HomeMy WebLinkAbout03/16/2010, C5 - DOWNTOWN WATER, SEWER AND MICROSURFACING SUMMER 2010, SPECIFICATION NO. 90976 counal nI'li.,Mw3-16-2010 j acEnba nEpom Iw,,N..6. CITY O F SAN LU I S O B I S P O FROM: Jay D. Walter, Director of Public Works low Prepared By: Manuel Guzman, Engineer II SUBJECT: DOWNTOWN WATER, SEWER AND MICROSURFACING SUMMER 2010, SPECIFICATION NO. 90976 RECOMMENDATIONS 1. Approve plans and specifications for the Downtown Water, Sewer and Microsurfacing Summer 2010 Project Specification No. 90976. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is less than or equal to the Engineer's Estimate of$559,000. DISCUSSION The City's Pavement Maintenance Plan (PMP) was adopted by the City Council on April 14, 1998. One element of the PMP is the improvement of the condition of street pavement located in the downtown area. This particular project includes the microsurfacing of Higuera from Nipomo to Marsh and Marsh from Higuera to Santa Rosa. In the past, microsurfacing has been used by the City in maintaining streets, and has been found to be an effective approach in pavement preservation. In anticipation of this microsurfacing project, the City's Street Maintenance staff has performed isolated pavement repairs and crack sealing on the streets included within the scope of this project. This preparatory work is now complete and will increase the long-term effectiveness of the microsurfacing application and reduce the construction costs. At the intersections of Marsh and Broad a sink hole has developed. Several complaints have been received by City staff. This project will repair the sink hole and replace the existing asphalt surface of other intersections that are experiencing rutting and asphalt shoving. This project also includes the installation of nine fire service laterals for downtown buildings. For several years the Utilities and Public Works Department have worked toward completion of fire service laterals for the buildings downtown. This has been completed with both waterline and street paving projects. Sewer and water improvements that will be included on this project are the replacement of two sewer mains, one on Garden between Higuera and Marsh and another one on Osos between Marsh and Pacific. Facilities at both of these locations have been identified by City staff as being hydraulically overloaded, structurally deficient or containing alignment and grade problems. Replacing these lines will result in lower operating costs and reduced customer impacts that would otherwise be associated with emergency repairs. A watermain tie-in and a watermaaiin C4-,/ Downtown Water, Sewer and Microsurfacing Summer 2010, Specification No. 90976 Page 2 replacement will also occur as part of this project. The watermain tie-in is at the intersection of Marsh and Archer, and will connect a section of main that currently dead ends, and the replacement is at Garden between Marsh and Higuera. These improvements will provide increased flow for future developments. Sewer and water improvements are included in this project because of a need to trench into areas of Marsh receiving microsurfacing and to minimize future construction related disturbances in the downtown business area. Construction Impact Mitigation To minimize the impact of construction to this high pedestrian volume shopping area,staff has worked with the Downtown Association to determine the least disruptive approach to completing this project. The project has been prepared to limit the contractor's work hours to before 11:30 AM or to require work at night from 11 PM to 7 AM. The contractor will be allowed to work a minimum of seven and a half hours so that the total duration of this intense type of work activity can be as short as possible. This approach was recommended by the Downtown Association's Economic Activity Committee and these provisions have been written into the project specifications. Community Development has reviewed and approved the City's night work request. Also discussed with the Downtown Association was the timing of the project. After considering all factors involved and to minimize the impacts to the downtown merchants and to avoid the time of year with the greatest likelihood for rain, the project has been scheduled to begin in June of this year. Relationship to Short-Term Actions in Fiscal Heath Contingency Plan The City's Fiscal Heath Contingency Plan was recently activated and as a result all CII' projects are currently under review for possible deferral or deletion. A report is planned for Council review in June 2010 that will identify and recommend project deferrals and deletions. While this review is underway and not yet completed, we recommend going forward with bidding for this project at this time for the following reasons: 1. This is maintenance-related Enterprise Fund project; and as such,it is unlikely that is would be a candidate for deletion or deferral. A majority of the project funding comes from enterprise accounts, which are less likely to be subject to CIP deferrals. 2. This project will complete necessary downtown maintenance work which will prepare the downtown for future downtown beautification work. This project does not obtain its funding from identified sources that would fund a future downtown beautification project. 3. Plans and specifications have already been prepared, and the City should capitalize on this investment. 4. Even if the project became recommended for deletion or deferral,this is only approving the bid package and authorizing inviting bids: the City could subsequently decide not to award the bid. �5-a Downtown Water, Sewer and Microsurfacing Summer 2010, Specification No. 90976 Page 3 CONCURRENCES 1. The Downtown Association's Economic Activity Committee has recommended that start of construction be scheduled for June of 2010 and that hours of work be limited as discussed in this report. 2. The Community Development Department has completed an Initial Study and issued a Mitigated Negative Declaration FISCAL IMPACT Street Reconstruction &Resurfacing Account There is currently sufficient funding in the Street Reconstruction & Resurfacing Account to support this request for $251,800. Using this account will allow the Council to reallocate funding in the Downtown Beautification Project that was intended for microsurfacing of Marsh Street. Water Fund The 2009-11 Financial Plan, Appendix B, pages 3-72 to 3-77 estimates $65,000 in the 2010-11 Project List to support the waterline improvements on Garden Street from Higuera to Marsh and an additional $30,000 for the Archer Street tie-in at Marsh. Installation of the nine fire laterals for downtown buildings are not specifically outlined in the Financial Plan. Downtown fire lateral installations are included in this project, at this time, to ensure that the underground construction is completed prior to the street microsurfacing. The water portion of the Engineer's Estimate is $191,750, which includes about 60% ($119,750) for the waterline improvements on Garden Street and the Archer Street tie-in, and about 40% ($72,000) is estimated for the fire lateral installations. The total fiscal impact for water services including contingency and construction related services is estimated at $269,850. Sufficient funding is available in the Water Distribution System Improvements Master Account to support this request for$269,850. Sewer Fund The 2009-11 Financial Plan, Appendix B, pages 3-110 to 3-115 estimates $86,000 in the 2010-11 Project List to support the sewer main replacement on Osos Street from Pacific to Marsh. Replacement of the sewer main on Garden Street from Higuera to Marsh is identified in the 2012-13 Project List, estimated at $77,000. Staff recommends the replacement of the sewer main on Garden Street be accelerated to the summer of 2010 to ensure that the underground construction is completed prior to street microsurfacing and to minimize future construction related disturbances in the downtown business area. The sewer portion of the Engineer's Estimate is $171,250, which includes the replacement of both sewer mains. The total fiscal impact for wastewater services including contingency and construction related services is estimated at $234,350. Sufficent funding is available in the Wastewater Collection System Master Account to support this request of$234,350. CS-3 Downtown Water, Sewer and Microsurfacing Summer 2010, Specification No. 90976 Page 4 Construction Inspection Services The Downtown Water, Sewer and Microsurfacing project budget does not include funding for construction management services. Based on the expected workload for current City inspection staff during the summer months and the suitability of this project for contracted construction management, staff is recommending adding funds from various accounts totaling $110,000 to fund construction management and inspection services for this project. The work underway this summer is the product of the 2007709 and 2009-11 Financial Plans, which funded a very aggressive Capital Improvement Plan. As the work from these Capital Improvement Plans are completed, the need for contract construction management should be reduced and as workloads return to prior year levels, which can be largely manageable by regular staffing resources. Estimated Project Cost by Funding Source (90346) (90227) (90239) Street R&R Water Fund Sewer Fund Total Account Distribution Collections Project Engineer's Estimate: $196,000 $191,750 $171,250 $559,000 Contingencies: $20,000 $20,000 $18,000 $58,000 Construction Management: $33,000 $44,000 $33,000 $110,000 Cultural Resources Monitoring: $0 $12,000 $10,000 $22,000 Material Testing: $2,000 $2,000 $2,000 $6,000 Printing: $800 $100 $100 $1,000 Total for Construction: $251,800 $269,850 $234,350 $756,000 Funds Available: $2,481,000 $1,399,894 $2,501,036 ATTACHMENT Location Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Special Provisions T:\Council Agenda Reports\Public Works CAR\2010\CIP\90976 Downtown Water, Sewer and Microsurfacing Summer 2010\90976 CAR Advertise.doc QS ATTACHMENT yl cy��Y yi<< �d 6R /01 odd o ZZa Rq 10 � 9l .o �0 k 0 ti \RA EY � � ��F �a C iEL71 cit n Sa11 LU SyOB1S O of DOWNTOWN WATER, SEWER AND m p MICROSURFACING SUMMER 2010 san Luis ob4o county, cagomia ��_ I r' �1 council mem ®Ranbum March 15, 2010 RED FILE MEETING AGENDA ET-COUNCIL DTDD DIR TO: City Council (�-6AO c"y 41e-e LJ'FIN DIR DAT Lwo ITEM # CUACAG 4*7/1 e DPW 0 CHIEF FROM: Jay D. Walter, Public Works Director aCLERK/ORIG aPOLICE CHF ❑ DEPT HEADS 21EC DIR VIA: Katie Lichtig, City ManagerQi O-UTIL DIR i _ - �t�un� I� FiR@Ifs SUBJECT: Downtown Paving Priorities L,.ry mcc- A question related to the Downtown Microsurfacing project (Item C5) came from Mayor Romero asking why Chorro Street, between Higuera and Palm, and Carmel Street between Higuera and Marsh, were not included in this year's Downtown street program. As part of the 2009-11 Financial Plan process, staff identified two projects for inclusion in the downtown Gateway Paving CIP,microsurfacing of Marsh Street, and reconstruction of Monterey Street. Two other projects were identified for future years, repaving Pacific Street, from Nipomo to Broad, and repaving Chorro Street, from Monterey to Higuera. Council gave direction to staff to make Monterey Street the highest priority project, followed by Marsh Street. Monterey Street is scheduled to start construction in January of 2011 to coincide with the slow time for the area businesses. Marsh Street is both an arterial and a downtown street. In the recent update to the Pavement Management Plan, the Council gave these types of streets the highest priority. The review that was done by the consultant also confirmed that maintenance of streets in good condition is money well spent. Chorro Street, for example will need complete replacement whether we do it this year or next. Staff believes if we do not make spot repairs and get Marsh Street sealed very soon, it will need complete reconstruction. The microsurfacing proposed is substantially less disruptive to the downtown than is reconstruction. For this reason, staff put forward Marsh Street as the highest priority. The streets identified by the Mayor, which he characterizes as in much worse shape than either of the streets proposed for seal coat, are anticipated to move forward for reconstruction in summer of 2011 or 2012 depending upon the needs of the other streets in the arterial system.. For further questions, please contact Public Works Director Jay Walter. 774 fs .ti�7jt l: G:\Staff-Reports-Agendas-Minutes\_CCMemos\2010\Downtown Paving Priorities.doc RECEIVE® MAR 16 2010 SLO CITY CLERK