIL FENCE.
11.EXISTING BIKE PATH TO REMAIN. 28.CONCRETE CURB.
12.NEW ENTRY MONUMENT. 29.DECOMPOSED GRANITE PAVING.
13.NEW TWO-RAIL FENCE. 30.EXISTING WIRE STRAND FENCE..
14.EXISTING 24"CULVERT TO REMAIN. 31.ACCESS GATE.
15.EXISTING TWO-RAIL FENCE. 32.EXISTING TREES TO REMAIN.
16.REMOVE TWO-RAIL FENCE. 33.2-FOOT SHOULDER OF BIKE PATH.
17.NEW 24"DRAIN PIPE. 34.LARGE RIVER COBBLE RIP RAP.