Loading...
HomeMy WebLinkAbout03/02/2010, C 3 - WATER TREATMENT PLANT ROOF REPAIRS, SPECIFICATION NO. 91003 i Council, n, enact March 2,200 accnas REpoRt Iton Ntnlw CITY O F SAN LUIS O B I S P O FROM: Jay D. Walter, Director of Public Works Prepared By: Michael J. McGuire, Engineer III SUBJECT: WATER TREATMENT PLANT ROOF REPAIRS, SPECIFICATION No. 91003 RECOMMENDATIONS 1. Approve plans and specifications for "Water Treatment Plant Roof Repairs, Specification No. 91003". 2. Authorize staff to advertise for bids. 3. Authorize the City Manager to award a construction contract if the lowest responsible bid is less than the Engineer's Estimate of$135,000. DISCUSSION The roofs of the Chemical Feed, Filter Control and Ozone buildings at the City's Water Treatment Plant are in need of replacement. All three buildings have the original roofs and after inspection by a qualified roofing contractor, it was determined that all three roofs had deteriorated to varying degrees. Replacement is necessary to prevent further damage to office space below and protect vital water treatment equipment inside the buildings. The roof repairs include the removal of a plywood screen wall and unused mechanical equipment, and remodel of the front fagade of the ozone building, and the reroofing of all three buildings. CONCURRENCES This project has the concurrence of the Utilities Department and has been determined to be Categorically Exempt under the California Environmental Quality Act (CEQA) by the Community Development Department. FISCAL IMPACT The 2009-I1 Financial Plan, Appendix B, pages 3-92 to 3-95, identifies $200,000 for construction of Water Treatment Plant (WTP) Major Facility Repairs in the 2009-10 fiscal year. Of this allocation, $150,000 has been designated for the repairs and replacement of the roofs for these buildings. Staff will transfer funding by budget amendment request from the master account to the construction phase of the WTP Roof Repairs account if the bids received are within the Engineers' Estimate. At this time, there is sufficient funding in place to support the construction phase of the WTP Roof Repairs project. C3-1 i WTP Roof Repairs, Specification No. 91003 Page 2 WTP Roof 1 Construction: $ 135 000 I `Construction Contingencies: _; 14,0001 Total for Construction- $ 149,000 I Printing/Advertising: $ 1,000 Notal for other costs: —�$ 1,000 Total Cost of Project ; $ 150,000 _.... ............... — --- ---- - -- -._...-................_._................ ...._.......---...........-...-._._-. Total Available WTP Major Facility S 200,000 Maint 99653) ALTERNATIVE Deny approval for advertising. The City Council could choose to deny the approval for advertising. Staff does not recommend this alternative. Should the approval to advertise be denied or deferred, roof repairs for the three Water Treatment Plant buildings will be delayed and subject to additional water leakage into the buildings during the rainy season, resulting in water damage to the building's contents, lost work productivity of the staff and continued use of maintenance staff for repair and cleanup. AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans& Specifications. T;\Council Agenda Reports\Public Works CAR\2010\CIP\91003 WTP Reroof\91003 eCAR Advertise.doc c3 -a