Loading...
HomeMy WebLinkAbout07/06/2010, C 7 - WATERLINE IMPROVEMENTS - VARIOUS LOCATIONS, SPECIFICATION NO. 90935 council "R%ly 6,2010 j ac En as REpojzt ,W-Nnb. CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works BL Prepared By: Sergio Reyes, Engineering Technician III SUBJECT: WATERLINE IMPROVEMENTS - VARIOUS LOCATIONS, SPECIFICATION NO. 90935 RECOMMENDATIONS 1. Approve the plans and specifications for the "Waterline Improvements, Various Locations" Project, Specification No. 90935. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$598,412. DISCUSSION Replacement of water distribution pipes and related facilities is an ongoing program to replace aging, substandard and deteriorating infrastructure. This program has three objectives: 1) Ensure reliable water services 2) Reduce the need for emergency repairs 3) Enhance available fire flows Based on priorities set by the Utilities Department, certain waterlines have been selected for replacement as shown on Attachment 1. The assumed useful life expectancy of water lines is 50 years. The waterlines proposed for replacement with this project were originally installed in 1940s, 50s and early 60s. Presently the water mains on this project are substandard, deteriorated and leaking. Their replacement will eliminate capacity issues and improve water flow for fire protection. Replacing these waterlines will result in lower costs and reduced customer impacts that would otherwise be associated with emergency repairs and provide more time for preventive maintenance, which prolongs the expected service life of Water Distribution facilities and equipment. CONCURRENCES The Community Development Department has granted a Notice of Exemption since minimal environmental impacts are anticipated. Water Improvement Various Locations Spec. No.90935 Page 2 FISCAL IMPACT Waterline improvements are included in the 2009-11 Financial Plan Appendix B, pages 3-74 for Water Distribution System Improvements which identifies a cost estimate of$1,080,000 for this project. Funding for this project is available in the Water Distribution System Improvements Master Account which has a current available balance of$1,122,397. The estimated project costs are displayed below. A Budget Amendment Request will be processed to transfer funding from the Master account to the.project's construction account. There is sufficient funding to support this project request. Construction: $598,412 Construction Contingep�ies: $59,841 Construction Manager $100,000 Total for Construction: $758,253 1 Pig: $250 Materials Testing. $8,000 , Total for other costs: $8,250 Total Cost of Project $7669503 Dist System Impr Master Account (90227) ATTACHMENT Location Map AVAILABLE FOR REVIEW IN THE COUNCIL READING FILE Plans and Special Provisions TACouncil Agenda Reports\Public Works CAR\2010\CIP\90935 Water Improvement Various Locations\90935 CAR.doc ATTACHMENT CD GAR .FIELD Q �'O PHILLIPS PEACH_ 9 O� z CAUDILL -4, o J MO STONERI-DGE m � Q c� iIIIIIIIIIIII IIIIIIIIIIIIII�I II�IIIII IIIIII CIty Of LOCATION MAP IIII San ILOS OBISPO WATERLINE IMPROVEMENT VARIOUS LOCATIONS SPEC. NO. 90935 C°�-3